GENERAL NOTES:
GRAPHIC SYMBOLS
WORK POINT, CONTROL POINT,
OR DATUM POINT
GRID LINES
SECTION
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
ROOM NAME
ROOM NUMBER
PLAN NOTE
INDIANA NORTH ARROW
DESCRIPTIONSYMBOL
CENTER LINE
DIM
COLUMN CENTERLINES DOOR JAMB (HINGE SIDE,
TYPICAL, UNLESS NOTED OTHERWISE)
6"
GWB TO CONTINUE UNINTERRUPTED
ACROSS VARIOUS SUBSTRATES AND
PARTITION TYPES, UNLESS NOTED OTHERWISE
SHEET WHERE DRAWN
INTERIOR ELEVATION
A
1
ABBREVIATIONS
ROOM
207
#
DOOR
SEE DOOR SCHEDULE
A/C AIR CONDITIONING
AC ACOUSTICAL
ADA AMERICANS WITH DISABILITIES
ACT
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ALUM ALUMINUM
ARCH ARCHITECTURAL
AVG AVERAGE
BLDG BUILDING
BM BEAM / BENCHMARK
B.O. BOTTOM OF
BSMT BASEMENT
BUR BUILT UP ROOF
BW BOTTOM OF WALL
CAB CABINET
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLOS CLOSET
CLR CLEAR
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONF CONFERENCE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CWT CERAMIC WALL TILE
DBL DOUBLE
DEMO DEMOLITION
DET / DTL DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM(S) DIMENSION(S)
DIV DIVISION / DIVIDED
DN DOWN
DPM DAMP PROOF MEMBRANE
DS DOWNSPOUT
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATOR / ELEVATION
EO EDGE OF
EPDM ETHYLENE PROPYLENE DIENE
TERPOLYMER MEMBRANE
EPS EXTRUDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
EX / EXIST EXISTING
EXP EXPANSION / EXPOSED
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FLR FLOOR
FOF FACE OF FINISH
FOS FACE OF STUD
FP FIRE PROTECTION / FIREPROOFING
FT FOOT / FEET
FTG FOOTING
FTR FIRE TREATED
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GCMU GLAZED CONCRETE MASONRY
UNIT
GFRG GLASS FIBER REINFORCED
GYPSUM
GL GLASS / GLAZING
GWB GYPSUM WALL BOARD
HC HOLLOW CORE
HDWE HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HVAC HEATING / VENTILATING / AIR
CONDITIONING
HWH HOT WATER HEATER
ID INSIDE DIAMETER
IG INSULATED GLASS
INCL INCLUDE(D,ING)
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
KIT KITCHEN
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
LIN LINOLEUM
LOC LIMIT OF CONTRACT
LP LOW POINT
LTG LIGHTING
MAX MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MFG MANUFACTURING
MFR MANUFACTURER
MGR MANAGER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOT RATED
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O/ OVER
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OSB ORIENTED STRAND BOARD
PC PIECE / PERSONAL COMPUTER
PERF PERFORATED
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
PRES PRESIDENT
PRTD / PTRD PRESSURE TREATED
PT PAINT
PTD PAINTED
QTY QUANTITY
QTILE QUARRY TILE
R RADIUS / RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REFRIG REFRIGERATOR
REINF REINFORCE(D, ING)
REQD REQUIRED
REV REVISION
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RR RESTROOM
RWC RAIN WATER CONDUCTOR
S SOUTH
SCHED SCHEDULE
SDT STATIC DISSIPATIVE TILE
SECT SECTION
SECY SECRETARY
SHT SHEET
SIC SOUND ISOLATION CEILING
SIM SIMILAR
SPEC SPECIFIED / SPECIFICATION
SQ SQUARE
SQ FT SQUARE FEET
SSM SOLID SURFACE MATERIAL
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STN STONE
STOR STORAGE
STR STAIR
STRUCT STRUCTURAL
SY SQUARE YARD
T TREAD
T&G TONGUE AND GROOVE
T/O THROUGHOUT
TELE TELEPHONE
TEMP TEMPORARY
TERR TERRAZZO
THRES THRESHOLD
T.O. TOP OF
TRANSP TRANSPARENT
TRCT TERRACOTTA TILE
TW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VICE PRESIDENT
VWC VINYL WALLCOVERING
W WEST
W/ WITH
WC WATERCLOSET
WD WOOD
WDW WINDOW
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FABRIC
MISCELLANEOUS ITEMS
WT#
#
SHT-NO
GLASS/WINDOW TYPE
WALLTYPE
SEE WALLTYPES
REVISION#
FLRRFLRL FLOOR FINISH
DESIGNATION
SUBSTRATE/FINISH
CEILING HEIGHT A.F.F.
