Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S106.0
N.I.C. N.I.C.DATACABFE P65/62 P65/62 P65/62 P65/62T1T1FRIDGEMICRO.WP1 BR1 FC2 WP1 BR1 FC2 WP1 BR1 FC2 WP1 BR2 FR1 WP1 BR1 FC1 WP1 BR1 FC1 WP1 BR1 FC1 WP4 WP2 WP2 WP2 WP2WP5 WP1 BR1 FC1 RECEPTION 100 STORAGE 101 KITCHEN 102 HUDDLE ROOM 106 FOCUS 107 WORK/COPY 104 OPEN OFFICE 105 FOCUS 103 01 1 FINISH PLAN 1/4" = 1'-0" ORIGINAL SHEET - ARCH E1 DATE: PRINT TIME STAMP:REVIEWED: DRAWN BY:COPYRIGHT © 2021 WALGREEN CO.WALGREENS11555 N. Meridian St.Carmel, IN 46032222702245AREA OFFICE - TWO PENN MARK - SUITE 140REVISIONSNO. DATE BY DESCRIPTIONLOC# 1397-1DESIGN PROJECT NO: Store Planning and Design Development106 Wilmot RoadDeerfield, IL 60015-5105224 S. Michigan Ave.STE 1400Chicago, IL 60604Tel: 312.554.1400 • www.stantec.comThe Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright ReservedPermit/Seal KEY PLAN:100 % CONSTRUCTION DOCUMENT REVIEW2021.06.18ISSUE FOR BIDDING AND PERMIT2021.07.02Stantec Architecture and Engineering, LLC.LEGEND CARPET TILE: FC-1 CARPET TILE: FC-2 RESILIENT FLOORING: FR-1 CORNER GUARD: CG1 DIRECTION OF FLOORING MATERIAL; STRIPE OR PLANK WALL FLOOR BASE FINISH TAGS FLOOR TRANSITION A-103FINISH PLANKEY NOTES 01 WALL AND FLOOR FINISHES TO MATCH EXISTING BASE BUILDING CORRIDOR. G.C. TO COORDINATE WITH LANDLORD AS REQUIRED.A.SANCHEZ21.07.02B. STANKOSA.S.A.S.GENERAL NOTES 1. REFER TO FINISH SCHEDULE, SHEET A-300 09/29/21