HomeMy WebLinkAboutC1.0 Cover Sheet141st STREET KODIAK DRIVEKODIAK DRIVEKO
D
IA
K
D
R
IV
EKODIAK DRIVEKODIAK DRIVEHELEN DRIVE HELEN DRIVEERIS LANE ERIS LANE
KODIAK DRIVE
WILMUTH DR EX. KODIAK DRTROY ESTATESCARMEL, INDIANACOVER SHEETC1.0
COVER SHEET
REVISIONS
TROY ESTATES
CONSTRUCTION PLANS
LENNAR HOMES OF INDIANA, INC.
UTILITY CONTACT INFORMATION:
LOCATION MAP SOILS MAP
SOILS LEGEND
SITE MAP
AREA LOCATION MAP: STATE OF INDIANA
PROJECT LOCATION:
CITY OF CARMEL
HAMILTON COUNTY
SURVEYOR:
STORM WATER ADMIN.:
CABLE:
WATER:
ELECTRIC: SANITARY:
DEPARTMENT:
GAS:
TELEPHONE:
CARMEL ENGINEERING
CARMEL ENGINEERING DEPT.
FLOOD HAZARD STATEMENT:
DEVELOPMENT STANDARDS
ZONING: S2 PER ORDINANCE Z-645-19
MIN. LOT WIDTH AT BUILDING LINE 90' (Docket 19070005 V)
MIN. FRONT YARD SETBACK 25' (Docket 19050022 V)
MIN. REAR YARD SETBACK 20'
MIN. SIDE YARD SETBACK 5' (Docket 19070006 V)
MIN. SIDE YARD AGGREGATE 25'
MIN. LOT AREA 12,000 SF
MAX. LOT COVERAGE 35%
MAX. PRINCIPAL BUILDING HEIGHT 35'
MIN. GROUND FLOOR AREA One story: 1,100 SF
Two story: 800 SF
PHASING: ONE PHASE
INDIANAPOLIS - TERRE HAUTE
LAFAYETTE - MUNCIE - NEW ALBANY
www.hwcengineering.com
TROY ESTATES
DENSITY = 39
23.45 Ac.= 1.66 LOTS / Ac.
24.52% = OPEN SPACE = 5.75 Ac.
TOTAL ACREAGE = 23.45 Ac.
SURVEYOR: (Austin Oaks)
SHEET LIST TABLE
Sheet Title Sheet Description
C1.0 COVER
C1.1-C1.2 DEVELOPMENT PLAN
C1.4-C1.5 PRE-CONSTRUCTION STORMWATER POLLUTION
PREVENTION AND DEMOLITION PLAN
C1.6-C1.7 POST CONSTRUCTION STORMWATER
POLLUTION PREVENTION PLAN
C2.0-C2.2
STRIPING PLAN
C3.3
STREET PLAN & PROFILE
C4.0-C4.2
STORM SEWER PLAN & PROFILEC6.0-C6.4
SANITARY SEWER PLAN & PROFILE
C7.0-C7.1
CONSTRUCTION DETAILS
WATER DISTRIBUTION PLAN
STORMWATER POLLUTION PREVENTION NOTESC8.0
STORMWATER POLLUTION PREVENTION DETAILSC8.1-C8.3
INTERSECTION PLAN
ENTRANCE PLANC3.0
C3.2
C1.8-C1.9 EMERGENCY FLOOD ROUTE PLAN
C8.5
CARMEL WATER SPECIFICATIONSC8.8
SANITARY SEWER DETAILSC8.10-C8.11
SANITARY SEWER SPECIFICATIONS
CARMEL WATER DETAILSC8.9
HCSO DETAILS
C8.6
C8.7
CARMEL DETAILS
C8.4
CARMEL PAVING & CURB POLICY
C8.12
OVERALL GENERAL PROJECT NOTES:
VEGETATIVE COVER:
STORM SEWER FOR THIS
PROJECT WILL BE PUBLIC
CARMEL GENERAL NOTES:
SURVEYOR:DEVELOPER:
LENNAR HOMES of INDIANA, INC.
9025 NORTH RIVER ROAD, SUITE 100
INDIANAPOLIS, IN 46240
(317) 659-3200
STUART HUCKELBERRY
stuart.huckelberry@lennar.com
CIVIL ENGINEER:
HWC ENGINEERING
135 N. PENNSYLVANIA ST.,
SUITE 2800
INDIANAPOLIS, IN 46204
(317) 347-3663
keichhorn@hwcengineering.com
HWC ENGINEERING
135 N. PENNSYLVANIA ST.,
SUITE 2800
INDIANAPOLIS, IN 46204
(317) 347-3663
keichhorn@hwcengineering.com
MAINTENANCE OF TRAFFIC PLANC3.1
C3.4 TRAFFIC CONTROL & LIGHTING PLAN
E1.1-E1.2 EXISTING CONDITIONS PLAN / ALTA SURVEY
C1.3-C1.3A GRADING AND DRAINAGE PLAN
BENCHMARK NOTE
LANDSCAPE DETAILSL1.2-L1.3
LANDSCAPE PLAN
LANDSCAPE STREET TREE PLANL1.0-L1.1
L100-L101
STORM SEWER STRUCTURE DATA TABLESC6.5
C1.10 COMMON AREA PLAN
DISTURBED AREA = 24 AC±
ESTIMATED START DATE: JULY 2020
ESTIMATED COMPLETION DATE: JULY 2025
DESIGN SPEED = 25 MPH
10/07/21