Loading...
HomeMy WebLinkAbout1394 West Wind Project Level EstimateCharges Item Description Unit Cost Tax Quantity Line Total Client Direction UPDATE DIRECTION: 8/25/21 Client Meeting 8/21. Client Review and Response to Initial Estimated Dated 8/18/21. Changes Noted in Italics Client Direction: Client: Hal Via: Phone Conferences, Emails, & Site Visits Direction: Client currently resides out of state and recently acquired home. Client is working with Others for flooring and painting. Client is a Construction Professional and acknowledges the risks with such a strategy. $0.00 1.0 $0.00 Inspection/Assessment INSPECTION/ASSESSMENT: Fairchild: Marc & Bill Dates: Inspection through 8/12 See Attached, Partial Photo Set, Annotated GENERAL PROPERTY INFORMATION: --Date of Construction, 1987 --Talon (home) Inspection Report, dated 5.11.21. Client recently acquired the property and has yet to occupy for any length of time. Information from the Home Inspection Report and Fairchild's initial, non-invasive inspections identify general concerns with regard to moisture/plumbing. See the attached document. (moisture/plumbing). Fairchild recommends these issues be investigated and repaired either as a pre-emptive effort before the remodeling project or concurrent to the project for the mitigation of damages and use of the property. See 8.25.21 Westwind Circle Moisture Concerns (document, attached). --Orientation: Looking at Front Door (Front), Left Elevation, Right Elevation, Rear Elevation. KITCHEN: Existing --Open Kitchen with Eat-In Space --Floor/Ceiling: 306SF, 79LF, 632SF of Wall Area --Floor has been removed. --(4) Openings/Doors & Passage Ways: (1) 6' Sliding Door (patio), (1) Passage into Great Room, (1) from Front Hallway, (1) into Dining Room. $0.00 1.0 $0.00 Estimate #894014 Billing Address Hal Debra Brey 1394 West Wind Circle Carmel IN 46032 United States halbreyjr@gmail.com +1 503 312 8705 Service Address Hal Debra Brey 1394 West Wind Circle Carmel IN 46032 United States halbreyjr@gmail.com +1 503 312 8705 Send Payment To Fairchild Services Group, Fairchild Renovations 3185 Shadeland Avenue, #200 Indianapolis IN 46226 United States 3174326758 marc@fairchildrenovations.com Sent On 08/18/21 Total $89,031.00 Payments $5,000.00 Balance $84,031.00 --(2) Windows, Same wall (Left Elevation) --16.5 SF opening between Great Room & Kitchen --Finishes: Painted Walls, Stain Trim Package, Stomp Texture for Ceilings. (1) Hanging Light, Several Recessed. --Existing Appliances: Electrical Range with over the range Microwave, Dishwasher (left of sink), and stand alone Fridge. --Bulkheads in place (Left Elevation, Front Elevation, and Right Elevation) --Peninsula on end of Left Elevation cabinets. MASTER BATHROOM: Existing --Access from Master Suite, 2'4" LH Out --Double Vanity, built in cabinet (window seat) with 3'10" window above it. --Knee Wall to separate toilet and shower area. --Base tub and shower walls in alcove setting --Approximately 78SF of floor space/ceiling, 40LF of walls, 318SF of Wall Area, --Brick Exterior. --Toilet setting is code compliant with knee wall. --Partial flooring removal completed. --Finishes: Sconce and Recessed Light, Stomp Ceiling Texture, Stained Trim Pack. POWDER BATHROOM: Existing --Access from Garage Entry Hallway, 28" LH Inswing --Single Vanity 42". --Toilet placement is in code compliant with 16" on wall side clearance from center line, 17" from vanity. --Approximately 33SF of floor and ceiling, 23lf of walls, 184 SF of wall area. --Tile has been removed, evidence of flange/toilet set defects with resulting subfloor deterioration and suspect biological growth. FOYER/DINING ROOM: Existing: --Dining Room has an entry from the kitchen --Dining Room has a case entry from the foyer and from the Dining Room into the Living Room Custom Remodel Budget CUSTOM REMODEL BUDGET: IMPORTANT LIMITATIONS: As of the date of this estimate, the final design of the Kitchen, and all finish materials are pending selection by Client. The functional materials estimated in this budget are of a standard quality and consistent with the functional materials used by Fairchild and meet code requirements and general industry standards. For example, the switches and receptacles included in this estimate are base models and will match the color per room with base cover plates. This Budget is provided in Good Faith based upon the general direction provided from Client in email exchanges and phone conferences. OTHERS: I. Fairchild, in an effort, for pricing transparency and based upon known performance and quality, has recommended (3) service providers to Client with whom Client will work directly with service providers, including all financial matters. Trillium Cabinetry: SCOPE: Kitchen and Vanity Cabinets and ALL accessories Specialized Granite: Client may select stone from Global Granite (stone supplier only--Specialized with fabricate and install). Kitchen Counter top stone Undermount sink Master Bathroom $0.00 1.0 $0.00 Curb stone (other desired shower stone) Vanity counter top stone and backsplash Powder Bathroom: Vanity counter top stone and backsplash NorthSide Glass: Master Bathroom