Loading...
HomeMy WebLinkAboutA5 Architectural Details1x4 Cedar top cap 1x4 Horizontal cedar planks. 2x6 pressure treated wood base paint exposed areas black Verify with Owner 1' - 6" 2x2 and 2X4 pressure treated wood frame Opening 11" Plants by owner Planter length varies; refer to arch plan1' - 0 1/2"Waterproof membrane liner 3/4" exterior grade plywood rib supports as needed 1' - 0" 3/4" exterior grade plywood sheating Sealed flanged drain with PVC Pipe Interior finish over exisitng gyp wall. Refer to finish and elevations. Existing storefront system to remain. Protect during all phases of construction 6" metal stud faux beam 6"x20GA box beam wrapped in veneer plywood to match M-01. Wood ceiling. Refer to finish schedule T.O. Storefront/B.O. Beam 11' - 0" Millwork booth. Refer to details. Provide millwork infill panel w/ 3/4" gasketed connection at storefront mullion. Stain to match booth finish Provide blackout film at lower glazed panel where booth occurs Existing structural steel. V.I.F. Interior finish over exisitng metal stud wall. Refer to architectural plan for wall type and construction 1x8 stained solid wood trim. Refer to finish schedule B.O. Beam 1x4 stained solid wood trim. Refer to finish schedule Interior finish over exisitng gyp wall. Refer to finish plan and elevations. 1x6 stained solid wood trim. Refer to finish schedule Metal panel wainscot. Refer to finish schedule 12' - 2 1/4" Interior finish over exisitng metal stud wall. Refer to architectural plan for wall type and construction Wall mounted light fixture as specified. Refer to reflected ceiling plan and fixture schedule Painted Millwork wall by GC. Refer to elevations and finish schedule. Custom wood banquette with upholstered seat and back, by furniture vendor. Refer to furniture plan and details for more information. 1x4 stained solid wood trim. Refer to finish schedule. 2x12 dimensional lumber joists by G.C. Glass inset into millwork wall. Refer to elevations for dimensions. 2'-1" 3'-3" Operable window unit. Refer to window details. Install per manufacturer's recommendations Existing storefront to be modified as req'd for installation of operable window unit Millwork booth. Refer to details. Ceiling as indicated. Provide continuous 3/4" sealant & backer rod at storefront, typ. Existing building structure. Protect during all phases of construction Existing storefront to be modified as req'd for installation of operable window unit Provide millwork infill panel w/ 3/4" gasketed connection at storefront mullion. Stain to match booth finish 4' - 0"5/8" fiber cement panels and trim over weather barrier over 1 1/2" rigid insulation over 6" metal stud knee wall. Provide brake metal flashing at top and bottom to match storefront 1x4 stained solid wood trim. Refer to finish schedule. Ceramic wall tile over 5/8" Durock sheathing. Refer to wall tile pattern detail, elevations, and finish plan for wall finish. Existing structural steel. V.I.F. B.O. Beam Interior finish over exisitng gyp wall. Refer to finish plan and elevations. 1x6 stained solid wood trim. Refer to finish schedule Interior finish over exisitng gyp wall. Refer to finish plan and elevations. 13' - 1 1/8" 3 5/8" metal stud framing (2) layers 3/4" plywood cap solid wood trim. Refer to finish schedule Gypsum ceiling as specified. Refer to relected ceiling plan. Wall mounted light fixture as specified. Refer to reflected ceiling plan and fixture schedule Wall mounted mirror by tenant. Refer to elevations Faucet as specified Counter with integrated trough sink as specified. Provide shop drawings for review and approval FRT wood blocking/framing as required Tile base beyond ADA Pipe wrap by G.C. Ceramic Wall Tile. Refer to finish plan and elevations. Stainless steel cleanout 1' - 0" Min Durock RipperFRP/SS2"Kitchen floor as specified; refer to finish schedule. Install per manufacturers recommendation. Cove up wall as indicated 5/8" Durock to 12" A.F.F.; full height at stainless steel locations 5/8" gypsum