N
S
W E
NORTH
LOCATION PLAN NORTH ARROW
101
A. UNLESS OTHERWISE INDICATED, GENERAL NOTES APPLY TO ALL WORK AND ALL DRAWINGS
IN THIS SET AND SHALL EXTEND TO ANY CHANGES, EXTRAS OR ADDITIONS AS AGREED TO
DURING THE COURSE OF THE WORK.
B. THESE DRAWINGS AND COPIES THEREOF ARE LEGAL INSTRUMENTS OF SERVICE FOR USE OF
THE OWNER ONLY.
C. THIS PROJECT IS DESIGNED AND DOCUMENTED PER THE DESIGNER'S INTERPRETATION OF
THE CODE REQUIREMENTS. VARIOUS GOVERNING AGENCIES SOMETIMES INTERPRET
CODES, LAWS AND ORDINANCES DIFFERENTLY. THESE AGENCIES HAVE JURISDICTION TO
REQUIRE CHANGES IN DESIGN AND CONSTRUCTION. ANY CHANGES OR MODIFICATIONS
TO THE DESIGN MAY NECESSITATE PRICE ADJUSTMENTS.
D. ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,
ORDINANCES, RULES, REGULATIONS, AND STANDARDS, INCLUDING, BUT NOT LIMITED TO:
THE INDIANA BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE
AMERICANS WITH DISABILITIES ACT (ADA), UNIVERSAL BUILDING CODE, AND APPLICABLE
TRADE STANDARDS. ALL APPLICABLE RULES AND REGULATIONS ARE TO BE THE MOST
CURRENT ADOPTED EDITIONS.
E. THE ERRORS AND OMISSIONS DESIGN LIABILITY FOR THE PROJECT SHALL BE LIMITED TO THE
DESIGN COST OF CORRECTING THE DEFICIENCY.
F. CONTRACTOR SHALL VISIT AND INSPECT THE PROJECT SITE PRIOR TO SUBMITTAL OF BID
AND FAMILIARIZE THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK WILL BE
PERFORMED. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS
AND DIMENSIONS PRIOR TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE
DESIGNER IMMEDIATELY. FAILURE OF CONTRACTOR TO PERFORM IN THIS MANNER DOES
NOT ALLOW FOR ADDITIONAL COST TO THE OWNER. NO SUBSEQUENT EXTRAS OR
ADDITIONS WILL BE ALLOWED ON ANY CLAIM OF LACK OF KNOWLEDGE OF CONDITIONS
OR CIRCUMSTANCES ABOUT WHICH THE CONTRACTOR COULD HAVE INFORMED
THEMSELVES.
G. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITS
REQUIRED FOR COMPLETION OF THIS PROJECT.
H. ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE
FIT, FINISH, SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING
SERVICE REQUIREMENTS OF THE OWNER'S F.F.E.
I. CONTRACTOR SHALL MAKE KNOWN ANY LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS TO
THE PROJECT DURING THE PRICING PHASE OF THE PROJECT. UNLESS NOTED ALL WORK
SHOWN ON THE DRAWINGS WILL BE PRESUMED TO BE INCLUDED.
J. ALL CONTRACTORS INVOLVED IN THIS WORK SHALL CARRY PROPERTY DAMAGE AND PUBLIC
LIABILITY INSURANCE AS REQUIRED BY OWNER & GOVERNMENTAL AGENCIES HAVING
JURISDICTION AND COMPLY WITH STATUTORY REQUIREMENTS FOR DISABILITY AND
WORKMEN'S COMPENSATION. THEY WILL COMPLY WITH ALL RULES AND REGULATIONS
DICTATED BY THE OWNER AND THE CONDITIONS OF THE JOB. INSURANCE SHALL PROTECT
THE OWNER, THE TENANT, ARCHITECT AND OTHER GROUP(S) TO BE NAMED FROM LIABILITY
TO THE CONTRACTOR'S NEGLIGENCE.