Shower Glass II. Client's Others: Client has a desired service provider for all painting AND flooring installation. Project Plan PROJECT PLAN: 8/18/21 PROJECT AREAS: KITCHEN POWDER BATHROOM DINING ROOM MASTER BATHROOM (RELATED MASTER BEDROOM DRYWALL WORK) PROJECT PLAN: Design Completion. Estimate Update per Final Design. Estimate Approval and Contract Execution. Procurement of Materials: Client, Finish Materials Fairchild, Functional Materials SO Application and Issuance of Permit, City of Carmel. Property Preservation. Demolition. Framing Modifications. Rough In Plumbing. Rough In Electrical. HVAC Modifications. Exhaust Venting (interior/exterior). Exterior Glass Block Window. Permit Inspection. Drywall Installation, Finishing, and Repairs. Custom Tile Shower. Priming and Painting: Others Flooring: Others. Carpentry. Stone Measurement/Template. Stone Installation. Backsplash Installation. Finish Plumbing: Faucets, Toilets, Trim Kits, Appliances (Kitchen). Finish Electrical: Devices (Receptacles and Switches), Hanging Lights, Recessed Lighting Trim. General Finishing. CONCURRENT SELF-PERFORMED WORK: 8/23/21 Foyer Finishing Laundry Room Finishing Bath #2 $0.00 1.0 $0.00 Client Commitments Remodeling CLIENT COMMITMENTS REMODELING: Client agrees and commits to the following: #1. Client has read the estimate carefully before agreeing/approving the estimate. The estimate sets forth the scope and cost of repairs and duties of all parties. #2. The client will provides access to the property via lock box during the hours of 8AM to 6PM, Monday through Friday. Extended access by agreement. #3. Client advised there will be a progressive level of occupancy with initial intermittent occupancy with limited furnishings will transition into full occupancy (and furnishings). $0.00 1.0 $0.00 Client has a shared responsibility with Fairchild to protect their personal property. The client will remove personal property from the targeted project areas (adjacent to the same), the contiguous walls, and the directed areas of ingress/egress to the project areas. #4. Client has had some finishing performed, painting, and intends on having floors installed as required to project execution. Fairchild will have to introduce appropriate property preservation measures to contain dust, mitigate air exchange, and protect new flooring. #5. Client will provide one bay of the garage, or other available floor space, for the staging of materials, equipment, and tooling. #6. Client will provide driveway space for the placement of a debris trailer and/or dumpster for the duration of the project. #7. Client agrees to participate in the Remodel Phase Approval Process and to provide timely feedback with any concerns. Remodel Phase Approval REMODEL PHASE APPROVAL: Client Approval & Acceptance: In effort to deliver on client's expectations and to avoid miscommunication and potential delays, we require three documented meetings with the client (on-site) and approval from client that each phase of the remodeling process has been completed to the plan and their satisfaction. Phase I: Post Property Preservation & DEMO Fairchild will introduce the estimated scope of property preservation and scope of demolition. Fairchild will STOP. Project areas will be cleared of debris and cleaned. Client and Fairchild will inspect the completed property preservation and demolition. Fairchild will identify any obstacles to the Project Plan, Design, etc. Estimates are predicated upon visual inspections. Any material change in labor and materials or project cycle time will be documented with a written Change Order for Client's signature. Phase II: Post "Rough-In" (Framing, Plumbing, Electrical, and HVAC) (& repair of any unforeseen conditions, if exist). Upon Phase I approval from Client, Fairchild will execute the Phase II deliverables: framing/subfloor repairs/replacement, modifications, Plumbing Rough-IN, Electrical Rough-In, and HVAC alterations. Fairchild will STOP. Client and Fairchild will inspect the completed work for alignment with designs, Project Plan/Estimate, Fixtures and Device locations, etc., as well as workmanship. Please note, changes after drywall will delay the expected completion date and will require Change Order(s) with additional costs. Upon Client's approval of the Phase II scope of work, Fairchild will schedule the Rough-In inspection with Carmel. Phase III: Reconstruction, Initial Completion and Final Completion Upon Client's approval of Phase II, and Permit Approval, Fairchild will initiate the Reconstruction Phase. Fairchild will complete approximately 90% of the Reconstruction Phase (as Fairchild deems, near completion, and in a progressive fashion by area) and will STOP. Client and Fairchild will inspect the completed work for feedback from the Client on issues of "Fit and Finish", as all of other work has been approved. Client and Fairchild will agree upon any "Punch List/Fit and Finish" repairs to be completed, within the scope of the original Project Plan and Estimate. Fairchild will complete the Reconstruction Phase, as well as any "Punch List" repairs. Client and Fairchild will conduct a final walk through