HomeMy WebLinkAboutSanitary Sewer Design Summary I a`,� 1 U1
•
330 IAC 3-2 CONSTRUCTION PERMIT
SANITARY SEWER DESIGN SUMMARY
CITY OF CARMEL , INDIANA
A . DATA TO BE SUBMITTED BY OWNER/ENGINEER TO THE ENGINEERING
DEPARTMENT , CITY OF CARMEL , INDIANA .
1 . PROJECT TITLE : AVIAN GLEN SECTION ONE
Location : approximately 14000 Hazeldell Road
2 . PROJECT OWNER : Davis Development Corp.
Address : 8250 Haverstick Road, Suite 290 / Indpls. , IN 46240
Telephone : 259-6214
3 . PROJECT ENGINEER : Chris R. White / Paul I . Cripe, Inc.
Address : 7172 Graham Road / Indianapolis, IN 46250
Telephone : 842-6777
4 . Certification that project is completed in accordance
with approved plans and specifications by the Indiana
Stream Pollution Control Board will be provided by :
Name : Chris R. White / Paul I . Cripe, Inc.
Address : 7172 Graham Road / Indianapolis, IN 46250
5 . A project review fee made out to Environmental Management
Special Fund , required by the Indiana Stream Pollution
Control Board , is hereby submitted in the amount of $4-0--90
50.00
Yes x No ( DO NOT SEND CASH )
6 . Design Flows : ( Use Bulletin S . E . 13 )
a . Average Flows :
Apts gpd/unit = gpd
28 Private Dwellings @ 310 gpd/unit = 8680 gpd
Commercial Lots gpd/unit = gpd
gpd/unit gpd
Total Average Daily Flow = ' 8680 gpd
b . Average Design Peak Flow = 34720 gpd
7 . Sewer Details :
a . Diameter and length of gravity sewer and force main
( indicate length for each size ) .
Gravity Sewers Force Mains
Size Length Sewer Material Size Length Sewer Mater•:
8" 1533 PVC 4"
10" 6"
Total 1533 Total
b . Number of manholes : 8 Type of construction : normal gravity
c . Stream, Highway , and Railroad Crossing: none
d . Watermain protection : per 10 States Standards
e . Location & size existing sewer where new sewer connects
10" sewer at Hazeldell Road
8. Lift Station Details : N/A
a . Location :
b . Type : Wet/Dry Well , Wet Well , Pneumatic Ejector
c . Number of pumps : ( by sizes )
d . Capacity of pumps : constant or variable
e . RPM: GPM HP TDH
f. Volume of wet well :
g. Wet well detention time :
h . Discharge gate valve and check valve in a valve pit :
Yes No .
i . Cate valve on suction line : Yes No .
j . Alarm :
k. Standby power source : •
1 . Bypass or overflow :
9. . Waste treatment will be provided by : City of Carmel
a . Connection will be made to Carmel sewer system.
1 "L .3 G]
10 . Inspection during construction will be provided by :
City of Carmel
11 . Maintenance after completion and prior to release of
maintenance bond will be provided by : City of Carmel
12 . Estimated Construction Cost : $58,000.00
To the best of my knowledge and belief the above project data
is complete and accurate .
Signed : 7
igned : 7
Date : 1- `7/
B . SUPPLEMENTAL PROJECT DATA AND RECOMMENDATION BY THE CITY
OF CARMEL , INDIANA .
1 . RELATED PROJECT COLLECTION SYSTEM :
a . Are the receiving sewers of sufficient capacity to
handle the flow from the project : X Yes No .
b . Are there any lift stations affected by the project?
Yes X No.
If yes , complete the following:
Lift Station #
Capacity
Current Load
Overflow Date
c . Are there any overflow , bypass or other problem areas
affected by the project? Yes X No .
If yes , complete the following :
Location :
Frequency of discharge :
Duration of discharge:
•
2 . RELATED WASTEWATER TREATMENT FACILITY :
a . Is there sufficient capacity in the City ' s Waste-
water Treatment Facility to treat the design flow
from the project? X Yes No .
b . Will the City iaXXXor exceed its NPDES limits with
the additional design flow from the project?
Yes X No.
c . The wastewater treatment plant capacity will be as
follows :
Current Capacity Current Load Estimated Load
8.880 MGD 4.258 MGD 4.267 MGD
d . Recommendation of the City of Carmel for a construction
permit by the Indiana Stream Pollution Control Board :
Yes
No
X Yes , subject to the attached conditions
a . Limit of number of connections '49
b . Schedule- time of connections
c . Limit on starting time of construction
d . Industrial pretreatment as required
e . Providing for monitoring as required
To the best of my knowledge and belief, the above project data
is complete and accurate and is hereby submitted to the Indiana
Stream Pollution Control Board this /Z day of ,l,gvG'.. ,
cc : Board of Public Works
Owner/Engineer
Thomas E . Welch
City Engineer
City of Carmel, Indiana