wallboard to 6" above the ceiling; at FRP locations only Wall type as specified; refer to plan Termination cove strip at top R 3/4"4"RR base tile as specified; refer to finish schedule; shim tile to be level with floor tile RR floor as specified; refer to finish schedule; Install tile floor in compliance with TCA F122 standards. Provide Schleuter transition RR wainscott tile as specified; refer to finish schedule 5/8" moisture resistant gypsum wallboard Wall type as specified; refer to plan Continuous concrete curb. Coordinate exact location with size of dish table. Refer to plan for additional information Provide sealant at joint Curb 6"Finish floor heightCurb6"Anchor bolt. Epoxy into concrete floor Kitchen flooring as specified. Continue seamlessly around curb Leg of dish table centered on curb. Refer to FSE drawings.Coordinate with FSE dish tableWall type as specified if applicable; refer to arch plan for locations Hilti power-driven anchor or equal manufacturer; bolt to floor at 24" o.c. ICBO #2388. 0.145 dia. Shank with 1 1/8" min penetration Continuous metal track (18 GA) Floor and base as specified Continuous concrete curb Provide sealant at joints6"12" Durock ripper Same as metal stud Width Anchor bolt. Epoxy into concrete floor Wall type as specified; refer to arch plan Hilti power-driven anchor or equal manufacturer; bolt to floor at 24" O.C. ICBO #2388. 0.145 dia. Shank with 1 1/8" min penetration Continuous metal track (18 GA) Floor and base as specified Refer to structural drawings for additional requirements at load bearing wall locations.6" MIN.6"5/8" Gypsum wallboard; refer to plan and elevations for finish 3-5/8" metal stud framing at 16" O.C. Continue to underside of deck above. No deflection track at hung conditions. Ceiling as specified; refer to RCP for height and location Refer to RCP Diagonally brace at 4' O.C. Wall as specified; refer to arch plan Roof deck, structure or floor above. Refer to RCP for finish Galvanized steel sheet deep leg deflection track 18 ga, 'slp- trk' by Sliptrack Systems, inc. Omit at hung soffit conditions.1"Fastener distance6" Min.Do not fasten gypsum board or metal studs to deflection track© 2021 - All Rights Reserved. No portion(s) of this document may be reporoduced without written approval of Design CollectiveArchitect, License # Expiration Date: December 31, 2021 PROJECT NO. INITIAL ISSUE DATE REVISIONS PROJECT STATUS 8/5/2021 4:06:50 PM A5 Architectural Details 1090.02 The Proscenium Building 31200 S. Rangeline Rd., Carmel INJune 4, 2021 AR11900062 For Permit OWNER TJKKitchens&Brewpubs 4022 North Hampton Dr. Powell, OH 43065 Tel: 614-406-3905 Email: thad@101beerkitchen.com ARCHITECT Design Collective Architecture 151 East Nationwide Blvd. Columbus, OH 43215 Tel: 614-464-2880 Email: mtoddy@dcollective.com STRUCTURAL ENGINEER Jezerinac Geers & Associates 5640 Frantz Rd. Dublin, OH 43017 Tel: 614-766-0066 Email: dschoeff@jgaeng.com MEP ENGINEER Prater Engineering 6130 Wilcox Rd. Dublin, OH 43016 Tel: 614-766-4896 Email: bcaines@praterengr.com GENERAL CONTRACTOR Capitol Construction Services, Inc. 11051 Village Square Lane Fishers, IN 46038 Tel: 317-574-5488 Email: kschott@capitolconstruct.com LANDLORD Novo Development Group 1215 S. Rangeline Rd. Carmel, IN 46032 Tel: 317-708-9400 Email: thill@novo.dev Contact: Thad Kittrell Contact: Matt Toddy Contact: Dave Schoeff Contact: Billy Caines Contact: Kevin Schott Contact: Tim Hill Scale: 1 1/2" = 1'-0"14Planter -Section Scale: 1" = 1'-0" 3BK Storefront Infill Scale: 1" = 1'-0"4Typical Exterior Wall Scale: 1" = 1'-0" 1 Typical Banquette Scale: 1" = 1'-0" 2Nana Wall Section Scale: 1" = 1'-0"5Banquette Separation Wall Scale: 1" = 1'-0" 10Lavatory Scale: 3" = 1'-0"6Base -Silikal Scale: 3" = 1'-0"11 Base -RR Tile Scale: 3" = 1'-0"7Concrete -Kitchen Curb (Silikal) Scale: 3" = 1'-0"12Framing at Dish Curb Scale: 3" = 1'-0" 13Framing at Floor Scale: 1 1/2" = 1'-0"9Bulkhead Section Scale: 3" = 1'-0"8Framing at Deck (Metal) #Description Date 10/06/21