Loading...
HomeMy WebLinkAboutE100.1ORIGINAL SHEET - ARCH E1 DATE:PRINT TIME STAMP:REVIEWED: MTFDRAWN BY: ABCOPYRIGHT © 2021 WALGREEN CO.WALGREENS11555 N. Meridian St.Carmel, IN 46032222702245AREA OFFICE - TWO PENN MARK - SUITE 140REVISIONSNO. DATE BY DESCRIPTIONLOC# 1397-1DESIGN PROJECT NO: Store Planning and Design Development106 Wilmot RoadDeerfield, IL 60015-5105224 S. Michigan Ave.STE 1400Chicago, IL 60604Tel: 312.554.1400 • www.stantec.comThe Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright ReservedPermit/Seal KEY PLAN:100 % CONSTRUCTION DOCUMENT REVIEW2021.06.18ISSUE FOR BIDDING AND PERMIT2021.07.02Stantec Architecture and Engineering, LLC.E-001Electrical SpecificationsELECTRICAL SPECIFICATIONS GENERAL PROJECT REQUIREMENTS AND CONDITIONS A. FURNISH LABOR, MATERIALS, TOOLS, AND EQUIPMENT NECESSARY FOR THE WORK INCLUDED UNDER THIS CONTRACT. WORK SHALL BE COMPLETED AND EQUIPMENT INSTALLED IN STRICT ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL LAWS, ORDINANCES AND REGULATIONS. B. SHOULD A BIDDER FIND DISCREPANCIES IN, OR OMISSIONS FROM, THE DRAWINGS OR SPECIFICATIONS, OR SHOULD HE BE IN DOUBT AS TO THEIR MEANING, HE SHOULD AT ONCE NOTIFY THE ARCHITECT, WHO WILL SEND WRITTEN INSTRUCTIONS TO ALL BIDDERS. IF THESE ARE IGNORED BY THE CONTRACTOR, HE WILL BE RESPONSIBLE FOR FURNISHING THE PROPER OR WORKABLE EQUIPMENT AS DEEMED NECESSARY BY THE ARCHITECT / ENGINEER. C. BEFORE SUBMITTING A BID, BIDDERS WILL BE HELD RESPONSIBLE TO HAVE VISITED THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL EXISTING CONDITIONS AND LIMITATIONS, INCLUDING RULES, RATES AND FRINGE BENEFITS, TRAVEL PAY, AFFILIATION FEES AND TRANSPORTATION EXPENSE PREVAILING IN THE LOCAL LABOR MARKET, AND NO ALLOWANCE SHALL SUBSEQUENTLY BE MADE ON BEHALF OF THE BIDDER BY REASON OF ANY ERROR ON HIS PART. D. ADDENDA: ANY INTERPRETATION, CORRECTIONS OR CHANGES OF THE DRAWINGS AND SPECIFICATIONS WILL BE MADE ONLY BY AN ADDENDUM ISSUED BY THE ARCHITECT AND A COPY OF SUCH ADDENDUM WILL BE TRANSMITTED TO EACH BIDDER. IT IS THE BIDDER'S RESPONSIBILITY TO CONVEY ADDENDUM INFORMATION TO ANY PARTY PROVIDING EQUIPMENT OR LABOR QUOTATIONS TO THE BIDDER. E. NO CLAIM OR ADDITIONAL COMPENSATION WILL BE ENTERTAINED ON BEHALF OF OR PAID TO THIS CONTRACTOR ON ACCOUNT OF HIS FAILURE TO BE INFORMED OF THE ABOVE CONDITIONS AND REQUIREMENTS. F. WORK SHALL BE EXECUTED AND EQUIPMENT CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH AMERICANS WITH DISABILITIES ACT, OSHA, ASME, NATIONAL FIRE PROTECTION ASSOCIATION, NATIONAL ELECTRICAL CODE, INTERNATIONAL ENERGY CONSERVATION CODE, AND OTHER APPLICABLE FEDERAL, STATE, COUNTY AND MUNICIPAL ORDINANCES AND REGULATIONS. NOTHING CONTAINED IN THESE SPECIFICATIONS OR SHOWN ON THE DRAWINGS SHALL BE CONSTRUED TO CONFLICT WITH THE AFORESAID CODES, ORDINANCES OR REGULATIONS. CERTIFICATES OF APPROVAL SHALL BE OBTAINED FROM ANY DEPARTMENT ISSUING SAME AND SHALL BE TURNED OVER TO THE OWNER AT THE COMPLETION OF THE WORK. FEES AND PERMITS REQUIRED SHALL BE OBTAINED BY THE CONTRACTOR AND THE COST SHALL BE INCLUDED IN THE CONTRACT PRICE. G. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS OF ALL TRADES AND CARRY ON HIS WORK SO AS NOT TO DELAY OR INTERFERE WITH THE WORK OF OTHER TRADES. HE SHALL OBTAIN IN WRITING FROM THE OTHER CONTRACTORS SUCH DATA AS IS NECESSARY TO COORDINATE HIS WORK WITH OTHER BRANCHES. UPON COMPLETION OF THE WORK, REMAINING WASTE MATERIALS AND RUBBISH RESULTING FROM THE CONTRACT WORK SHALL BE REMOVED FROM THE BUILDING AND PREMISES. H. THE MATERIALS USED THROUGHOUT SHALL BE THOSE OF REPUTABLE MANUFACTURERS AND SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KINDS. EQUIPMENT, COMPONENTS AND MATERIALS SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH BEST TRADE PRACTICES, MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS AND BY TRADES PERSONS SKILLED IN EACH PARTICULAR BRANCH OF THE WORK ASSIGNED TO THEM. WORK SHALL BE INSTALLED SUBJECT TO THE APPROVAL OF THE ARCHITECT AND ENGINEER. 