and if applicable, Client and Fairchild will agree upon any final "Punch List" repairs and complete the $0.00 1.0 $0.00 same for Client's final approval. Upon Client's approval, Fairchild will schedule the Certificate of Occupancy inspection with the Carmel, as well as remove all property preservation, debris, tooling/equipment, etc. Client Provided Materials Client Provided Materials: As discussed with Client, Client will provide all finish materials (see attached lists per room). "Finish Materials" are those materials in which there are color and/or function attributes specific to the Client's desires. Fairchild reserves the right to modify the estimate and or refuse to install any materials outside of the assumptions of the estimate or with products that are known to have service/performance issues. High Level: KITCHEN: Cabinets and Pulls/Hardware, Cabinet Trim and Scribe (Trillium) Stone (Specialized Granite)--stone, fabrication, and installation, and sink. Plumbing Fixtures and Appliances (Including Exhaust Hood) Lighting (hanging, undercabinet/ambient, recessed lights if outside of Fairchild specifications whether client opts for Fairchild provided or provides or desires upgraded recessed lights, all recessed lights are to match (new). Tile and Grout, Back splash. MASTER BATHROOM: Vanity and Vanity Cabinet Hardware and Trim, including Pulls (Trillium) Plumbing Fixtures: Shower (complete), Vanity Faucets, Drain cover, Toilet Stone (Specialized Granite)--stone, fabrication, installation, and sinks. Shower Curb, if desired (recommended) Tile(s) and Grout Custom Glass/Door (Northside Glass) Exhaust Fans Door Hardware Bathroom Accessories: Mirrors, Towel Holders, Paper Holder, hooks, etc. Hanging/Sconce Lighting, Recessed Lights if outside of Fairchild specified lighting, whether client opts for Fairchild provided or provides or desires upgraded recessed lights, all recessed lights are to match (new). POWDER BATHROOM: Vanity and Vanity Cabinet Hardware and Trim, including Pulls (Trillium) Plumbing Fixtures: Vanity Faucet, Toilet Stone (Specialized Granite)--stone, fabrication, installation, and sink. Exhaust Fan Door Hardware Bathroom Accessories: Mirror, Towel Holders, Paper Holder, hooks, etc. Hanging/Sconce Lighting, Recessed Lights if outside of Fairchild specified lighting, whether client opts for Fairchild provided or provides or desires upgraded recessed lights, all recessed lights are to match (new) . Fairchild has referred Client on a direct basis to suppliers and service providers for Client to procure the layout and materials exact to their specifications. Fairchild will be informed on finish materials selections to align with budget and to address any quality/service concerns. ALL FINISH MATERIAL SHOULD BE ON SITE, IN STOCK WITH SUPPLIERS, OR WAREHOUSED BY FAIRCHILD PRIOR TO $0.00 1.0 $0.00 SCHEDULING. Due to cabinet lead time and Client's direction, best practices will be deviated from to mitigate the amount of site production once occupied. Permit Compliance PERMIT COMPLIANCE: Jurisdiction: City of Carmel Fees (as of 4/1/19): Filing Fee/Review: $175 Inspections (2): $144 Certificate of Occupancy: $69 Total Projected Fees: $388 Permits are charged at the cost charged Fairchild Renovations. Additional fees may be charged, at the discretion of Carmel. NOTE: Compliance Inspection (AHJ--authority having jurisdiction) may require repairs/modifications beyond the scope of this contract/project that must be addressed as part of the permit approval process. Any such requirements will accompany a Change Order addressing the same. NOTE: If work performed by Fairchild is identified as lacking by the AHJ, Fairchild is responsible for any additional inspection fees or fines, etc. $388.00 1.0 $388.00 Property Preservation Property Preservation: Introduce floor protection in general areas and contiguous to the project area: builder board or similar and carpet protection for the basement stairs and basement, carpeted areas. Remove the Master Bedroom and Powder Bathroom Doors and store on site. introduce zipper doors. Plasticate the MBR closet door on the room side. Introduce zipper doors into the Kitchen from the Garage Hallway and into the Dining Room. Frame a containment area where the passage and pass through exist from the Great Room. Cover any furniture or personal property in proximity to the project areas. Cover HVAC Supplies and Returns in the Project Areas Introduce a HEPA Air Scrubber for Demolition and Reconstruction to mitigate dust and air safety. Maintain a clean and orderly project area(s) as appropriate for the stage of the project. CLIENT NOTE: Despite robust Property Preservation Measures, there will be some uncontrolled level of dust. We recommend Client plan on or budget for a deep, post construction cleaning after completion. $0.00 1.0 $0.00 Demolition DEMOLITION: It is assumed the scope of Demolition can be performed without any intervening repairs, such as the replacement of plumbing stops, electrical defects, etc. The repairs of these items during demolition is not included in the estimate. SPECIAL NOTES: Client desires to re-purpose a contingent of