K. THE AIA STANDARD DOCUMENT A201 SHALL BE MADE PART OF THE GENERAL CONDITIONS.
L. ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. DIMENSIONS SHALL GOVERN. DETAILS
SHALL GOVERN OVER PLANS AND ELEVATIONS; LARGE SCALE DETAILS GOVERN OVER
SMALL SCALE DETAILS. ANY DIMENSIONS NOT SHOWN OR DEEMED QUESTIONABLE ARE TO
BE VERIFIED WITH THE DESIGNER. DO NOT SCALE DIMENSIONS ON THE DRAWINGS. ALL
DIMENSIONS ARE TO THE FACE OF GYPSUM BOARD, MASONRY/CONCRETE WALLS, OR
CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE.
M. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED.
N. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS
TO ALL TRADES UNDER THEIR EMPLOY.
O. THE GENERAL CONTRACTOR SHALL SUPPLY, PRIOR TO THE COMMENCEMENT OF WORK, A
LIST OF ALL SUBCONTRACTORS TO ARCHITECT. THE NAME OF THE PRINCIPAL CONTACT, THE
ADDRESS AND PHONE NUMBER OF EACH SUBCONTRACTOR SHALL BE INCLUDED ON THE
LIST.
P. THE GENERAL CONTRACTOR SHALL FURNISH SAMPLES TO ARCHITECT/INTERIOR DESIGNER
OF ALL MATERIALS, TOGETHER WITH FINISHES, INTENDED FOR USE IN THE WORK BEFORE THE
COMMENCEMENT/ ORDER OF THE SPECIFIED WORK.
Q. ANY INFORMATION REQUIRED BY CONTRACTORS THAT IS NOT SHOWN ON THE DRAWINGS
OR CONTAINED IN OTHER CONTRACT DOCUMENTS SHALL BE REQUESTED BY THE GENERAL
CONTRACTOR FROM ARCHITECT/INTERIOR DESIGNER.
R. A REPRESENTATIVE OF THE GENERAL CONTRACTOR AUTHORIZED TO DISCUSS THE WORK
AND RECEIVE INFORMATION FROM ARCHITECT SHALL BE AVAILABLE AT ALL TIMES THAT
WORK IS IN PROGRESS.
S. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CUT SHEETS TO ARCHITECT/INTERIOR
DESIGNER FOR APPROVAL ON ALL ITEMS INCLUDING BUT NOT LIMITED TO MILLWORK,
LIGHTING, FINISH MATERIALS, PLUMBING FIXTURES AND ACCESSORIES PRIOR TO ORDER.
SHOP DRAWINGS SHALL SHOW ALL DIMENSIONS AND CONDITIONS.
T. CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL CERTIFYING THAT THE
SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND THAT THE CONTRACTOR COORDINATION
HAS BEEN PERFORMED.
U. ALL CONTRACTORS INVOLVED IN THIS PROJECT SHALL REVIEW ALL DRAWINGS INCLUDED
IN THIS DRAWING SET AND SHALL COORDINATE THEIR WORK WITH OTHER TRADES ON THIS
PROJECT.
V. FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 6" FROM ADJACENT
PERPENDICULAR PARTITIONS, UNLESS NOTED OTHERWISE.
W. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE ALL CASEWORK AND WALL MOUNTED
EQUIPMENT.
X. ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I.
STANDARDS, PREMIUM GRADE.
Y. ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED BY THE FACILITY
WITH THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION. COORDINATE FINAL FIRE
EXTINGUISHER LOCATIONS WITH PHANOMEN/design PRIOR TO ROUGH-IN. STYLE TO BE
SEMI-RECESSED, HINGED DOOR WITH GLASS. SUBMIT CUT-SHEET TO PHANOMEN/design
FOR APPROVAL.