1. REFER TO THE ARTICLE TITLED “SUBMITTALS” BELOW. 2. WHERE THE CONTRACTOR IS REQUIRED TO SUBSTITUTE APPROVED MATERIALS OR EQUIPMENT FOR MATERIALS OR EQUIPMENT SPECIFIED, HE WILL BE HELD RESPONSIBLE FOR STRUCTURAL, MECHANICAL AND ELECTRICAL CHANGES REQUIRED FOR THEIR INSTALLATION AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PROVIDING DETAILED DRAWINGS OF PROPOSED CHANGES TO THE ARCHITECT FOR APPROVAL. REFER TO THE ARTICLE TITLED “SUBSTITUTIONS” BELOW. 3. THE CONTRACTOR SHALL FURNISH THE SERVICES OF MANUFACTURERS' REPRESENTATIVES FOR EQUIPMENT FURNISHED UNDER THESE CONTRACT DOCUMENTS. THE AMOUNT OF FACTORY SERVICE PROVIDED BY THE CONTRACTOR SHALL BE AS NORMALLY RECOMMENDED AND FURNISHED BY THE VARIOUS EQUIPMENT MANUFACTURERS UNLESS SPECIFIED OTHERWISE. TESTING OF SUCH SYSTEMS AND EQUIPMENT SHALL BE MADE UNDER THE DIRECT SUPERVISION OF COMPETENT AUTHORIZED SERVICE REPRESENTATIVES. EXPENSES INCURRED BY THE EQUIPMENT MANUFACTURERS' REPRESENTATIVES SHALL BE BORNE BY THE CONTRACTOR. 4. EQUIPMENT AND MATERIALS SHALL BE MANUFACTURED IN ACCORDANCE WITH NATIONAL STANDARDS ESTABLISHED BY MANUFACTURER'S ASSOCIATIONS, ENGINEERING AND TESTING SOCIETIES, SUCH AS NEMA, ASTM, AMCA, ASME, ANSI, ETC., WHERE SUCH STANDARDS HAVE BEEN ESTABLISHED. I. THE CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE FOR APPARATUS, EQUIPMENT AND APPURTENANCES FURNISHED BY HIM OR HIS SUBCONTRACTORS IN CONNECTION WITH THE WORK AND CARE SHALL BE TAKEN TO PROTECT PARTS THEREOF IN SUCH MANNER AS MAY BE NECESSARY OR AS MAY BE DIRECTED. PROTECTION SHALL INCLUDE COVERS, CRATING, SHEDS, OR OTHER MEANS TO PREVENT DIRT, GRIT, OR OTHER FOREIGN SUBSTANCES FROM ENTERING THE WORKING PARTS OF EQUIPMENT. SPECIAL CARE SHALL BE TAKEN TO KEEP OPEN ENDS OF PIPES CLOSED WHILE IN STORAGE AND DURING INSTALLATION. WHERE EQUIPMENT MUST BE STORED OUTSIDE THE BUILDING, IT SHALL BE TOTALLY COVERED AND SECURED WITH HEAVY WATERPROOF TARPS AND KEPT DRY. WHERE EQUIPMENT OR MATERIALS HAVE BEEN SUBJECTED TO MOISTURE, THEY SHALL NOT BE PERMITTED TO BE USED ON THE PROJECT UNLESS APPROVED BY THE ARCHITECT. J. GRADES, ELEVATIONS AND LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATELY; HOWEVER, THE CONTRACTOR SHALL FIELD CHECK AND OTHERWISE VERIFY SUCH DATA AT THE SITE BEFORE PROCEEDING WITH THE WORK. 1. THE CONTRACTOR SHALL VISIT THE SITE AND THOROUGHLY ACQUAINT HIMSELF WITH CONDITIONS EXISTING AT THE SITE BEFORE SUBMITTING HIS PROPOSAL AS HE WILL BE HELD RESPONSIBLE FOR THE INSTALLATION OF THE WORK COMPLETE IN EVERY DETAIL. 2. WORK SHOWN ON THE DRAWINGS AND NOT SPECIFICALLY INCLUDED IN THE SPECIFICATIONS SHALL BE CONSIDERED A PART OF THE CONTRACT WORK. WORK INCLUDED IN THE SPECIFICATIONS AND NOT SPECIFICALLY INCLUDED ON THE DRAWINGS SHALL ALSO BE CONSIDERED A PART OF THE CONTRACT WORK. 3. CAREFULLY EXAMINE DRAWINGS INCLUDED UNDER THIS CONTRACT AND DRAWINGS INCLUDED UNDER OTHER CONTRACTS AND REPORT ANY DISCREPANCIES NOTICED TO THE ARCHITECT. K. WHERE COMPLIANCE WITH TWO OR MORE INDUSTRY STANDARDS OR SETS OF REQUIREMENTS IS SPECIFIED AND OVERLAPPING OF THOSE DIFFERENT STANDARDS OR REQUIREMENTS ESTABLISHES DIFFERENT OR CONFLICTING MINIMUMS OR LEVELS OF QUALITY, THE MOST STRINGENT REQUIREMENT IS INTENDED AND WILL BE ENFORCED. REFER UNCERTAINTIES AS TO WHICH LEVEL OF QUALITY IS MORE STRINGENT, TO THE ARCHITECT FOR A DECISION BEFORE PROCEEDING. L. WHEN THE INSTALLATION IS REPORTED IN WRITING BY THE CONTRACTOR TO BE COMPLETE AND READY FOR ACCEPTANCE, TESTS AND INSPECTION SHALL BE MADE BY THE CONTRACTOR IN THE PRESENCE OF THE ARCHITECT TO ASCERTAIN WHETHER IT COMPLIES WITH THE SPECIFICATIONS AND CONTRACT AND UPON ITS FAILURE TO DO SO, THE CONTRACTOR SHALL AT ONCE