the kitchen cabinets. Client will identify which cabinets that will be retained. Fairchild does not warranty or guaranty any demo property can be removed without marring or other damage. KITCHEN: Using Existing Plumbing Stops, terminate water supply to faucet and appliances, disconnect supply lines and drain line. Disconnect and remove appliances and RETAIN. Fairchild will temporarily place any needed appliances (fridge/microwave) on the same floor as the Kitchen. Remove window treatments and discard. Remove hanging lights and discard. $0.00 1.0 $0.00 Remove counter tops, sink, faucet, disposal. RETAIN THE SINK AND STRAINERS. DISCARD FAUCET AND DISPOSAL. Remove the cabinets. Retain Client identified cabinets on site, discard all others. Remove both bulkheads. Remove any remaining flooring under the cabinets. Remove trim contiguous to cabinets and RETAIN FOR RE-PURPOSING AND CLIENT WILL PAINT. Fairchild does not warranty or guaranty all trim elements will be able to be re-purposed. Remove existing recessed lights. Remove drywall as needed for framing and/or mechanical modifications. Delaminate the trim and drywall on the pass through to prepare for plan. Delaminate drywall and passage way for framing. MASTER BATHROOM: Terminate the water (main, likely) due to the shower valve supply. Remove the drywall in the alcove*/area where vanities currently exist* to expose the studs. Remove the surround and tub, and discard. Terminate the supply lines to the shower valve and cap lines. Return water supply. Terminate water to the toilet and the vanities at the stops. Remove the toilet and discard. Remove the vanity top and sinks, faucets, and discard. Remove the vanity and discard. Demo the knee wall Delaminate the walls of the bathroom as needed per the project poject: Vanity inset area for closet configuration. Bathroom entry wall and Master Bedroom Wall for framing of Pocket door. Window all for the deletion of the window. Remove the built-in window seat. Remove and RETAIN all lights. Disconnect and remove fans AND RETAIN. Fairchild does NOT recommend repurposing the existing bath fans. Remove and RETAIN all trim elements for repurposing (see comments above) and RETAIN accessories. POWER BATHROOM: Terminate the water supply at the stops and remove and discard the toilet, the vanity sink, counter top and faucet. Remove trim element contiguous to vanity. Delaminate the walls of the bathroom as needed per the project poject. Remove all accessory items, lights, and fan and RETAIN. DINING ROOM/FOYER DEMO: Self-Performed POST DEMO CLEANUP: Remove all debris from the home and sweep. Remodel Phase Approval Phase I: Post Property Preservation & DEMO Fairchild will introduce the estimated scope of property preservation and scope of demolition. Fairchild will STOP. Project areas will be cleared of debris and swept/organized. Client and Fairchild will inspect the completed property preservation and demolition. Fairchild will identify any obstacles to the Project Plan, Design, etc. Estimates are predicated upon visual inspections. Any material change in labor and materials or project cycle time will be $0.00 1.0 $0.00 documented with a written Change Order for Client's signature. **This is an important phase of the project--the first time the Client and Fairchild will be able to materially inspect the condition of the framing, electrical, plumbing, etc. Window Installation WINDOW INSTALLATION: MASTER BATHROOM SCOPE: Remove interior and exterior casing and trim. Remove the window and discard. Remove framing as needed for window and introduce new framing from the sill plate to the window header. Introduce substrate and seal/flash. Install framing for framed glass block window and seal. Allowing for window to cure and Water Test. Install *(*LKQ) Cedar Trim Element, prime, paint, caulk. Color Matching: Limited by technology, nor warrantied or guaranteed. $0.00 1.0 $0.00 Framing- Remodel Framing - Remodel: KITCHEN: Introduce a temporary wall in the Kitchen to support the ceiling joists. Remove the framed wall from exterior wall to the existing opening. SPECIFICATIONS for final materials pending and design of structural repair--assumed 2XLVLs with 3.5" Columns. OPEN: Framing repairs as a result of demo. MASTER BATHROOM: Introduce framing and pocket door (32") for bathroom entrance with required header (temp supports if needed). Frame front of the Closet: 48" 6 Panel Ball Catch (open/out door) Introduce framing for wall between shower/toilet and vanity areas (32"pocket door). Repair/Replace and Modify Framing for the new dimensions of the shower: and framing for his and her niches, as well as custom glass installation, and as needed for plumbing rough in. Remove the existing subfloor (shower area) to prepare for drain modifications. Add blocking for towel bars and accessories. OPEN: Repair any framing as a result of demo. POWDER BATHROOM: Remove the toilet flange, mark placement, and remove and replace a majority of the subfloor. Add blocking for towel bars and accessories. OPEN: Repair any framing as a result of demo. DINING ROOM/FOYER: Introduce framing on the shared Foyer/Dining Room wall for drywall