HomeMy WebLinkAboutAndritz-Ruthner, Inc. ' CHANGE ORDER
j
IPROJECT: Centrifuge Dewatering Equipment CHANGE ORDER NO. 1
I 111
Contract 27
jM
I p OWNER: City of Carmel, Indiana
II CONTRACTOR: Andritz-Ruthner, Inc. CONTRACT DATE: //2 7/1/4,..%
.! The CONTRACTOR is directed to make the following changes in the Contract Documents as set
forth in this Change Order and attachments:
IDescription of Chance:
.11. Upgrade the scroll in both centrifuges to the HPX 316 I. SS enhanced performance scroll for
el' a cost of $8,400 per machine. Total cost of this change is $16,800.00
This change results in the following adjustment of Contract Price and Contract Time:
1 Original Contract Price: $ 534,063.00 Original Contract Time: 270 Days
I Contract Price Prior to $ 534,063.00 Net (Increase) resulting 0 Days
this C.O. : from this C.O. :
jNet Increase resulting $ 16,800.00 Current Contract Time 270 Days
i from this C.O. : including this C.O. :
Current Contract Price $550,863.00
including this C.O. :
1 IL
111- Recommended By: Approved By: Approved By:
jENGINEER: MANUFACTURER: OWNER:
I 1 Jones & Henry Engineers, Ltd. Andritz-Ruthner, Inc. City of Carmel, Indiana by
z Brian W. Houghton TCr1A: A. MADDE-& the Board of Public Works
Name d Title Nam Title
Ia; . t• � I
1 'ESiii r r
I 1 SW
• r „
Date: y` 27-Vu /r) Uo Date: . 1 ���:-, z1
1 Date: _ /10' /'�n
ly
te
/Pt- •
1 j