REMEDY DEFECTS AND SHORTCOMINGS AND ANY ADDITIONAL TESTS THAT MAY BE REQUIRED SHALL BE ENTIRELY AT THE CONTRACTOR'S EXPENSE. TESTING WORK SHALL BE DONE WHEN AND AS DIRECTED BY THE ARCHITECT BEFORE THE SYSTEM IS ACCEPTED. M. IN CASES WHERE EQUIPMENT AND MATERIALS ARE SPECIFIED IN THE SINGULAR OR PLURAL NUMBER, IT IS INTENDED THAT SUCH REFERENCE SHALL APPLY TO AS MANY SUCH ITEMS AS ARE REQUIRED TO COMPLETE THE INSTALLATION. N. WHERE PIPING, DUCTS, OR OTHER EQUIPMENT PASS THROUGH FIRE OR SMOKE RATED CONSTRUCTION, THIS CONTRACTOR SHALL FURNISH AND INSTALL SLEEVES AND SHALL THOROUGHLY SEAL OPENINGS AROUND SLEEVES, PIPES, ETC. WITH FIRE AND SMOKE RESISTANT MATERIALS. MATERIALS SHALL BE FURNISHED BY THE CONTRACTOR TO MAINTAIN THE FIRE RATING OF THE ADJACENT CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA AND INDUSTRY AND OTHER APPLICABLE CODES. O. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE COMPLETION OF WORK INCLUDED UNDER THIS CONTRACT AND SHALL EMPLOY SKILLED AND QUALIFIED TRADES PERSONS AS NECESSARY TO SATISFY WORK AND TRADES. DEFINITIONS A. FINISHED SPACES: SPACES OTHER THAN MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, FURRED SPACES, PIPE AND DUCT SHAFTS, UNHEATED SPACES IMMEDIATELY BELOW ROOF, SPACES ABOVE CEILINGS, UNEXCAVATED SPACES, CRAWL SPACES, AND TUNNELS. B. EXPOSED, INTERIOR INSTALLATIONS: EXPOSED TO VIEW INDOORS. EXAMPLES INCLUDE FINISHED OCCUPIED SPACES AND MECHANICAL EQUIPMENT ROOMS. C. CONCEALED, INTERIOR INSTALLATIONS: CONCEALED FROM VIEW AND PROTECTED FROM PHYSICAL CONTACT BY BUILDING OCCUPANTS. EXAMPLES INCLUDE ABOVE CEILINGS AND IN DUCT SHAFTS. D. THE WORD "BUILDING" USED THROUGHOUT THESE SPECIFICATIONS SHALL BE INTERPRETED TO MEAN THE AREAS OF THE BUILDING WHERE WORK IS INCLUDED UNDER THIS CONTRACT. E. WHERE THE PHRASE "OR APPROVED EQUAL," "OR EQUAL," OR "APPROVED" APPEARS IN THESE SPECIFICATIONS, IT SHALL REFER TO THE APPROVAL OF THE ARCHITECT AND ENGINEER ON THE MATERIAL OR EQUIPMENT INVOLVED. F. EXCEPT AS OTHERWISE DEFINED, THE TERM "FURNISH" IS USED TO MEAN SUPPLY AND DELIVER TO PROJECT SITE. EXCEPT AS OTHERWISE DEFINED, THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT SITE INCLUDING UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING, ANCHORING, FINISHING, PROTECTING, CLEANING, TESTING, START-UP AND SIMILAR OPERATIONS, AS APPLICABLE IN EACH INSTANCE. EXCEPT AS OTHERWISE DEFINED, THE TERM "PROVIDE" MEANS TO BOTH FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE, AS APPLICABLE IN EACH INSTANCE. QUALITY ASSURANCE A. EQUIPMENT SELECTION: ALL EQUIPMENT AND APPURTENANCES SHALL BE SELECTED TO MEET THE MATERIAL AND CONSTRUCTION REQUIREMENTS CONTAINED WITHIN THIS SPECIFICATION AS WELL AS THE PHYSICAL CONSTRAINTS OF EACH FACILITY. ALL LISTED PERFORMANCE STANDARDS SHALL BE CONFORMED TO OR EXCEEDED UPON COMPLETION AND OPERATION OF EACH SYSTEM. ALL EQUIPMENT AND MATERIALS SHALL BE NEW AND FREE FROM DAMAGE AND DEFECT. B. EQUIPMENT SPECIFIED WITHIN THIS SPECIFICATION AND SCHEDULED ON THE DRAWINGS SHALL BE THE BASIS OF DESIGN OF EACH SYSTEM. EQUIVALENT EQUIPMENT BY ONE OF THE APPROVED MANUFACTURERS SHALL MATCH THE TYPE, STYLE, PERFORMANCE, EFFICIENCY, CONSTRUCTION AND QUALITY OF THE SPECIFIED PRODUCT. REVIEW OF EACH PROPOSED PRODUCT WILL BE PERFORMED BY THE ARCHITECT AND ENGINEER FOR APPROVAL AFTER CONTRACT AWARD. C. DUST, DIRT AND NOISE: THE CONTRACTOR SHALL CARRY OUT ALL NEW WORK AND SHALL MAKE ALL CHANGES, RELOCATIONS AND INSTALLATIONS WITH A MINIMUM OF NOISE. ALL SITE AREAS SHALL BE ADEQUATELY PROTECTED FROM DAMAGE, DUST, AND DIRT CAUSED BY THE WORK. PROTECTION SHALL INCLUDE SUITABLE TEMPORARY BARRIERS OR COVERINGS. THE EXTERIOR AND INTERIOR PREMISES OF EACH BUILDING SHALL BE KEPT AS CLEAN AS POSSIBLE DURING CONSTRUCTION. D. REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR TO EXISTING TO REMAIN