repairs. Modify existing opening on shared wall of Dining Room/Family Room for double hung door 5.0 $0.00 1.0 $0.00 Plumbing RI Plumbing "Rough In" Remodeling Necessary modifications/additions of supply and drain side plumbing to accommodate specifications and plans. This is an initial budget and will be validated Post DEMO Inspection. SCOPE: Lic. Plumber KITCHEN: Expose supply side plumbing and replace plumbing stops. $0.00 1.0 $0.00 Install Ice Maker Supply line and valve box per design of the kitchen, (same wall). Modify drain side plumbing of sink to accommodate undermount sink. Modify the existing gas line in the basement and run (1) gas line for the kitchen cooktop with valve for appliance connection (grounded CSST-corrugated stainless steel tubing). MASTER BATHROOM: Design and install drain line for new placement of vanity on opposing side of the wall with vent provisions. The vent line will be taken to the attic and then connected to existing vent line or penetrate roof with an ultimate pipe boot. Rough In 4 new supply lines for the new vanity placement (pex materials with crimp fittings--no "shark bites") and cap. Note, new vanity will be placed on exterior wall and supply lines will penetrate the floor, just outside of the wall. Inspect the existing toilet flange and advise. Introduce supply side plumbing for (1) shower valve and install Client provided Shower Valve. Modify shower drain for per Client direction within the limitations of the space and for best functional center location of shower. Replace toilet supply stop. POWDER BATHROOM: Install new toilet flange. Replace toilet supply stop. Assuming new vanity is within existing supplies and drain line, install new plumbing stops and inspect the drain side plumbing. Electrical RI Electrical "Rough In" Necessary modifications of existing and new circuits to support receptacles, appliances, switches, lights, etc. per specifications and plans. This is an initial budget and will be validated Post DEMO Inspection. SCOPE: Lic. Electrician KITCHEN: Modify existing range circuit for wall oven and rough- in wiring of the same. Rough-In for power: cooktop (gas) Exhaust hood Primary Lighting Circuit: 3 Way Switches (2) locations for primary lighting circuit. Up to 8 base LED can lights with white trim on primary lighting circuit. Secondary Lighting Circuit: Switch controlled hanging light for sink. Switch controlled hanging light for eat in area. Switch Controlled pendant lighting (up to 3) for the peninsula or island. Ambient Lighting: Client to provide under cabinet lighting. Rough-in switch (1) and wiring for under cabinet lighting on both sides of kitchen. Introduce receptacle for DW Delete/Modify up to 4 receptacles, pending final design. MASTER BATHROOM Shower/Toilet Room: $0.00 1.0 $0.00 Introduce (1) switch to control: (Shower/Toilet Area) 2 led base recessed lights in shower ceiling. Fan only in shower 2 led base recessed lights in remaining area (toilet/general). Introduce (1) GFCI for toilet side of shower room. Vanity Area: Introduce (2) base led can lights for general illumination and exhaust fan-(1) Switch Introduce (2) sconce lights rough-in and switch for vanity sconces. Outside of Closet, Introduce lighting circuit with 1 recessed base led in ceiling and shelf lighting. Introduce his/her's (2) GFCI protected receptacles for the new vanity placement. POWDER BATHROOM: Install client provided exhaust fan Repair/Replace GFCI receptacle GENERAL NOTES: ELECTRICAL Receptacles in Kitchen and Bathrooms will be GFCI protected as required by code. Exhaust Venting EXHAUST VENTING: Client has a bundle of the original shingles on site for use. Fairchild will use these shingles, assumed viable. There may still be a color difference that is noticeable due to weathering/age of original installation shingles. KITCHEN: Introduce metal duct from exhaust vent hood into attic and from attic to roof mounted port with opening in decking. Remove shingles and install (1) Broan NuTone A Steel Roof Cap Black with damper, repair/replace contiguous shingles. MASTER BATHROOM: Introduce (1) opening in the rear elevation roof line in proximity to the Master Bathroom. Install Broan Roof Exhaust Hood and shingle work as above. Introduce insulated exhaust duct from Master Bathroom Fans (2) and connect to hood. POWDER BATHROOM: Introduce (1) opening in the roof in proximity to the Powder Bathroom. Install Broan Roof Exhaust Hood and shingle work as noted previously. Introduce insulated exhaust duct from Powder Bathroom fan to hood. HALL BATHROOM: Install a dedicated exhaust hood of the roof with related shingle replacement and install insulated exhaust line from existing fan to exhaust port. $0.00 1.0 $0.00 HVAC R/I HVAC Rough In (Supplies) SCOPE: KITCHEN: Inspect and advise on under cabinet supply line. Condition unknown. MASTER BATHROOM: Modify (2) Supply Lines in the Master Bathroom, location pending demo and Client's direction, existing location will not align with current design. $0.00 1.0 $0.00 Fire Barrier FIRE BARRIER (and Internal QC): Electrical and Plumbing Rough In SCOPE: All Project Areas; Introduce framing as needed for fire