Loading...
HomeMy WebLinkAboutSanitary Sewer Design Summary I a`,� 1 U1 • 330 IAC 3-2 CONSTRUCTION PERMIT SANITARY SEWER DESIGN SUMMARY CITY OF CARMEL , INDIANA A . DATA TO BE SUBMITTED BY OWNER/ENGINEER TO THE ENGINEERING DEPARTMENT , CITY OF CARMEL , INDIANA . 1 . PROJECT TITLE : AVIAN GLEN SECTION ONE Location : approximately 14000 Hazeldell Road 2 . PROJECT OWNER : Davis Development Corp. Address : 8250 Haverstick Road, Suite 290 / Indpls. , IN 46240 Telephone : 259-6214 3 . PROJECT ENGINEER : Chris R. White / Paul I . Cripe, Inc. Address : 7172 Graham Road / Indianapolis, IN 46250 Telephone : 842-6777 4 . Certification that project is completed in accordance with approved plans and specifications by the Indiana Stream Pollution Control Board will be provided by : Name : Chris R. White / Paul I . Cripe, Inc. Address : 7172 Graham Road / Indianapolis, IN 46250 5 . A project review fee made out to Environmental Management Special Fund , required by the Indiana Stream Pollution Control Board , is hereby submitted in the amount of $4-0--90 50.00 Yes x No ( DO NOT SEND CASH ) 6 . Design Flows : ( Use Bulletin S . E . 13 ) a . Average Flows : Apts gpd/unit = gpd 28 Private Dwellings @ 310 gpd/unit = 8680 gpd Commercial Lots gpd/unit = gpd gpd/unit gpd Total Average Daily Flow = ' 8680 gpd b . Average Design Peak Flow = 34720 gpd 7 . Sewer Details : a . Diameter and length of gravity sewer and force main ( indicate length for each size ) . Gravity Sewers Force Mains Size Length Sewer Material Size Length Sewer Mater•: 8" 1533 PVC 4" 10" 6" Total 1533 Total b . Number of manholes : 8 Type of construction : normal gravity c . Stream, Highway , and Railroad Crossing: none d . Watermain protection : per 10 States Standards e . Location & size existing sewer where new sewer connects 10" sewer at Hazeldell Road 8. Lift Station Details : N/A a . Location : b . Type : Wet/Dry Well , Wet Well , Pneumatic Ejector c . Number of pumps : ( by sizes ) d . Capacity of pumps : constant or variable e . RPM: GPM HP TDH f. Volume of wet well : g. Wet well detention time : h . Discharge gate valve and check valve in a valve pit : Yes No . i . Cate valve on suction line : Yes No . j . Alarm : k. Standby power source : • 1 . Bypass or overflow : 9. . Waste treatment will be provided by : City of Carmel a . Connection will be made to Carmel sewer system. 1 "L .3 G] 10 . Inspection during construction will be provided by : City of Carmel 11 . Maintenance after completion and prior to release of maintenance bond will be provided by : City of Carmel 12 . Estimated Construction Cost : $58,000.00 To the best of my knowledge and belief the above project data is complete and accurate . Signed : 7 igned : 7 Date : 1- `7/ B . SUPPLEMENTAL PROJECT DATA AND RECOMMENDATION BY THE CITY OF CARMEL , INDIANA . 1 . RELATED PROJECT COLLECTION SYSTEM : a . Are the receiving sewers of sufficient capacity to handle the flow from the project : X Yes No . b . Are there any lift stations affected by the project? Yes X No. If yes , complete the following: Lift Station # Capacity Current Load Overflow Date c . Are there any overflow , bypass or other problem areas affected by the project? Yes X No . If yes , complete the following : Location : Frequency of discharge : Duration of discharge: • 2 . RELATED WASTEWATER TREATMENT FACILITY : a . Is there sufficient capacity in the City ' s Waste- water Treatment Facility to treat the design flow from the project? X Yes No . b . Will the City iaXXXor exceed its NPDES limits with the additional design flow from the project? Yes X No. c . The wastewater treatment plant capacity will be as follows : Current Capacity Current Load Estimated Load 8.880 MGD 4.258 MGD 4.267 MGD d . Recommendation of the City of Carmel for a construction permit by the Indiana Stream Pollution Control Board : Yes No X Yes , subject to the attached conditions a . Limit of number of connections '49 b . Schedule- time of connections c . Limit on starting time of construction d . Industrial pretreatment as required e . Providing for monitoring as required To the best of my knowledge and belief, the above project data is complete and accurate and is hereby submitted to the Indiana Stream Pollution Control Board this /Z day of ,l,gvG'.. , cc : Board of Public Works Owner/Engineer Thomas E . Welch City Engineer City of Carmel, Indiana