SURFACES, MATERIALS, OR EQUIPMENT. THE COST OF REPAIR SHALL BE BORNE BY THE CONTRACTOR. E. PROTECT ALL DUCTWORK AND EQUIPMENT FROM DIRT, DEBRIS AND MOISTURE. DUCTWORK SHALL HAVE ALL OPENINGS COVERED UNTIL SYSTEM IS OPERATIONAL. DUCTWORK AND EQUIPMENT SHALL NOT BE STORED IN AREAS THAT ARE NOT COMPLETELY SEALED FROM THE WEATHER. ALL DUCTWORK SHALL BE STORED ELEVATED ABOVE THE FLOOR SURFACE. ANY DUCTWORK AND EQUIPMENT NOT PROTECTED SHALL BE CLEANED, TREATED OR REPLACED ACCORDING TO LEVEL OF EXPOSURE. F. ALL MATERIALS AND EQUIPMENT SHALL BEAR THE UL LISTING OF APPROVAL. PROCEDURES A. THE ACTUAL RUNS AND LOCATIONS OF ALL CONDUITS, PIPES, DUCTS, ETC. AND EQUIPMENT SHALL BE DETERMINED ON THE SITE AND SHALL BE INSTALLED TO MEET THE VARIOUS CONDITIONS AT THE BUILDING. ANY CHANGES NECESSARY TO CONCEAL CONDUIT OR CLEAR EXISTING PIPES, EQUIPMENT OR CONSTRUCTION SHALL BE MADE WITHOUT ADDITIONAL EXPENSE TO THE LANDLORD OR OWNER. DO NOT SCALE THE DRAWINGS. B. THE CONTRACTOR SHALL MAKE FINAL CONNECTIONS BETWEEN ALL EQUIPMENT FURNISHED UNDER THIS CONTRACT AND PROVIDE SERVICES AND MAKE FINAL ELECTRICAL CONNECTIONS TO ALL EQUIPMENT, EXCEPT AS SPECIFIED HEREINBEFORE. THE CONTRACTOR SHALL PROVIDE, INSTALL AND CONNECT ALL POWER WIRING OF CABLES TO ALL EQUIPMENT REQUIRING SAME UNLESS SPECIFIED OTHERWISE IN THESE SPECIFICATIONS. ALL WIRING SHALL BE COMPLETE ACCORDING TO THE SHOP DRAWINGS SUBMITTED FOR THE RESPECTIVE PIECES OF EQUIPMENT. C. THE CONTRACTOR SHALL FURNISH ANY CHASES OR OPENINGS REQUIRED UNDER THIS CONTRACT. NO CUTTING SHALL BE DONE WHICH MAY AFFECT THE BUILDING STRUCTURALLY OR ARCHITECTURALLY WITHOUT PRIOR APPROVAL BY THE ARCHITECT. ALL DAMAGED CONSTRUCTION SHALL BE RESTORED TO ITS ORIGINAL CONDITION AND FINISHED TO MATCH THE SURROUNDING WORK. D. DIMENSIONS SHOWN ON THE DRAWINGS ARE APPROXIMATELY; HOWEVER, THE CONTRACTOR SHALL FIELD CHECK AND OTHERWISE VERIFY ALL SUCH DATA AT THE SITE BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL MAKE NECESSARY SURVEY EQUIPMENT AVAILABLE AT ALL TIMES AND SHALL MAKE USE OF SUCH EQUIPMENT WHEREVER NECESSARY TO PROPERLY INSTALL HIS EQUIPMENT. E. WHERE THE CONTRACTOR IS REQUIRED TO SUBSTITUTE APPROVED MATERIALS OR EQUIPMENT FOR MATERIALS OR EQUIPMENT SPECIFIED, HE WILL BE HELD RESPONSIBLE FOR ALL STRUCTURAL, MECHANICAL AND ELECTRICAL CHANGES REQUIRED FOR THEIR INSTALLATION, AT NO ADDITIONAL COST TO THE OWNER OR LANDLORD. WARRANTY A. CONTRACTOR SHALL WARRANT THAT THE MATERIALS AND WORKMANSHIP USED IN THE ERECTION OF THIS INSTALLATION ARE AS SPECIFIED AND HE SHALL PROVIDE LABOR, MATERIALS AND EQUIPMENT REQUIRED TO MAKE GOOD ANY DEFECTS IN SAME WHICH BECOME APPARENT WITHIN ONE (1) YEAR FROM DATE OF SUBSTANTIAL COMPLETION PROVIDING SUCH DEFECTS ARE DUE TO FAULTY MATERIALS OR WORKMANSHIP AND NOT TO MISUSE OF APPARATUS BY THE LANDLORD OR OWNER, HIS EMPLOYEES, OR TENANTS. CERTAIN EQUIPMENT SHALL BE WARRANTED OR GUARANTEED FOR LONGER THAN ONE YEAR WHERE SPECIFICALLY MENTIONED IN THESE SPECIFICATIONS. THE CONTRACTOR SHALL REPLACE ALL DEFECTIVE MATERIAL AND WORKMANSHIP FURNISHED AND INSTALLED BY HIM AND ALL OTHER WORK AND EQUIPMENT DAMAGED THEREBY WITHOUT COST TO THE OWNER. B. IN ADDITION TO THE ONE YEAR GUARANTEE, THE CONTRACTOR SHALL FURNISH ANY WARRANTIES OR GUARANTEES THAT NORMALLY COME WITH SPECIFIC PIECES OF EQUIPMENT THAT EXCEEDS THE ONE YEAR GUARANTEE. THESE ADDITIONAL WARRANTIES SHALL BE GIVEN TO THE OWNER FOR THE TIME PERIOD SPECIFIED. C. THE EQUIPMENT AND MATERIALS MANUFACTURERS ARE EXPECTED TO RECOGNIZE THAT THEY ARE RESPONSIBLE FOR THE FAILURE OF THEIR PRODUCTS TO PERFORM IN ACCORDANCE WITH DATA FURNISHED BY THEM OR THEIR AUTHORIZED REPRESENTATIVES AS WELL AS MISREPRESENTATION OF SUCH DATA. WHEN THE PRODUCTS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED OR WRITTEN INSTRUCTIONS AND RECOMMENDATIONS AND SUCH PRODUCTS FAIL, THEN THE