blocking. Install sealant for plumbing and electrical penetrations where new rough in has been executed. Stud Gaurds: Install 6" nail/stud guards on all new rough in plumbing and electrical per Carmel Code Requirements. Internal QC: Cleaning of projects areas and preparation for Phase II meeting with Client and Permit Inspection. $0.00 1.0 $0.00 Remodel Phase Approval Phase II: Post "Rough-In" (Framing, Plumbing, Electrical, and HVAC) (& repair of any unforeseen conditions, if exist). Upon Phase I approval from Client, Fairchild will execute the Phase II deliverables: framing/subfloor repairs/replacement, modifications, Plumbing Rough-IN, Electrical Rough-In, and HVAC alterations. Fairchild will STOP. Client and Fairchild will inspect the completed work for alignment with designs, Project Plan/Estimate, Fixtures and Device locations, etc., as well as workmanship. Please note, Phase II changes (framing, plumbing, electrical, HVAC) after drywall will delay the expected completion date and will require Change Order(s) with additional costs. Upon Client's approval of the Phase II scope of work, Fairchild will schedule the Rough-In inspection with Carmel. $0.00 1.0 $0.00 Permit Compliance PERMIT COMPLIANCE: Carmel--Rough In Inspection and Approval Schedule and Attend Code Compliance Inspection $0.00 1.0 $0.00 Framing- Remodel FRAMING- Remodel: MASTER BATHROOM: Install subfloor after inspection for shower/toilet room. GENERAL: Install subfloor in Kitchen and Powder Bathroom if not yet completed due to Compliance Inspection Access $0.00 1.0 $0.00 Drywall Remodel Project DRYWALL REMODEL PROJECT: MASTER BATHROOM: Install moisture board where drywall was removed on the walls and ceiling and finish. Replicate stomp texture on the ceiling. Master Bedroom: Replace drywall removed for pocket entry door into bathroom and repair wall (existing crack is in place, as well as intended repairs. KITCHEN: Install moisture board where removed in functional area of kitchen and finish. Replace ceiling board and finish. Ceiling, replicate stomp texture. Prep backsplash area: repair/finish. Great Room: install and repair drywall on Great Room side of Kitchen due to alterations of pass thru/passage way. POWDER BATHROOM: $0.00 1.0 $0.00 Replace drywall removed for Rough In Work and finish. IMPORTANT: CLIENT IS HAVING OTHERS PAINT. Meeting with Client's Painting Service Provide and Fairchild PM to inspect new and repaired drywall for hand off for priming and painting. Final drywall finishing is part of priming and painting. There will likely be some imperfections in the finish coat of the drywall that will be unknown until primer is applied--this is part of the painting scope of work. Custom Shower CUSTOM SHOWER: MASTER BATHROOM: Install Wedi System Shower: custom pan 40" X 60" with all Wedi system materials and walls. The Wedi pan is not a finished, tile will be installed on the Wedi pan--traditional tile presentation when shower is completed. Install Client Provided Pan tile and grout. Install Client provide wall tile and accent tile and grout. Tile Pricing is Based Upon Basic Tile Installation: uniform size of tile and color (does not include white tile and black grout or other material color differences) and up to 2 accent tiles (niches, borders, etc.) Specialized Granite to install solid surface shower elements*, if desired by client such as the curb or any trim elements for niches, etc.* IMMEDIATELY UPON COMPLETION OF SHOWER (TILE): North Side Glass Final Measurement for fabrication of Glass Enclosure/Door $0.00 1.0 $0.00 Project Notes PROJECT NOTES: Fairchild will complete the Drywall and Master Bathroom Tile Work and will STOP. Fairchild will return on the agreed upon re-start date with Client and Client's service providers. Fairchild PM, Client, and Client's service providers will inspect the project site. Fairchild will perform interim cleaning, update property preservation, and consolidate remaining tools/equipment and materials. $0.00 1.0 $0.00 Painting Remodel PAINTING REMODEL - OTHERS Client has Others performing all painting. Initial Painting Scope: Prime all new and repaired drywall: ceiling and walls Paint Ceilings in Project areas Paint walls in project areas Paint walls in contiguous areas to project areas that required repairs. There will need to be a finish painting due to the usual marring/scuffing that occurs in the reconstruction phase-- Client's painter is responsible for the same. Any and All Painting and Painting related scope of work is the responsibility of Client's preferred service provider. $0.00 1.0 $0.00 Flooring New FLOORING NEW: OTHERS CLIENT FLOORING INSTALLER: Client's flooring installer is responsible to level floors per specs of flooring and to install flooring in the Powder Bathroom, Kitchen, and Bathroom. Any and All Flooring and Flooring related scope of work is the responsibility of Client's preferred service provider. $0.00 1.0 $0.00 Custom Carpentry Skilled/Cabinetry Carpentry--Remodel: NOTE: Fairchild will focus on setting the kitchen lower $0.00 1.0 $0.00 NOTE: Fairchild will focus on setting the kitchen lower cabinets and the (2) vanity cabinets to allow