HomeMy WebLinkAbout06_GD1.0.SDP1
ADJOINER
TBM#4 = 779.85
TBM#2 = 781.44
2
2
3
46
5
7
8
3 SFSFSFSFSFSFSFSFSFSFSFTPTPTPTPTPTPTPTP1
1
1
1
1
3
6
2
2
5
10
TPTPTPTPTPTPSFSFSFSFSFSFSF9
3
2
9
30 9003060
INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY
ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR
WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR
EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES
SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND
WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE
OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY
ALL CONSTRUCTION.
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,
SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND
CAUTION !!
Know what's below.
before you dig.Call
R
Call 811 or 1-800-382-5544 Before You Begin Any Digging Project.
Call 48 hours or 2 working days before you dig.
It's Fast, It's Easy and It's the Law in the state of Indiana! GD1.0
SITE DEMOLITION PLAN
CONSULTANT
CARMEL CLAY SCHOOLS
WWW.FHAI.COM
ARCHITECT
317-848-0966
350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204
COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.
5201 EAST MAIN STREET
CARMEL, INDIANA
TAC SUBMITTAL
REV.
NO.DESCRIPTION DATE
ISSUE FOR BID/TAC REVIEW 03/15/20210
PROJECT NUMBER: 220144.00
PROJECT ISSUE DATE: MARCH 15, 2021
DRAWN BY: DBS
WWW.TLF-ENGINEERS.COM317-334-1500
3901 W 86TH ST #200, INDIANAPOLIS, IN 46268
EDUCATIONAL
SERVICES CENTER
ADDITION AND
REMODELING
ADDENDUM #1 04/19/20211
CITY COMMENTS 08/19/20212
DEMOLITION LEGEND
APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL
APPROXIMATE LIMITS OF CURB REMOVAL
APPROXIMATE LIMITS OF CONCRETE REMOVAL
TREE TO BE REMOVED
APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL
APPROXIMATE LIMITS OF CONSTRUCTION
DEMOLITION KEYNOTES
1.REMOVE EXISTING MONUMENT SIGN AND FOUNDATION.
2.REMOVE EXISTING CURB.
3.REMOVE EXISTING SIDEWALK AND/OR RAMP.
4.REMOVE EXISTING CONCRETE STOOP.
5.RELOCATE OR PROTECT IN PLACE EXISTING TELEPHONE LINES
(REFER TO SITE ELECTRICAL PLAN)
6.REMOVE OR RELOCATE EXISTING TELEPHONE PEDESTAL
(REFER TO SITE ELECTRICAL PLAN)
7.PROTECT EXISTING ELECTRICAL LINE TO REMAIN IN PLACE.
8.PROTECT EXISTING LIFT STATION TO REMAIN IN PLACE.
9.PROTECT AND RESET EXISTING SIGN (REFER TO SITE LAYOUT
PLAN).
10.ADJUST PULL BOXES TO NEW GRADE.
1.SEE DRAWING GD0.01 FOR GENERAL NOTES AND ADDITIONAL LEGEND.
2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED
BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO
GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL
SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.
3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT
AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH
PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO
THE ENGINEER.
4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED
STORM WATER MANAGEMENT PERMIT.
5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED
FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED
DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE
WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO
WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO
THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE
CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE
CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING
CONDITION OF THE RIGHT-OF-WAY.
7.DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS
INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO
REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE WITH NEW
CONSTRUCTION.
GENERAL NOTES
EROSION CONTROL KEYNOTES
1.SILT FENCE
2.INLET SEDIMENT PROTECTION
3.CONSTRUCTION ENTRANCE DRIVE
4.EROSION CONTROL BLANKET
5.ROCK DONUT
6.DURING CONSTRUCTION KEEP PAVEMENT AND
SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY
CONDITION. CLEAN WHEELS OF VEHICLES BEFORE
LEAVING SITE TO AVOID TRACKING SOIL ONTO ROADS
OR OTHER PAVED AREAS.
EROSION CONTROL LEGEND
SEDIMENT BAG INLET PROTECTION
SILT FENCE
APPROXIMATE LIMITS OF
CONSTRUCTION ENTRANCE
EROSION CONTROL NOTES
1.EROSION CONTROL MEASURES SHOWN ON THIS PLAN
SHALL BE INSTALLED PRIOR TO DEMOLITION.
2.SEE EROSION CONTROL PLAN ON SHEET G2.01
3.SEE EROSION CONTROL DETAILS ON SHEET G2.02
SFTP TPTREE PROTECTION REQUIRED
(SEE DETAIL - SHEET G2.02)