CONTRACTOR AND THE MANUFACTURER ARE RESPONSIBLE FOR REPLACEMENT OF THE PRODUCTS AND ASSOCIATED WORK AND MATERIALS WITHOUT ADDITIONAL COST TO THE LANDLORD OR OWNER. THIS WARRANTY APPLIES TO ALL ITEMS SUPPLIED ON THE EQUIPMENT AND NOT JUST THOSE THAT ARE THE PRODUCT OF THE MANUFACTURER. SUBMITTALS A. THE CONTRACTOR SHALL PROVIDE PRODUCT DATA, SHOP DRAWINGS FOR ALL MATERIALS PROPOSED FOR INSTALLATION UNDER THIS CONTRACT AS LISTED BELOW. REQUIRED SUBMITTALS SHALL BE APPROVED BY THE ARCHITECT / ENGINEER BEFORE SUCH EQUIPMENT IS DELIVERED TO THE SITE. B. THE CONTRACTOR SHALL, UPON THE APPROVAL BY THE ARCHITECT AND THE OWNER, IMMEDIATELY PLACE ORDERS FOR ALL MAJOR ITEMS OF EQUIPMENT COMPLETE WITH CONTROLS AND APPURTENANCES. THE CONTRACTOR IS REMINDED THAT ANY DELAY IN ORDERING EQUIPMENT WILL DELAY OPERATION OF THE WORK. ALL WORK ASSOCIATED WITH THE MAJOR ITEMS OF EQUIPMENT, SUCH AS STRUCTURAL SYSTEMS, CONCRETE WORK, PIPING, CONDUIT AND WIRING, SHALL BE INSTALLED WHILE APPROVED EQUIPMENT IS ON ORDER AND SHALL BE COMPLETE, READY TO RECEIVE EQUIPMENT, WHEN SAME ARRIVES ON SITE. C. UNLESS OTHERWISE NOTED, FURNISH ELECTRONIC COPIES IN PORTABLE DOCUMENT FORMAT (PDF) OF ALL SUBMITTALS. IDENTIFY SUBMITTALS WITH THE FOLLOWING INFORMATION PERMANENTLY ADHERED TO OR NOTED ON EACH SEPARATE COMPONENT OF EACH SUBMITTAL AND ALSO NOTED ON THE TRANSMITTAL FORM. MARK EACH COPY OF EACH SUBMITTAL IDENTICALLY, WITH THE FOLLOWING: 1. PROJECT TITLE AND LOCATION. 2. CONTRACTOR NAME AND CONTACT INFORMATION. 3. THE NAME, ADDRESS AND TELEPHONE NUMBER OF THE SUPPLIER AND THE ASSOCIATED MANUFACTURER. D. FURNISH PRODUCT DATA SUBMITTALS OR SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND COMPONENTS FURNISHED UNDER THIS CONTRACT: 1. WIRING DEVICES (RECEPTACLES) 2. LIGHTING 3. LIGHTING CONTROLS 4. PANELBOARD 5. EMERGENCY VOICE COMMUNICATIONS/FIRE ALARM E. AS-BUILT DRAWINGS: AS THE WORK PROGRESSES, THE CONTRACTOR SHALL RECORD ON PRINTS OF THE CONTRACT DRAWINGS, CHANGES AND DEVIATIONS MADE FROM THE ORIGINAL CONTRACT DRAWINGS. IT IS MANDATORY THAT THE FIELD PERSONNEL ON THE JOB SITE RECORD CONSTRUCTION CHANGES, REVISIONS AND MODIFICATIONS FOR THE LIFE OF THE PROJECT. MEASUREMENTS SHALL INCLUDE ELEVATIONS AND SUFFICIENT OFFSET MEASUREMENTS FROM BUILDINGS TO DEFINITELY LOCATE LINES AND EQUIPMENT INSTALLED OR CONSTRUCTED UNDER THIS DIVISION. THE MARKED SET OF PRINTS SHALL BE DELIVERED TO THE ARCHITECT / ENGINEER BEFORE FINAL ACCEPTANCE AND APPROVAL. F. REFER TO THE “SUBSTITUTIONS” ARTICLE BELOW FOR ADDITIONAL SUBMITTAL REQUIREMENTS. SUBSTITUTIONS A. THE SUBMISSIONS ARE THE CONTRACTOR'S DOCUMENTS AND THE ARCHITECT'S APPROVAL CONSTITUTES AN ACKNOWLEDGMENT THAT THE DOCUMENTS HAVE BEEN SUBMITTED AND NOTHING MORE. NO ACTION TAKEN BY THE ARCHITECT ON A SUBMITTAL CHANGES THE REQUIREMENT OF THE CONTRACT. FURTHERMORE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK HIS OWN SUBMISSIONS FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS AND JOB CONDITIONS. B. THROUGHOUT THE SPECIFICATIONS, TYPES OF MATERIALS MAY BE SPECIFIED BY MANUFACTURER'S NAME AND CATALOG NUMBER IN ORDER TO ESTABLISH STANDARDS OF QUALITY AND PERFORMANCE AND NOT FOR THE PURPOSE OF LIMITING COMPETITION. UNLESS SPECIFICALLY STATED OTHERWISE, THE BIDDER MAY ASSUME THE PHRASE "OR APPROVED EQUAL," EXCEPT THAT THE BURDEN IS UPON THE BIDDER TO PROVE SUCH EQUALITY. IF THE BIDDER ELECTS TO PROVE SUCH EQUALITY, HE MUST REQUEST THE ARCHITECT'S AND ENGINEER'S APPROVAL, IN WRITING, TO SUBSTITUTE SUCH ITEM FOR THE SPECIFIED ITEM AND SHALL SUBMIT SUPPORTING DATA AND SAMPLES IF REQUIRED, TO PERMIT A FAIR EVALUATION OF THE PROPOSED SUBSTITUTION WITH RESPECT TO QUALITY, SERVICEABILITY AND WARRANTY. C. WHEN THIS CONTRACTOR DESIRES TO FURNISH EQUIPMENT OF A MANUFACTURER OTHER THAN THAT SPECIFIED OR INTENDED, HE SHALL INCLUDE A COMPLETE SPECIFICATION