Loading...
HomeMy WebLinkAbout07_G1.0.SPBUILDING ADDITION 2,930 S.F. F.F.E.= ±779.75' (M.E.)6.0'10.0'34.0'ADJOINER TBM#4 = 779.85 TBM#2 = 781.44 E. MAIN STREET 10.0'10.0'6'5'6'6'10.5'R30.0'R30.0'R30.0'2 1 2 2 3 3 45 6 7 8 9 88 8 8 11 11 10 11 4 12 13 168.6'48.1'PROPOSED50' 12 R.O.W.10.0'10.0'12.2'5.0'5 . 0 '6.7'111.6' 1 1 1 . 4 '28.4'48.8'60.0'5.3'5.0' 6.1'36.1'5.0'6.5'6.0' 13 8 8 86.4' 2 4 6.0'19.3'INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! G1.0 SITE LAYOUT PLAN 1.SEE DRAWING GD0.01 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES CONSULTANT CARMEL CLAY SCHOOLS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. 5201 EAST MAIN STREET CARMEL, INDIANA TAC SUBMITTAL REV. NO.DESCRIPTION DATE ISSUE FOR BID/TAC REVIEW 03/15/20210 PROJECT NUMBER: 220144.00 PROJECT ISSUE DATE: MARCH 15, 2021 DRAWN BY: DBS WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 EDUCATIONAL SERVICES CENTER ADDITION AND REMODELING ADDENDUM #1 04/19/20211 CITY COMMENTS 08/19/20212309003060 SITE KEYNOTES 1.CONCRETE STOOP (SEE DETAIL 9/S3.03) 2.ASPHALT MULTI-USE PATH (SEE DETAIL 10-20/G4.0) 3.2' CURB TAPER (SEE DETAIL H/G4.0) 4.CURB RAMP (SEE DETAILS C/G4.0 L/G4.0 AND M/G4.0) 5.PAINTED PEDESTRIAN CROSSWALK (SEE DETAIL G/G4.0) 6.PROPOSED MONUMENT SIGN (REFER TO ARCH. PLANS) 7.RELOCATED STOP SIGN 8.CONCRETE SIDEWALK (SEE DETAIL D/G4.0) 9.6" CONCRETE CURB (SEE DETAIL A/G4.0) 10.CONCRETE EQUIPMENT PAD (SEE DETAIL J/G4.0) 11.HEAVY DUTY ASPHALT PAVEMENT (SEE DETAIL B/G4.0) 12.RELOCATED H/C PARKING SIGN 13.BICYCLE RACK PROPOSED SITE LEGEND EXISTING BUILDING PROPOSED BUILDING ADDITION CONCRETE SIDEWALK/STOOP ASPHALT MULTI-USE PATH HEAVY DUTY ASPHALT APPROXIMATE LIMITS OF CONSTRUCTION