HomeMy WebLinkAboutC1.5 Pre-Construction SWPPPP.W.P.
WVD
YH P.W.P.
S
M.B.G
WVD
YHP.W.P.
P.W.P.
T.P.
P.W.P.
P.W.P.
P.W.P.
M.B.
P.W.P.DYHSTDYHT.P.E.T.
S
ACDYH
T E OHEGAS GAS GAS GAS GAS GAS GAS
W W W W W W W W
W
W
W W W W
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHE OHE OHEx x x x x x x x x x xx x x x x xx x x x x x x x x xx xxxx x x x x x xx x xxxxxx
x xx xx xxxx xxxx xx xxxxx xxx xx
x x x x x x xx
OHE
OHE
CTVCTV8788798808808
81
8
8
2
8
8
3
8
8
4
8
8
5 8868878888908928938
94
8
9
5 8968958
9
7
8
9
9
90
0
8
9
8
90
1
903
90
1 904904905
902
903
904
901900897896895894892891890889888887886885884
879
88 2884
Yard Spigot
Yard Spigot
Yard Spigot
))))))
)
)
)
)
)
)
)
)))))))))))))))))))0'
(IN FEET)
GRAPHIC SCALE
50' 100' 150'
Call 811 or 800-382-5544 Before you Dig!TROY ESTATESC1.5
REVISIONS
PRE-CONSTRUCTION
STORMWATER POLLUTION
PREVENTION AND
DEMOLITION PLANPRE-CONSTRUCTION STORMWATER POLLUTIONPREVENTION AND DEMOLITION PLANCARMEL, INDIANACARMEL GENERAL NOTES:
INDIANAPOLIS - TERRE HAUTE
LAFAYETTE - MUNCIE - NEW ALBANY
www.hwcengineering.com
FOR CONTINUATION SEE SHEET C1.4
LEGEND
DEMOLITION KEYNOTES: #
THIS SHEET TO BE USED FOR
EROSION CONTROL ONLY.
PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:
NOTE:
SEE SHEET C8.0 FOR A LIST IN SEQUENCE
OF CONSTRUCTION ACTIVITIES.
BENCHMARK NOTE
10/07/21