Specialized to promptly make templates for Client's stone. KITCHEN: Install Client provided cabinets, hardware, trim elements/molding per pending design. Install existing base and casing molding, if additional molding is needed Fairchild will source LKQ paint grade molding. Client's flooring service provider or Client is responsible for shoe molding and installation of the same. Fairchild will prep trim for Others to Paint. MASTER BATHROOM: Install Client provided vanity cabinet(s), hardware, trim elements/molding per selected units. OPEN: Client linen closet shelving design and unit. No labor nor materials included in this estimate for closet shelving. Install existing base and casing molding, if additional molding is needed Fairchild will source LKQ paint grade molding. Client's flooring service provider or Client is responsible for shoe molding and installation of the same. Fairchild will prep trim for Others to Paint. Install (1) 32"W x 80"H Primed Woodgrain 6- Panel Interior Door Slab for entry into bathroom: pocket door. Install Client provided door hardware. Install (1) 32"W x 80"H Primed Woodgrain 6- Panel Interior Door slab for entry into toilet/shower room and install Client provided door hardware. Install (1) Pre Hung 48", open out "french door" style with 24" slabs and catch ball mechanism. Install Client's provided hardware. Fairchild will prep trim for Others to paint. POWER BATHROOM: Install Client provided vanity cabinet, hardware, trim elements/molding per selected unit. Install existing base and casing molding, if additional molding is needed Fairchild will source LKQ paint grade molding. Client's flooring service provider or Client is responsible for shoe molding and installation of the same. Fairchild will prep trim for Others to Paint. DINING ROOM: Install 5.0 double door (door orientation and details TBD) and charged at ACQUISITION COST to be ADDED once details affirmed by Client. Custom Stone/Solid Surface CUSTOM STONE: OTHERS - SPECIALIZED GRANITE KITCHEN: Install Client selected, fabricate stone per Client's direction to Specialized. Install specified undermount sink. MASTER BATHROOM: Install Client selected, fabricate stone per Client's direction to Specialized. Recommend stone backsplash for bathroom. Install specified undermount sinks. POWDER BATHROOM: Install Client selected, fabricate stone per Client's direction to Specialized. Recommend stone backsplash for bathroom. Install specified undermount sink. $0.00 1.0 $0.00 Tile Backsplash TILE BACKSPLASH:$0.00 1.0 $0.00 KITCHEN: Post Stone Installation Install Client Provided Tile and Grout in Kitchen Backsplash. Basic Tile Installation Pricing: Tile Pricing is Based Upon Basic Tile Installation: uniform size of tile and color (does not include white tile and black grout or other material color differences in tile and grout. Up to 1 accent tile. Custom Remodel Finishing CUSTOM REMODEL FINISHING: KITCHEN: Install exhaust hood Install finish trim on recessed lights. Install Client provided hanging lights. Routine Finishing: targeted repairs, sealing, etc. MASTER BATHROOM: Install Client provided accessories: Mirrors Towel Holders and Hooks Paper Holder Install finishes on exhaust fans and recessed light trim. Install Client provided sconce lights. Routine Finishing: targeted repairs, sealing, etc. POWDER BATHROOM: Install Client provided sconce light. Install Client Provided Accessories: Mirror Towel Holder and Hooks Paper Holder Routine Finishing: targeted repairs, sealing, etc. $0.00 1.0 $0.00 Electrical Finish Electrical Finish, Remodeling SCOPE: Lic. Electrician KITCHEN: Install devices: switches, receptacles, covers. Install wips on disposal and dishwasher Install wall mounted oven MASTER BATHROOM: Install devices: switches and receptacles, covers. $0.00 1.0 $0.00 Plumbing Finish Plumbing: Remodeling Finish SCOPE: Lic. Plumber KITCHEN: Install Client provided faucet and strainer for kitchen sink, as well as Client provided Disposal. Install Client provided dishwasher. Install Client provided cooktop. Install Client provided Fridge. MASTER BATHROOM: Install Client provided Shower Trim Kit, Shower Arm, and Head. Install Client provided Toilet. Install Clients Provided Faucets for double vanity POWDER BATHROOM: Install Client provided Toilet. Install Client provided faucet for single sink vanity. $0.00 1.0 $0.00 Custom Shower Door CUSTOM SHOWER DOOR/ENCLOSURE Referred Direct to North Side Glass $0.00 1.0 $0.00 Others to fabricate and install door/enclosure per Client's direction. Remodel Phase Approval Phase III: Reconstruction, Initial Completion and Final Completion Upon Client's approval of Phase II, and Permit Approval, Fairchild will initiate the Reconstruction Phase. Fairchild will complete approximately 90% of the Reconstruction Phase (at our discretion) and will STOP. Client and Fairchild will inspect the completed work for feedback from the Client on issues of "Fit and Finish", as all of other work has been approved. Client and Fairchild will agree upon any "Punch List/Fit and Finish" repairs to be completed, within the scope of the original Project Plan and Estimate. $0.00 1.0 $0.00 Punch