Z. CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT
FOR THE WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT"
(N.I.C.). EXISTING WORK ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE
PROTECTED BY ALL SUITABLE MEANS NECESSARY TO PREVENT OR MINIMIZE DAMAGE.
GREAT CARE SHALL BE EXERCISED TO ASSURE THAT THE BUILDING SHALL BE PROTECTED
FROM DAMAGE THAT COULD OCCUR BECAUSE OF THIS WORK. ANY DAMAGES CAUSED BY
THIS WORK OR ACCIDENTS SHALL BE REPAIRED, REPLACED OR PATCHED TO THE
SATISFACTION OF ARCHITECT AND THE OWNER. CONTRACTORS SHALL BEAR FINANCIAL
RESPONSIBILITY FOR SUCH DAMAGE AND ANY WORK UNDERTAKEN TO CORRECT IT.
AA. THE CONTRACTORS SHALL EXERCISE GREAT CARE IN PROTECTION FROM DAMAGE ALL
MATERIALS EXISTING ON THE JOB AND SHALL MAINTAIN PROTECTION FOR ALL TRAFFIC
AREAS OF THE BUILDING TO BE USED DURING THE EXECUTION OF WORK RELATING TO THIS
CONTRACT WITH THE UNDERSTANDING THAT THE CONTRACTOR'S WILL RECTIFY ANY
DAMAGE ATTRIBUTABLE TO THEIR OPERATION.
AB. CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND
FACILITIES FREE OF DEBRIS. MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE STORED IN A LOCATION APPROVED BY THE OWNER.
AC. ALL PLUMBING ITEMS AND/OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED
WITH INTERIOR ELEVATIONS PRIOR TO ROUGH-IN. ANY DISCREPANCIES SHALL BE
COORDINATED WITH PHANOMEN/design.
AD. GYPSUM BOARD SURFACES SHALL BE ISOLATED WITH CONTROL JOINTS AS PER
MANUFACTURERS REQUIREMENTS AND INDUSTRY STANDARDS.
AE. ALL GYPSUM BOARD SURFACES ARE TO BE FINISHED SMOOTH. GYPSUM ASSOCIATION
GA-214-96 LEVEL 4 FINISH, WITH THE FOLLOWING ADDITION; ANY READILY VISIBLE
IMPERFECTIONS IN GYPSUM BOARD SURFACE SHALL BE COATED WITH JOINT COMPOUND
AND/OR SKIM-COATED AS REQUIRED.
AF. SCRIBE GYPSUM BOARD OF WALL AND PARTITIONS TO IRREGULARITIES OF DECK ABOVE.
SEAL TIGHTLY AROUND ANY PARTITIONS.
AG.EACH TRADE SHALL BE HELD RESPONSIBLE FOR KNOWLEDGE OF THE GENERAL NOTES
INCLUDED THROUGHOUT THE CONTRACT DOCUMENTS AND THE APPLICABLE BUILDING
CODES.
AH. THE HVAC, PLUMBING AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE
ARCHITECTURAL DRAWINGS. SHOULD THERE BE ANY DISCREPANCY BETWEEN THE VARIOUS
DRAWINGS, IT SHALL BE BROUGHT TO THE DESIGNER AND ENGINEERS ATTENTION FOR
CLARIFICATION.
AI. CONTRACTOR MUST VERIFY AND COORDINATE ALL OPERATIONAL REQUIREMENTS AND
CLEARANCE DIMENSIONS OF PROJECT COMPONENTS; INCLUDING CONTRACTOR
SUPPLIED AND OWNER SUPPLIED ITEMS.
AJ. CONTRACTOR SHALL ITEMIZE ALL COSTS AND SCOPE OF WORK REGARDING ANY CHANGE
ORDER. THIS INFORMATION MUST BE PRESENTED TO THE OWNER FOR APPROVAL PRIOR TO
ANY WORK BEING EXECUTED.
AK. ALL LIGHT FIXTURES THAT COME INTO CONTACT WITH BUILDING INSULATION MUST BE IC
RATED. ALL LIGHT FIXTURES SHALL MEET ALL APPLICABLE CODES FROM NATIONAL ELECTRIC
CODE (NEC) TO THE INTERNATIONAL ENERGY CODE (IEC). CONTRACTOR IS TO VERIFY
CODE COMPLIANCE OF ALL LIGHT FIXTURES.