OF THE SUBSTITUTED ITEM ALONG WITH EACH SUBMISSION COPY OF SHOP DRAWINGS INDICATING THE NECESSARY MODIFICATIONS TO THE SUBSTITUTED PRODUCT TO SATISFY THE REQUIREMENTS OF THE CONTRACT SPECIFICATIONS. MANUFACTURER'S SPECIFICATIONS SHALL BE WRITTEN AS CLOSE AS POSSIBLE OVER THE CONTRACT SPECIFICATIONS AND EACH PARAGRAPH SHALL BEAR THE SAME PARAGRAPH NUMBER AS THE CONTRACT SPECIFICATIONS SO THAT CLOSE COMPARISON CAN BE MADE. SUBMISSIONS WILL BE RETURNED SHOULD THEY NOT INCLUDE THE COMPARISON SPECIFICATION. D. THE VERIFICATION SPECIFICATION SHALL INCLUDE THE EXACT WORDING OF THE CONTRACT SPECIFICATION AND THE REVISED WORDING IDENTIFIED PROPERLY INDICATING THE DEVIATIONS PROPOSED. IF NO DEVIATIONS ARE NOTED THE CONTRACTOR MUST FURNISH THE MATERIAL OR EQUIPMENT IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. E. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING THAT ALL SPECIFIED PRODUCTS WILL BE AVAILABLE IN A TIMELY MANNER TO MEET THE CONTRACT SCHEDULE. SHOULD THE DELIVERY TIME SCHEDULE OF ANY SPECIFIED PRODUCT BE AN ISSUE THAT COULD ADVERSELY AFFECT THE PROJECT SCHEDULE, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER, IN WRITING, WITHIN 14 DAYS FOLLOWING THE AWARD OF THE CONTRACT. DOCUMENTATION AS TO WHEN SPECIFIED PRODUCTS WERE ORDERED AND ANTICIPATED DELIVERY DATES WILL BE REQUIRED TO BE SUBMITTED TO THE ARCHITECT AT THIS TIME. FAILING TO COMPLY WITH THIS PARAGRAPH WILL PROHIBIT THE CONTRACTOR FROM SUBSTITUTING A SPECIFIED PRODUCT BASED ON DELIVERY TIME ISSUES. CONTINUITY OF SERVICES, AND PHASING A. IF IT BECOMES NECESSARY TO TEMPORARILY INTERRUPT SERVICE TO ANY PORTION OF THE BUILDING, THE OWNER SHALL BE NOTIFIED NO LESS THAN TEN (10) WORKING DAYS IN ADVANCE TO ENABLE NECESSARY ARRANGEMENTS TO BE MADE. B. WORK SHALL BE SCHEDULED SO AS TO MINIMIZE SYSTEM DOWNTIMES. CUTTING AND PATCHING A. INCLUDE CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF CONDUIT, WIRING AND EQUIPMENT. ANY DAMAGE INCIDENT TO CUTTING OR OTHER CAUSES IN THE PERFORMANCE OF THE CONTRACT WORK SHALL BE MADE GOOD BY REPLACEMENT OR REPAIRS IN A MANNER SATISFACTORY TO THE ENGINEER. FIRESTOPPING AND SMOKESTOPPING A. WHERE PIPING, DUCTS, CONDUITS, CABLES, OR OTHER WORK PASSES THROUGH FIRE OR SMOKE RATED CONSTRUCTION, FURNISH AND INSTALL SLEEVES AND/OR THOROUGHLY SEAL OPENINGS AROUND SLEEVES, PIPES, DUCTS, ETC. WITH FIRE AND SMOKE RESISTANT MATERIALS. MATERIALS SHALL BE PROVIDED TO MAINTAIN THE FIRE RATING OF THE ADJACENT CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA AND OTHER APPLICABLE CODES. THE CONTRACTOR SHALL STUDY THE ARCHITECTURAL DRAWINGS AND CONSULT THE BUILDING LANDLORD OR OWNER TO DETERMINE WHERE FIRE STOPPING IS REQUIRED. B. ONLY UL APPROVED FIRE STOPPING SYSTEMS (MATERIALS AND ASSEMBLIES) SHALL BE USED. INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH THE MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS. THE CONTRACTOR SHALL SUBMIT A COLLECTION OF MANUFACTURER GENERATED INSTALLATION DETAILS. THESE DETAILS SHALL COVER ALL FIRE STOPPING INSTALLATIONS INTENDED TO BE USED ON THE PROJECT. C. FIRE STOPPING MATERIALS: PRODUCTS MADE BY THE FOLLOWING MANUFACTURERS, PROVIDED THEY COMPLY WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS, ARE THOSE CONSIDERED ACCEPTABLE: DOW CORNING CORPORATION, GE SILICONES, HILTI, INC., AND 3M FIRE PROTECTION PRODUCTS. PROVIDE PENETRATION SEAL ASSEMBLIES WHOSE FIRE_RESISTANCE RATINGS HAVE BEEN DETERMINED BY TESTING IN THE CONFIGURATIONS REQUIRED AND WHICH HAVE FIRE_RESISTANCE RATINGS AT LEAST AS HIGH AS THAT OF THE FIRE_RATED ASSEMBLY IN WHICH THEY ARE TO BE INSTALLED. D. EXAMINATION: INSPECT ALL FIRE AND SMOKE BARRIERS FOR PENETRATIONS OF ANY TYPE; MARK OR OTHERWISE IDENTIFY ALL PENETRATIONS INDICATING ACTION REQUIRED: REPAIR, FIRE STOPPING, OR SMOKE STOPPING. CONDUCT INSPECTION PRIOR TO COVERING UP OR ENCLOSING WALLS OR CEILINGS. PROTECTION OF SERVICES A. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, REPAIR, REPLACE AND MAINTAIN IN SERVICE, ANY UTILITIES, FACILITIES OR SERVICES (UNDERGROUND, ABOVE GROUND, INTERIOR OR EXTERIOR) DAMAGED, BROKEN OR OTHERWISE RENDERED INOPERATIVE DURING THE COURSE OF CONSTRUCTION. THE METHOD USED BY THE CONTRACTOR IN REPAIRING, REPLACING OR MAINTAINING THE SERVICES SHALL BE APPROVED BY THE ARCHITECT, ENGINEER AND THE OWNER. RACEWAY AND CONDUIT A. PROVIDE RACEWAY AND/OR CONDUIT AS REQUIRED TO COMPLETE WORK INDICATED ON THE CONTRACT DOCUMENTS. B. WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE CONCEALED IN FINISHED AREAS AND MAY BE EXPOSED IN UNFINISHED AREAS. CONDUIT RUNS SHALL BE CONTINUOUS FROM OUTLET TO OUTLET, FITTING, PULL OR JUNCTION BOX, TO CABINET OR PANEL; AND SHALL BE MECHANICALLY AND ELECTRICALLY SECURED TO ASSURE GROUND CONTINUITY. C. WHEREVER THE TERMS "CONDUIT" OR "RACEWAY" APPEAR HEREINAFTER IT SHALL BE UNDERSTOOD TO MEAN ANY ONE, OR COMBINATION OF, THE FOLLOWING TYPE: ELECTRICAL METALLIC TUBING, OR FLEXIBLE METALLIC CONDUIT. D. ELECTRICAL METALLIC TUBING SHALL BE UTILIZED FOR ALL INTERIOR APPLICATIONS. E. UTILIZE FLEXIBLE METAL CONDUIT FOR FINAL CONNECTION TO ALL INTERIOR VIBRATING EQUIPMENT. F. INSTALLATION OF ALL CONDUIT SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE. G. CONDUIT SHALL HAVE COMPRESSION FITTINGS. SET-SCREWS ARE PROHIBITED. WIRES AND CABLES A. CONDUCTORS SHALL BE SOFT DRAWN COPPER HAVING CONDUCTIVITY NOT LESS THAN 98 PERCENT. B. NO ALUMINUM CONDUCTORS OR LUGS OR SPLICING DEVICES SHALL BE PERMITTED. C. ALL WIRING AND CABLES SHALL BE INSTALLED IN RACEWAY. D. INSULATION AND CONDUCTOR TYPES SHALL BE AS FOLLOWS: 1. CONDUCTORS SHALL HAVE A 600 VOLT INSULATION 90C HEAT RESISTANT TYPE THHN/THWN. 2. WIRES SMALLER THAN #12 AWG SHALL NOT BE USED FOR LIGHTING OR POWER CIRCUITS. NO STRANDED WIRE IS PERMITTED ON 10 OR 12 GAUGE. ALL WIRES AND CABLES SHALL BE IN CONDUIT. ALL WIRE SHALL BE THHN OR THWN. E. WIRE SIZES SHALL BE 2#12, 1#12 GND IN 3/4"C UNLESS OTHERWISE NOTED ON THE DRAWINGS. F. PROVIDE CIRCUIT WIRING COMPLETE AS SHOWN ON THE DRAWINGS, AND AS HEREINAFTER SPECIFIED OR REQUIRED. THE MINIMUM SIZE OF WIRE FOR BRANCH CIRCUITS SHALL BE NO. 12, EXCEPT 120 VOLT CIRCUITS OVER 100 FEET IN LENGTH SHALL BE NO. 10; 120 VOLT CIRCUITS OVER 150 FEET IN LENGTH SHALL BE NO. 8. WIRING SHALL BE INCREASED IN SIZE IF SO DEMANDED BY WATTAGE OF LOAD. LIGHTING CONTROLS A. REFER TO FLOOR PLANS FOR LIGHTING CONTROL DEVICE LOCATIONS, MANUFACTURER, TYPE AND LIGHTING CONTROL REQUIREMENTS. B. LIGHTING CONTROL WIRING DEVICES COLOR AND COVER PLATE FINISH SHALL MATCH EXISTING. VERIFY DEVICE COLOR AND COVERPLATE FINISH IN FIELD. C. PROVIDE PERMANENT LABELS ON ALL LIGHTING CONTROLS COVER PLATES INDICATING PANEL AND CIRCUIT NUMBER. RECEPTACLES A. RECEPTACLES FOR CONVENIENCE OUTLETS SHALL BE DUPLEX SELF-ALIGNING GROUNDING TYPE RATED FOR 20 AMPERES AT 125 VOLTS. CONTACTS SHALL BE MADE OF HEAVY SPRING COPPER OR BRONZE SO DESIGNED AS TO SECURELY GRIP BOTH SIDES OF EACH RECEPTACLE BLADE AND SHALL BE ENCLOSED IN HIGH HEAT, NON-INFLAMMABLE, NON-HYGROSCOPIC MOLDED COMPOUND CASE, PROVIDED WITH WIDE PLASTER EARS. EACH TERMINAL SHALL BE PROVIDED WITH TWO (2) BINDING SCREWS LOCATED ON THE SIDE OF THE RECEPTACLE. B. DUPLEX RECEPTACLE, 20 AMPERE, 125 VOLTS, 2 POLE, 3 WIRE GROUNDING TYPE, NEMA 5-20R; HUBBELL CATALOG NO. 5362-I, OR EQUAL BY PASS & SEYMOUR, LEVITON CATALOG, OR COOPER. C. ALL RECEPACLES SHALL BE INSTALLED WITH THE GROUND TERMINAL UP OR TO THE LEFT. D. RECEPTACLES COLOR AND COVERPLATE FINISH SHALL MATCH EXISTING. VERIFY DEVICE COLOR AND COVERPLATE FINISH IN FIELD. E. PROVIDE PERMANENT LABELS ON ALL RECEPTACLE COVER PLATES INDICATING PANEL AND CIRCUIT NUMBER FEEDING THE RECEPTACLE. GROUNDING A. PROVIDE ALL SYSTEM EQUIPMENT GROUNDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND IN FULL COMPLIANCE WITH ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE. B. GROUND EVERY DEVICE AND METAL PART OF THE ELECTRICAL SYSTEM. C. MAINTAIN CONTINUITY OF SYSTEM AND EQUIPMENT GROUNDS THROUGHOUT THE ELECTRICAL INSTALLATION UNLESS SPECIFICALLY SHOWN OTHERWISE. PROVIDE GROUND BUSHINGS AND JUMPERS WHERE NORMAL METALLIC GROUND PATHS ARE INTERRUPTED. D. ALL ELECTRICAL AND COMMUNICATIONS EQUIPMENT, CABINETS, BOXES, CONDUIT AND METAL RACEWAYS SHALL BE GROUNDED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND AS SPECIFIED HEREIN. E. ALL CONNECTIONS TO APPARATUS AND CONDUITS SHALL BE MADE WITH AN APPROVED TYPE OF SOLDER LESS CONNECTOR. CONNECTORS SHALL BE SECURELY BOLTED OR CLAMPED TO THE EQUIPMENT. ALL CONTACT SURFACES SHALL BE THOROUGHLY CLEANED AND BRIGHT BEFORE CONNECTIONS ARE MADE IN ORDER TO INSURE A GOOD METAL-TO-METAL CONTACT. F. TIE ALL GROUNDING SYSTEMS TOGETHER AT THEIR ORIGINS AS SHOWN ON THE DRAWINGS AND AS CALLED FOR BY THE NATIONAL ELECTRICAL CODE. G. PROVIDE AN INSULATED GROUND WIRE SIZED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE IN EVERY CONDUIT CARRYING LINE VOLTAGE CONDUCTORS. H. RUN A GREEN EQUIPMENT GROUND CONDUCTOR, MINIMUM #12 FOR ALL ELECTRICAL CIRCUITS. VERIFY ELECTRICAL PANELBOARDS FOR GROUND BUS BAR. IF GROUND BUS BAR ARE NOT PRESENT, BOND CONDUITS USING COMPRESSION FITTINGS AND TEST FOR GROUND CONTINUITY BACK TO SERVICE ENTRANCE SWITCHBOARD. PANELBOARDS A. REFER TO THE RISER DIAGRAM FOR APPROVED MANUFACTURER AND TYPE. B. PROVIDE A TYPE WRITTEN INDEXES IN EACH PANELBOARD WHERE CIRCUITS ARE ADDED OR REVISED TO REFLECT BREAKER CIRCUITING. EMERGENCY VOICE COMMUNICATION / FIRE ALARM A. NEW DEVICES SHALL BE COMPATIBLE WITH EXISTING MANUFACTURER (SIMPLEX-GRINNELL 4100U) LOCATED IN BASEMENT MDF ROOM. PROVIDE WIRING, GROUNDING, MATERIALS, AND QUANTITY IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. PROVIDE NECESSARY SYSTEM SIGNAL EXTENDERS IF REQUIRED FOR NEW EMERGENCY VOICE COMMUNICATION / FIRE ALARM SIGNAL REQUIREMENTS. B. BUILDING EMERGENCY VOICE COMMUNICATION / FIRE ALARM SYSTEM SHALL REMAIN OPERATIONAL DURING CONSTRUCTION. COORDINATE ANY SYSTEM OUTAGES WITH THE LOCAL FIRE DEPARTMENT. C. CENTER CEILING MOUNTED EMERGENCY VOICE COMMUNICATION / FIRE ALARM DEVICES ON CEILING TILES. D. EXAMINATION: INSPECT EXISTING EMERGENCY VOICE COMMUNICATION / FIRE ALARM SYSTEM WIRING AND GROUNDING PRIOR TO BEGIN WITH THE EXTENSION OF THE EMERGENCY VOICE COMMUNICATION / FIRE ALARM SYSTEM. NO CLAIM OR ADDITIONAL COMPENSATION WILL BE ENTERTAINED ON BEHALF OF OR PAID TO THIS CONTRACTOR ON ACCOUNT OF HIS FAILURE BASED ON GENERAL PROJECT REQUIREMENTS OF THESE SPECIFICATIONS. E. PROVIDE ALL PROGRAMMING AND TESTING REQUIRED FOR AN EMERGENCY VOICE COMMUNICATION / FIRE ALARM SYSTEM EXTENSION OPERATION. F. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. WORK NOT INCLUDED A. INFORMATION TECHNOLOGY (TELEPHONE, DATA, SOUND SYSTEM, SECURITY, VIDEO, CCTV, LOW VOLTAGE WIRING) SYSTEM DESIGN, INTERFACE AND SHOP DRAWINGS. COORDINATE WITH INFORMATION TECHNOLOGY VENDOR FOR REQUIRED 120V ELECTRICAL POINT OF CONNECTIONS, GROUNDING AND CONDUIT ROUGH-IN INSTALLATION TO INFORMATION TECHNOLOGY EQUIPMENT ROOM. B. TEMPERATURE CONTROL WIRING. C. ARC FLASH ANALYSIS AND SHORT CIRCUIT COORDINATION STUDY. EMERGENCY VOICE COMMUNICATIONS / FIRE ALARM A. PROVIDE EXTENSION OF EXISTING EMERGENCY VOICE COMMUNICATIONS / FIRE ALARM SYSTEM (SIEMENS CERBERUS TM PRO). B. CONTRACTOR SHALL INCLUDE EXTENSION OF EXISTING EMERGENCY VOICE COMMUNICATIONS / FIRE ALARM SYSTEM IN HIS/HER BID. C. DEVICES SHALL HAVE A RED COVERPLATE AND WHITE LETTERS. D. FIRE ALARM WIRING SHALL BE IN RACEWAY. E. PROVIDE EXISTING EMERGENCY VOICE COMMUNICATIONS / FIRE ALARM SYSTEM EXTENSION SHOP DRAWING TO ENGINEER FOR REVIEW. 09/29/21