Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S102.0
N.I.C. N.I.C. SD 01 04 03 07 06 06 02 02 05 01 04 05 01 04 05 01 04 05 01 04 05 01 04 05 08 1 DEMOLITION REFLECTED CEILING PLAN 1/4" = 1'-0" KEY NOTE EXISTING CEILING GRID XX EXISTING 2X4 LIGHT FIXTURE EXISTING SUPPLY DIFFUSER EXISTING EXISTING RETURN GRILLE EXISTING LINEAR DIFFUSER EXISTING EXIT SIGN EXISTING SPRINKLER HEAD EXISTING 2X4 LIGHT FIXTURE TO BE REMOVED OR RELOCATED. REFER TO ELECTRICAL. EXISTING EMERGENCY LIGHT TO BE REMOVED ORIGINAL SHEET - ARCH E1 DATE: PRINT TIME STAMP:REVIEWED: DRAWN BY:COPYRIGHT © 2021 WALGREEN CO.WALGREENS11555 N. Meridian St.Carmel, IN 46032222702245AREA OFFICE - TWO PENN MARK - SUITE 140REVISIONSNO. DATE BY DESCRIPTIONLOC# 1397-1DESIGN PROJECT NO: Store Planning and Design Development106 Wilmot RoadDeerfield, IL 60015-5105224 S. Michigan Ave.STE 1400Chicago, IL 60604Tel: 312.554.1400 • www.stantec.comThe Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright ReservedPermit/Seal KEY PLAN:100 % CONSTRUCTION DOCUMENT REVIEW2021.06.18ISSUE FOR BIDDING AND PERMIT2021.07.02Stantec Architecture and Engineering, LLC.GENERAL DEMOLITION REFLECTED CEILING NOTES KEY NOTES LEGEND 1. COORDINATE ALL DEMOLITION WITH THE INFORMATION PROVIDED IN THIS SET OF CONTRACT DOCUMENTS. 2. ALL MATERIAL TO BE DEMOLISHED AND REMOVED SHALL BE DISPOSED OF AS APPROVED BY LOCAL ORDINANCE AND CODES. 3. THE EXISTING AREAS TO REMAIN SHALL BE PROTECTED. ALL DAMAGE RESULTING FROM WORK IN THIS CONTRACT SHALL BE RETURNED TO ITS ORIGINAL STATE. CAREFULLY DISMANTLE AND REMOVE MATERIALS SHOWN ON PLANS TO BE DEMOLISHED. NOTIFY ARCHITECT PRIOR TO CONSTRUCTION OF ANY DEMOLITION WORK THAT MAY DAMAGE THE INTEGRITY OF ANY MATERIALS WHICH ARE TO REMAIN AS EXISTING. 4. THE PREMISES IN WHICH WORK IS BEING PERFORMED SHALL BE KEPT CLEAN AT ALL TIMES. 5. WHERE FLOORS, WALLS, OR CEILINGS ARE DEMOLISHED, ALL ATTACHED ITEMS FIXTURES ACCESSORIES, DEVICES ETC SHALL BE COMPLETELY REMOVED. THIS MAY INCLUDE BUT IS NOT LIMITED TO MECHANICAL, ELECTRICAL, AND PLUMBING. IF ITEM IS REQUIRED FOR PROPER OPERATION OF ITEMS TO REMAIN, RELOCATE TO NEW LOCATION. 6. WHERE EXISTING PARTITIONS ARE TO BE REMOVED, REMOVE PARTITION COMPLETELY TO DECK. 7. REMOVE EXISTING FINISHES AS REQUIRED AS PER FINISH MANUFACTURE'S PRINTED INSTRUCTIONS, SEE FINISH SCHEDULE FOR NEW FINISHES. 8. PROTECT EXISTING FIRE PROOFING OR FIRE ASSEMBLIES INDICATED TO REMAIN, DAMAGE DURING DEMOLITION SHALL BE REPAIRED TO CONFORM TO ORIGINAL FIRE PROTECTION REQUIREMENTS. 9. AREA OR OBJECTS IDENTIFIED AS "EXISTING TO REMAIN" OR " NOT IN CONTRACT" - "N.I.C." SHALL BE PROTECTED. ALL DAMAGE TO THESE AREAS RESULTING FROM DEMOLITION WORK WITHIN THIS CONTRACT SHALL BE RETURNED TO ITS ORIGINAL STATE. 10. CONTRACTOR SHALL COORDINATE EXISTING ITEMS TO BE REUSED OR SAVED AND RETURNED TO OWNER/LANDLORD. ITEMS INCLUDE DOORS, FRAMES, HARDWARE, LOOSE EQUIPMENT, FURNITURE, LIGHT FIXTURES, AND WALL MOUNTED ITEMS. CAREFULLY REMOVE AND STORE AWAY FROM POSSIBLE DAMAGE. 11. INSTALL TEMPORARY BARRIERS TO SEPARATE CONSTRUCTION FROM OCCUPIED AREAS OR AREAS ACCESSIBLE TO PUBLIC OR OWNER EMPLOYEES. BARRIERS SHALL BE DUST TIGHT. MINIMIZE DISRUPTIONS FROM SOUND OR CONSTRUCTION EQUIPMENT AND PERSONNEL IN OCCUPIED AREAS. 12. ALL NOTICEABLE DEFECTS IN THE EXISTING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO COMMENCEMENT OF DEMOLITION. ALL DEFECTS IN THE EXISTING CONSTRUCTIONS DISCOVERED DURING DEMOLITION WILL ALSO BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ARCHITECT. 13. EXISTING WINDOW SHADES TO REMAIN. PROTECT IN PLACE. 14. G.C. TO INSPECT AND CLEAN GRID AS NEEDED. PATCH AND REPLACE CEILING GRID AND TILE AS REQUIRED. 01 EXISTING CEILING GRID AND TILE TO REMAIN. G.C. TO INSPECT GRID & TILE AND PATCH AND PLACE AS NEEDED. 02 03 04 05 06 EXISTING PARTITION TO BE REMOVED. G.C. TO PATCH AND REPAIR EXISTING GRID AND TILE AS NEEDED. ALIGN AND MATCH NEW CEILING WITH EXISTING. EXISTIING EXIT SIGNS TO REMAIN. PROTECT IN PLACE. EXISTING LIGHT FIXTURES TO REMAIN. PROTECT IN PLACE. EXISTING SUPPLY AND RETURN GRILLE TO REMAIN. PROTECT IN PLACE. EXISTING LIGHT FIXTURES TO BE SALVAGED FOR REUSE. REFER TO ELECTRICAL. 07 EXISTING GRILLE TO BE REMOVED. REFER TO MECHANICAL. AD-102A.SANCHEZDEMOLITION REFLECTED CEILING PLAN21.07.02B. STANKOSA.S.A.S.08 EXISTING LIGHT SWITCH TO BE RELOCATED AS REQUIRED, REFER TO ELECTRICAL. 09/29/21