HomeMy WebLinkAboutC16 UTILITY PLAN CENTERSHELBORNE ROADPROPOSED BUILDING
FFE: 916.60'
FPG:916.10'
LAG: 915.10'UTILITY EASEMENTUTILITY EASEMENTEXISTING FIRE HYDRANT
915
9
1
5
915915915915
915 915915916916915915914914915915915 914
914 913
9
1
5
913 9159139149139
1
4
9
1
3
91
2
912
915 914.60
912.82
915.36
914.26
TW 915.45
BW 911.60
TW 915.87
BW 910.52
TW 910.38BW 910.38
89 LF OF 12" RCP
@ 0.64%129 LF OF 18" RCP@ 0.46%118 LF OF 21" RCP
@ 0.25%56 LF OF 8" SDR 35 PVC@ 1.00%47 LF OF 6" SDR 3
5
P
V
C
@ 1.00%
3 LF OF 6" SDR 35 PVC
@ 1.00%
9 LF OF 6" SDR 35 PVC
@ 1.00%80 LF
OF
6"
SDR
35
PVC@ 2
.82%
41 LF OF 6" SDR 35 PVC
@ 4.33%
44 LF OF 6" SDR 35 PVC
@ 3.96%
90
L
F
O
F
6
"
SDR
3
5
PVC@
2
.
0
0%
77 LF OF 18" RCP
@ 0.33%
65 LF OF 6" SDR 35 PVC
@ 2.10%
17 LF OF 6" SDR 35 PVC
@ 1.71%
60 LF OF 6" SDR 35 PVC
@ 0.83%
18 LF OF 6" SDR 35 PVC
@ 1.13%
STR. 13
Type C MH / R-3286-8V
TR: 914.50
INV(NE): 909.20
INV(S): 909.10
INV(SE): 909.20
INV(NE): 909.20
INV(NW): 909.20
STR. 14
Type C MH / R-3472
TR: 914.06
INV(E): 909.88
INV(SW): 909.79
INV(SE): 909.60
INV(E): 909.80
STR. 15
Type C MH / R-3472
TR: 914.13
INV(W): 910.45
INV(S): 910.40
STR. MH-ILC2
48 SANITARY MANHOLE
TR: 914.44
INV(N): 906.64
INV(S): 906.53
STR. RD06
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.96
STR. RD05
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.96
PIV
WATER TEE
WATER TEE
45 Degree Bend
Fire Department Connnection
FIRE HYDRANT ASSEMBLY
FIRE HYDRANT ASSEMBLY
Refer to MEP Plan for Connection to
Building
INV: 910.96
Refer to MEP Plan for Connection to
Building
INV: 910.96
Refer to MEP Plan for Connection to
Building
INV: 910.96
STR. RD2.3
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.96
STR. RD02.2
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.96
STR. RD01
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.96
STR. RD03
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:912.96
STR. RD04.2
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:912.96
STR. RD04.3
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:912.96
STR. 3.4
SAN C/O. TYPE 3. Refer to MEP Plan
for Connection to Building
INV(SW): 911.60
STR. CES 2
18" CES
TR: 917.86
INV(N): 912.82
STR. CES 3
18" CES
TR: 917.46
INV(S): 912.56
STR. RD08
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.30
STR. RD07
ROOF DRAIN CONNECT TO
DOWNSPOUT BOOT[SEE DETAIL-C22]
INV:910.60
STR. SP01
Cleanout. Refer to MEP Plan for
Connection to Building and Backflow
Preventer
INV(S): 913.00
TEE Water
45 Bend Water
45 Bend Water
STR. MH-ILC3
48 SANITARY DROP MANHOLE
TR: 915.90
INV(N): 911.29
INV(S): 907.20
INV(NE): 910.53
STR. 3.2
SAN C/O. TYPE 3
TR: 911.64
INV(E): 911.09
INV(W): 911.09
STR. 13.1
24'' ADS2824 Basin / ADS 2499CGS
TR: 913.91
INV(SE): 910.41
17 LF OF 12" RCP
@ 6.95%
S4
D3
D3
D3
W3
W3
W3
W2
W1
XD
XE
D5
W4
G1
G2
W5
D1
S1
W6
S2
S2
S2
S3
PLOT SCALE: 1:1 EDIT DATE: 8/11/21 - 10:02 AM EDITED BY: MJACKSON DRAWING FILE: Z:\PROJECTS\2020\0113 - ISLAMIC LIFE CENTER\2. DESIGN\CAD\C15 UTILITY PLAN SOUTH.DWGPRINT DATE: 8/11/21GENERAL NOTES
PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST
THE LAW TO EXCAVATE WITHOUT NOTIFYING THE
UNDERGROUND LOCATION SERVICE TWO (2)
WORKING DAYS BEFORE COMMENCING WORK.
KEYNOTES
BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION
PROVIDED BY CENTRAL STATES CONSULTING,LLC. PROJECT
NUMBER 20-043, DATED 06/07/2020.
