Loading...
HomeMy WebLinkAboutAndritz-Ruthner, Inc. ' CHANGE ORDER j IPROJECT: Centrifuge Dewatering Equipment CHANGE ORDER NO. 1 I 111 Contract 27 jM I p OWNER: City of Carmel, Indiana II CONTRACTOR: Andritz-Ruthner, Inc. CONTRACT DATE: //2 7/1/4,..% .! The CONTRACTOR is directed to make the following changes in the Contract Documents as set forth in this Change Order and attachments: IDescription of Chance: .11. Upgrade the scroll in both centrifuges to the HPX 316 I. SS enhanced performance scroll for el' a cost of $8,400 per machine. Total cost of this change is $16,800.00 This change results in the following adjustment of Contract Price and Contract Time: 1 Original Contract Price: $ 534,063.00 Original Contract Time: 270 Days I Contract Price Prior to $ 534,063.00 Net (Increase) resulting 0 Days this C.O. : from this C.O. : jNet Increase resulting $ 16,800.00 Current Contract Time 270 Days i from this C.O. : including this C.O. : Current Contract Price $550,863.00 including this C.O. : 1 IL 111- Recommended By: Approved By: Approved By: jENGINEER: MANUFACTURER: OWNER: I 1 Jones & Henry Engineers, Ltd. Andritz-Ruthner, Inc. City of Carmel, Indiana by z Brian W. Houghton TCr1A: A. MADDE-& the Board of Public Works Name d Title Nam Title Ia; . t• � I 1 'ESiii r r I 1 SW • r „ Date: y` 27-Vu /r) Uo Date: . 1 ���:-, z1 1 Date: _ /10' /'�n ly te /Pt- • 1 j