Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
L120 - Planting Plans 1228-L123
(5) Tax-x(3) Ulm-x(5) Zel-s(3) Gin-p(1) Gin-p(1) Gle-t(1) Que-b(3) Pic-p(1) Gle-t(1) Zel-s(1) Que-b(4) Pic-g(9) Die-l(3) Ame-x(1) Gle-t(1) Zel-s(7) Phy-o(4) Pic-p(1) Nys-s(2) Pic-g(2) Pic-p(12) Ite-s(1) Lir-t(1) Que-r(3) Pic-g(15) Hyd-w(6) Myr-p(10) Ile-v(5) Myr-p(3) Phy-o(14) Die-l(1) Ulm-x(22) Ile-v(1) Bet-n(3) Cer-c(3) Phy-o(23) Die-l(1) Lir-t(2) Ame-c(14) Die-l(10) Aro-m(28) Hyd-w(3) Pic-a(31) Thu-p(12) Tax-x(5) Ile-v(3) Pic-p(13) Cal-x(10) Spo-h(14) Cal-x(9) Spo-h(15) Pan-v(11) Cal-x(36) Spo-h394'-5"67'-10"(14) Pan-v(7) Myr-p(22) Ite-s(3) Zel-s(8) Vib-x(11) Pan-v(3) Pic-a(13) Die-lLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION 0Scale 1" = 20'-0"40'20'10'NorthPlanting PlanL123Matchline - Refer to Sheet L124Matchline - Refer to Sheet L124Matchline - Refer to Sheet L122 Matchline - Refer to Sheet L122 1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.TURFGENERAL LANDSCAPE ANDPLANTING NOTESNOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARDDETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS ANDPLANT CHARTParking GarageFFE = 838.79Architecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L120 - Planting Plans 1228.dwg, September 21, 2021 1:03 PM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/25/2021PR#12602/24/2021ASI#81809/21/2021ASI#101707/01/2021PR#26Franciscan shall install, maintain for three months, andwarrantee for one year shrubs planted in the Right of way.After that time, the City of Carmel shall take ownership ofthese trees, including maintenance.