HomeMy WebLinkAboutL03.0I
TREES
QTY
BOTANICAL NAME
COMMON NAME
CONT
CAL
REMARKS
Bet-n
10
Betula nigra
River Birch I
B & B
min. 8� ht.
clump form, 3-5 stems
Gin-p
3
Ginkgo biloba Princeton Sentry'
Princeton Sent
�r z
V 0 o
Z
ao
H {N
W 0 _0
a
Q ct
Q
0
3
w 3
o —
0 0
J O
J �,
Ln
PLANTING DETAI
Consultant:
Remove all wire baskets, Remove tags and
twine and burlap. labels.
Before tree is in the hole, Prune only dead or
remove bottom of basket broken branches or
cutting horizontally. double leaders.
After tree is in the hole,
remove rest of basket Stake tree
cutting vertically.
if necessary.
Backfill using existing soil Remove excess soil
Water thoroughly to Certified by:
eliminate air pockets. to locate and expose
root flare.
Add 1-2 inches of"
hardwood mulch. Root flare should be ; ��`�SSTEP�PglE`"
1-2 inches above
Keep mulch 3 inches Q No. G
from trunk. finish grade. = 2020-0132 l
! SPATE OF ti
Finish grade. OSCgP.
EXPIRES 12-31-2021
�..V
LEAVE•UNDERROOT BALL
UNDISTURBED •SUPPORT
• , • ,UCE ,.,xTNERsy' C
o
`� E
�, U N
in 3 W - 0
0inL
N
c M
o
Z L V)
u 0
t
_J C
N U_
' I I I 0
PLA ETAI L I G
J
Remove any container Remove tags and Remove trunk wrap Remove tags and
or twine and burlap. labels. if necessary. labels. V)
v
Prune only dead or Remove all wire baskets, Prune only dead or
Backfill using existing soil. broken branches or twine and burlap. broken branches or
Water thoroughly to double leaders. double leaders.
eliminate air pockets. Before tree is in the hole,
CD
Remove excess soil remove bottom of basket Stake tree
cutting horizontally.
w Area to receive lawn Add 1 2 inches of to locate and expose After tree is in the hole, if necessary.
hardwood mulch. root flare. remove rest of basket
Area to receive native seeding - Keep mulch 3 inches cutting vertically.
Remove excess soil
Provide three families of seed from trunk. Root flare should be to locate and expose
1-2 inches above Backfill using existing soil. root flare.
based on elevation around pond. finish grade. Water thoroughly to
eliminate air pocket Root flare should be
0 Finish grade. 1-2 inches above
0
Add 1-2 inches of finish grade.
hardwood mulch.
Keep mulch 3 inches Finish grade.
Note: All perennial beds shall be planted �� from trunk.
using triangular planting scheme. � _ Shredded Hardwood Organic Mulch
c Place level with adjacent finish grades.
Refer to Planting Schedule for On Center w C� Refer to Special Provisions.
planting dimension. °
3" shredded hardwood bark mulch °
Existing grade. Adjacent sidewalk or curb, typ.
- CN
Remove container
III— ob No: 2018 12 62
—III Drawn by: app
12" prep reds ee p cifications — — — — — — — — — —I — — Topsoil, to include a min. of 5% organic matter • • • : • • • •
a oils s e ' III III III III III III III III III Checked by: app
Remove all stones I & larger andUNDISTURBED • , , • , , : • , , • ,
T IT
other extraneous materials. Refer to Special Provisions.
'-• , , ,UCE SETTLING. • , , ' These Drawings and Specifications, and all copies
e�TNBIo.- thereof are and shall remain the property and
.� copyright of the Landscape Architect. They shall
III III III III III III III Compacted subgrade _ be used onl with res ect to this Proect and are
Compacted subgrade - y p
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
PERENNIAL PLANTING LANDSCAPE BED PREPARATION '
Not to Scale Not to Scale TIMES1/2 2 TIMES ; • Sheet No:
L3
rLn
y
r&%VP <
y
a
o
�
O
O
U
�
U
o�
�N
;v
N
N
N
N
�
0
O
M
0
0
0
a