AL. METAL STUD CONTRACTOR IS RESPONSIBLE FOR GAUGING AND RELATED ENGINEERING OF
METAL STUD FRAMED WALLS UNLESS NOTED OTHERWISE ON ENGINEERING DRAWINGS.
AM.THESE PLANS ARE INTENDED FOR "GUIDELINE" BID AND CONSTRUCTION PURPOSES ONLY
AND DO NOT INCLUDE DETAILS AND METHODS OF CONSTRUCTION FOR ALL AREAS.
SUBSTITUTIONS OF MATERIALS AND METHODS MAY BE PROVIDED, UPON APPROVAL OF
OWNER AND DESIGNER.
AN. THE PROJECT TEAM, AS LISTED, CANNOT GUARANTEE AGAINST HUMAN ERROR,
OMISSIONS OR INACCURACIES CONTAINED WITHIN THESE DOCUMENTS. GENERAL
CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING ALL QUESTIONS AND
CONCERNS TO THE PROJECT TEAM TO SEEK CLARIFICATION AND/OR
SOLUTIONS PRIOR TO THE COMMENCEMENT OF THE SPECIFIED WORK.
AO.ALL CONTRACTORS AND SUPPLIERS SHALL BEFORE COMMENCING WORK, REVIEW ALL
PLANS AND SPECIFICATIONS AND VERIFY ALL DIMENSIONS AND DETAILS FOR THEIR WORK
AND REPORT ANY DISCREPANCIES OR VARIATIONS TO THE DESIGNER PRIOR TO FINAL BID,
ORDER/FABRICATION, CONSTRUCTION AND INSTALLATION OF ANY MATERIAL. THE
GENERAL CONTRACTOR SHALL EXAMINE ALL ADJOINING WORK OR AREAS UPON WHICH THE
PERFORMANCE OF THEIR WORK IS IN ANY WAY DEPENDENT.
AP. ALL MATERIALS SHALL BE NEW, UNUSED, AND OF THE HIGHEST QUALITY IN EVERY RESPECT
UNLESS OTHERWISE NOTED. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE
INSTALLED AS PER THE MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS UNLESS
OTHERWISE NOTED.
AQ. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE, AND IN
PROPER ALIGNMENT.
AR. SEE COVER SHEET GENERAL NOTES FOR CODE COMPLIANCE.
AS. THE GENERAL CONTRACTOR SHALL KEEP SUFFICIENT WORKMEN ON THE JOB SITE AT ALL
TIMES TO PERFORM THE WORK IN THE MOST EXPEDITIOUS MANNER CONSISTENT WITH
GOOD WORKMANSHIP, GOOD BUSINESS PRACTICE AND THE BEST INTERESTS OF THE
OWNER.
AT. EACH TRADE WILL BE EXPECTED TO PROCEED IN A FASHION THAT WILL NOT DELAY OR
DETAIN THE TRADES FOLLOWING THEM.
AU. THE CONTRACTORS SHALL NOT PROCEED WITH ANY ADDITIONAL WORK OR CHANGES FOR
WHICH THEY EXPECT ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT
WITHOUT WRITTEN AUTHORIZATION FROM OWNER. FAILURE TO OBTAIN SUCH
AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION.
AV. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS IN DESIGN,
WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR.
AW. THE CONTRACTORS SHALL AT ALL TIMES KEEP THE PREMISES FREE OF THE ACCUMULATION
OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR OPERATIONS. THE CONTRACTORS
SHALL CONFINE THEIR OPERATIONS FOR REMOVAL TO SUCH METHODS AS MAY BE
AGREEABLE WITH THE OWNER. THE PROJECT SHALL BE LEFT CLEAN AND CLEAR, TO THE
SATISFACTION OF THE OWNER, AND THE DISPOSITION OF ALL SALVAGED MATERIALS IS TO
BE CLEARED WITH THE OWNER PRIOR TO REMOVAL. THE PREMISES SHALL BE SWEPT CLEAN
DAILY OF RELATED CONSTRUCTION DEBRIS.