List Remodel PUNCH LIST REMODEL: Fairchild will complete the Reconstruction Phase, as well as any "Punch List" repairs. $0.00 1.0 $0.00 Certificate of Completion CERTIFICATE OF COMPLETION: Client and Fairchild will conduct a final walk through and if applicable, Client and Fairchild will agree upon any final "Punch List" repairs and complete the same for Client's final approval. Upon Client's final approval, Fairchild will: Remove all property preservation measures, working from the master bathroom to the egress. Fairchild will performing a cursory, construction grade cleaning of the project areas. See notes above about deep, post construction cleaning (which is NOT included in this estimate). Leave client with any remnant materials specific to Client's project, at the discretion of Fairchild. Remove all project related debris. FAIRCHILD WILL BE FINISHED AT THIS JUNCTION. CLIENT/CLIENT'S PAINTER WILL BE RESPONSIBLE FOR THE REMAINING PAINT SCOPE $0.00 1.0 $0.00 Permit Compliance PERMIT COMPLIANCE: Carmel: Certificate of Occupancy Fairchild will schedule and attend the inspection for the Certificate of Occupancy. $0.00 1.0 $0.00 Custom Remodel Budget CUSTOM REMODEL BUDGET: Good Faith Remodel Budget for the scope of work set forth in this estimate as of 8/17/21 and pending Client's finish materials selections and subject to Client's final design and direction. Minimum Known and Estimated Functional Materials, Labor, and Project Costs as of the date of the estimate. $88,643.00 1.0 $88,643.00 Terms & Conditions Remodeling TERMS & CONDITIONS REMODELING: #1. Please read the entire "Estimate" carefully and completely. #2. This is a good faith estimate of the repairs outlined. Please read the "Unforeseen Conditions Clause" on this document. #3. TERMS: A. A Deposit of 30% and a signed estimate are required to schedule B. 30% of the Estimate Total will be invoiced upon the completion of the Post Rough In Walk Through Inspection and Approval. C. 30% of the Estimate Total will be invoiced and collected before the Pre-Completion Walk Through. D. Full Balance will be due upon Completion. E. All invoices are Due Upon Receipt. Change Orders are $0.00 1.0 $0.00 due in full upon approval. F. Accepted payment methods: Cash, Check, or Credit Card* Credit Card Transactions over $1,000 are susceptible to the fee charged FPS, not to exceed 3.5% of the payment. #4. SCHEDULING: A. Exterior projects (elements of this project) are dependent upon the weather. B. Estimates Accepted, of this scale/scope, are being scheduled the week 9/27 C. Project, as known and estimated, WITHOUT TIME ALLOWANCE FOR OTHERS, is 45 business days. #5. IMPORTANT-INDIANA CONSUMER PROTECTION NOTICE! A. Client has a (3) three business day right of rescission from signed contract/estimate. Rescission notice shall be provided via email to marykris@fairchildrenovations.com. B. Project Contact: Mary Kris McWhinney Office: 317.432.6758 Email: marykris@fairchildrenovations.com C. Fairchild is a Licensed General Contractor. Fairchild employees will perform the general/majority of the known and estimated repairs, with isolated work performed by partner/subcontractors on a subcontract basis. Subcontractors work at the sole discretion and direction of Fairchild. Subtotal $89,031.00 Tax $0.00 Total $89,031.00 Total payments $5,000.00 Balance remaining $84,031.00 Notes UNFORESEEN CONDITIONS CLAUSE: Estimates are provided in good faith and based upon a visual inspection. Issues may be discovered once work begins that alter the scope AND/OR cost of repairs. If there are material changes to the scope of repairs and/or changes to the cost of repairs, Fairchild will provide the client a written "Change Order" to document such changes and will require the client's formal approval. "Change Orders" are supplemental to the original estimate or contract, the stated "Terms and Conditions" in the original estimate remain in effect. ALERT: changes in the scope of repairs will likely alter the estimated days of completion and a revised date of completion. We reserve the right to decline repairs outside of the original estimate/scope. All efforts will be made to complete work on the agreed upon date(s). However, weather, scope changes, material availability, and other challenges may affect deadlines. ESTIMATE APPROVAL: PLEASE READ THE ESTIMATE CAREFULLY! Your signature or on-line approval/acceptance affirms the above prices, specifications, and conditions are satisfactory and are hereby accepted. Your acceptance authorizes Fairchild Property Services to do the work as specified and payment will be made as agreed upon. Terms PAYMENT IS DUE UPON COMPLETION OF WORK. Please make payment upon completion of work, unless other arrangements have been agreed upon at the time of acceptance of our estimate. Invoices not Paid in Full within 10 days from the date of the invoice will be charged 3% interest per month until paid in full. As a courtesy to our clients, we accept most major credit cards for payment. Credit Card transactions are subject to a 3.5% fee. This is the fee Fairchild Renovations is charged by our service provider. Additional Notes Date Name Note