Loading...
HomeMy WebLinkAboutB-2021-01397_V2_9_23_2021N WH HVAC Septic SumpPanelSump Softener SD SD $3 $D$$ $$ $ $3 $ $ $$$ $ $3 $ Other $3 switch upstairs 2' 8” x 1' 7” 2' 8” x 1' 7”2' 8” x 1' 7”Basement Remodel – B-2021-01397 Prepared by: Shanthi Rangarao 14109 Secretariat Ct, Carmel IN 46074September 16, 2021 Storage (Finished) Bar Great Room Utility (unfinished) Utility (unfinished) Bathroom NOTE 1: Ceiling Height: 9ft Lowest ceiling under vent: 7' 7” NOTE 2: Wall Insulation – Styrofoam board and R19 Batt Insulation and Rim joist - R30 Hall 09/24/21 Floor joist Sill plate Concrete foundation wall R30 Batt Insulation Rim Joist area 1” Styrofoam stiff board moisture barrier and insulation R19 Batt insulation between studs 16” on-center 1/2” drywall Soil Concrete floor Vapor barrier subfloor OSB 23/32” Luxury Vinyl floor Wall Section (outer wall) with R values 09/24/21