AX. UPON SUBSTANTIAL COMPLETION OF THE WORK, THE GENERAL CONTRACTOR SHALL NOTIFY
ARCHITECT TO SCHEDULE A "PUNCH LIST" WALK THROUGH IT IS INTENDED THAT THE
GENERAL CONTRACTOR PROVIDE A COMPLETE JOB AND ANY OMISSIONS IN THESE NOTES
OR IN THE OUTLINE OF WORK SHALL NOT BE CONSTRUED AS RELIEVING THE GENERAL
CONTRACTOR OF SUCH RESPONSIBILITIES IMPLIED BY THE SCOPE OF WORK EXCEPT FOR
ITEMS SPECIFICALLY NOTED.
AY. SHOULD ANY PORTION OF THE CONTRACT DOCUMENTS PROVE TO BE, FOR WHATEVER
REASON, UNENFORCEABLE, SUCH UNENFORCEABILITY SHALL NOT EXTEND TO THE
REMAINDER OF THE CONTRACT NOR SHALL IT VOID ANY OTHER PROVISIONS OF THE
CONTRACT.
AZ. THE GENERAL CONTRACTOR SHALL HAVE A COPY OF THE LATEST SET OF CONTRACT
DOCUMENTS ON THE JOB SITE AT ALL TIMES FOR REVIEW BY ARCHITECT. ALL DRAWINGS
AND CONSTRUCTION NOTES ARE COMPLIMENTARY AND WHAT IS CALLED FOR BY ONE
SHALL BE BINDING AS IF CALLED FOR BY ALL.
BA. COMPLETE RECORD DOCUMENTS TO BE MAINTAINED SEPARATELY FROM THE FIELD SET. THE
RECORD SET SHALL HAVE ALL FIELD CHANGES DOCUMENTED AND WILL BE PROVIDED TO
ARCHITECT AT THE COMPLETION OF PROJECT. PROVIDE A COPY OF THE RECORD
DOCUMENTS TO THE LANDLORD.
BB. THE WORK INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT AND
SERVICES NECESSARY FOR, AND REASONABLY INCIDENTAL TO, THE COMPLETION IN PLACE
OF ALL WORK ILLUSTRATED AND DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS.
ALL SUCH WORK IS TO BE DONE BY THE CONTRACTORS UNLESS OTHERWISE NOTED.
BC. THE GENERAL CONTRACTOR SHALL SUBMIT CONFIRMATIONS WITH DELIVERY DATES OF
ORDERS FOR MATERIALS AND EQUIPMENT ON ANY LONG LEAD-TIME ITEMS AT THE
COMMENCEMENT OF PROJECT.
BD. CONTRACTOR TO INCLUDE PRICING FOR HOOD DUCT DRAWING THROUGH THE CHOSEN
HOOD CONTRACTOR, UNLESS OTHERWISE DISCUSSED.
BE. SIGNAGE REQUIRES SEPARATE REVIEW, PERMITS, AND FEES. CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING SUCH PERMITS, UNLESS OTHERWISE DISCUSSED. OWNER
SHALL SUBMIT BUILDING SIGNAGAE TO CITY FOR APPROVAL PRIOR TO INSTALLATION.
BF. FIRE SPRINKLER AND FIRE ALARM SYSTEMS SHALL BE PROVIDED PER NFPA NO.13.
APPROVALS TO BE OBTAINED FROM LOCAL FIRE MARSHAL. CONTRACTOR TO SUBMIT ALL
REQUIRED DRAWINGS AND INFORMATION TO FIRE MARSHAL AND AUTHORITY FOR
APPROVAL PRIOR TO COMMENCEMENT OF ANY RELATED WORK. OBTAIN APPROVAL OF
COMPLETED SYSTEMS PRIOR TO FINAL ACCEPTANCE.
Certified By:Scale:Date:Checked By:Drawn By:Revisions:
Job Number:
Drawing Number:
Drawing Name:www.phanomen.com 934 Fort Wayne Ave. - Indianapolis, IN 46202317.439.4355 (t)...creating profitable environments...LOE/BARREVIEW SET 08.26.2021 AMMLUXE LAB1200 S. RANGELINE RD., SUITE 102 CARMEL, IN 4603208/26/202110/06/21