C16
UTILITY PLAN
CENTER ISLAMIC LIFE CENTER14120 Shelborne Road, Carmel IN 46074Al Salam FoundationBENCHMARK DATA
DRAWN BY:CHECKED BY:TMJ 6280 N. Shadeland Avenue, Suite AIndianapolis, IN 46220Phone: (317) 598-6647 | www.theveridusgroup.comPROJECT NO.: 2020.0113
LEE 4 RESET ELEVATION 910.53 (NAVD 88)
A DNR TABLET FOUND IN TOP OF THE CONCRETE POST 15.3 FEET EAST OF
THE CENTERLINE OF SHELBORNE ROAD AND 1500 FEET SOUTH OF THE
ORIGINAL CENTERLINE OF 146TH STREET.
CSC TBM #156 ELEVATION 912.83
A 5/8" CAPPED REBAR SET ±12 FEET EAST OF THE CENTERLINE OF
SHELBORNE ROAD, ALSO ±760 FEET NORTH OF THE CENTERLINE OF 141ST
STREET.
CSC TBM #151 ELEVATION 912.59
A MAGNAIL WITH WASHER STAMPED "TSC CPT" FOUND AT THE END OF AN
ASPHALT PATH, ALSO ±335 FEET WEST OF THE CENTERLINE OF SHELBORNE
ROAD, ALSO ±25 FEET NORTH OF THE CENTERLINE OF 141ST STREET.
MWJ
DRAINAGE
D1. UNDERDRAIN (SEE DETAIL)
D2. EXPOSED ROCK DITCH @ 0.5% (SEE DETAIL)
D3. PAVEMENT UNDERDRAIN(SEE DETAIL)
D4. POND TO BE NATURALIZED PER CITY OF CARMEL
STANDARDS. REFER TO LANDSCAPE PLANS FOR DETAILS.
D5. DRAINAGE AND BMP EASEMENT PER CITY OF CARMEL
STANDARDS.
CROSSING
XA.SEE UTILITY DETAILS FOR CROSSING UTILITY TABLE
XB.SEE UTILITY DETAILS FOR CROSSING UTILITY TABLE
XC.SEE UTILITY DETAILS FOR CROSSING UTILITY TABLE
XD.SEE UTILITY DETAILS FOR CROSSING UTILITY TABLE
XE.SEE UTILITY DETAILS FOR CROSSING UTILITY TABLE
WATER
W1. 6" FIRE PROTECTION WATERLINE
W2. 2" DOMESTIC WATERLINE
W3. 6" FIRE HYDRANT WATERLINE
W4. WET TAP
W5. WATER METER INSIDE BUILDING. REFER TO MEP
PLAN
W6.WATER VALVE
GAS
G1.PROPOSED 6" GAS LINE TO CONNECT TO GAS MAIN
AT 141 ST. REFER TO MEP PLAN TO CONNECTION TO
BUILDING.
G2. GAS METER AND REGULATOR. REFER TO MEP PLANS
FOR DETAILS
SANITARY
S1.PROPOSED 1500 GALLON GREASE TRAP. REFER TO
MEP PLANS FOR CONNECTION TO BUILDING.
S2.ALL SEWER UNDER PAVEMENT WILL NEED TO BE FULL
DEPTH GRANULAR.
S3.DROP MANHOLE(SEE DETAIL)
S4.PROPOSED 24" SAMPLE PORT(SEE DETAIL)
0'30'60'
SCALE: 1"=30'
ILC DRAINAGE SUMMARY
Existing Conditions Proposed Conditions
Area(AC)CN
10-Yr
Allowable
Discharge(cfs)
100 Yr Allowable
Dischage(cfs)Area(AC)CN
10-Yr
Discharge(cfs)
10-Yr Required
Detention(CF)
100- Yr
Discharge(cfs)
100-Yr Required
Detention(CF)
Detention
Provided (CF)
Ex Southeast Basin Sheet
Flow(E1)1.88 85
0.38 1.14
32,644 62,073 97,580
Ex. South Basin Depresssion (E2)1.4 85
Throughfare Plan (E3)0.52 91
Proposed South(P1)4.83 87 21.04 40.42
Proposed Throughfare(P2)0.523 91 1.86 3.4
Offsite Southeast(P3)0.974 85 2.45 4.95
Offsite South(P4)0.646 84 1.73 3.54
Total*3.803 0.38 1.14 6.973 27.08 52.31
Total After Storm Routing
Without Offsite**0.37**1.14**
Total After Storm Routing With
Offsite***2.09***4.56***
*Discharge from the site following storm routing.
**Discharge from the site following storm routing and detention not including offsite
***Discharge from the site following storm routing and detention including offsite.
UTILITY LEGEND
WATER LINE
TELEPHONE LINE
ELECTRIC LINE
GAS LINE
VALVE
WATER METER PIT
SANITARY SEWER LINE
HYDRANT
STORM SEWER LINE
ROOF DRAIN
CLEANOUT
(STORM & SANITARY)