Loading...
HomeMy WebLinkAboutC23.0 EMERGENCY FLOOD ROUTING CENTERSHELBORNE ROADPROPOSED BUILDING FFE: 916.60' FPG:916.10' LAG: 916.06'UTILITY EASEMENTUTILITY EASEMENTTR: 914.19' FLOOD ELEV: ±914.43'TR: 914.01' FLOOD ELEV: ±914.96'TR: 914.14' FLOOD ELEV: ±914.96' TR: 914.49 FLOOD ELEV: ±915.03' TR: 914.06' FLOOD ELEV: ±915.06'TR: 914.13' FLOOD ELEV: ±915.06' TR: 914.10' FLOOD ELEV: ±914.91'PLOT SCALE: 1:1 EDIT DATE: 8/30/21 - 5:55 PM EDITED BY: MJACKSON DRAWING FILE: Z:\PROJECTS\2020\0113 - ISLAMIC LIFE CENTER\2. DESIGN\CAD\EMERGENCY FLOOD ROUTING CENTER.DWGPRINT DATE: 8/31/210' GENERAL NOTES PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. 1.IT SHALL BE THE SUBCONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO THE PHASE OF WORK. IT SHALL ALSO BE THE SUBCONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR PROPER STAKE LOCATION OF EACH UTILITY BEFORE WORK IS STARTED. EACH SUBCONTRACTOR SHALL NOTIFY THE OWNER AND ENGINEER OF ANY CHANGES, OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN FIELD BEFORE WORK IS STARTED OR RESUMED. 2.ALL MATERIALS AND CONSTRUCTION FOR SANITARY SEWERS SHALL BE IN ACCORDANCE WITH THE LOCAL AUTHORITY STANDARDS AND SPECIFICATIONS. 3.ALL MATERIALS AND CONSTRUCTION FOR STORM SEWERS SHALL BE IN ACCORDANCE WITH THE LOCAL AUTHORITY STANDARDS AND SPECIFICATIONS. 4.ALL MATERIALS AND CONSTRUCTION FOR WATER MAINS SHALL BE IN ACCORDANCE WITH THE LOCAL AUTHORITY STANDARDS AND SPECIFICATIONS. 5.ANY PART OF THE SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVED AREAS TO BE BACKFILLED WITH COMPACTED GRANULAR MATERIAL. 6.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 7.ANY WATER MAINS TO HAVE 54" MINIMUM COVER OVER TOP OF PIPE. 8.WATER SERVICE LINE TO THE BUILDING SHALL HAVE A SHUT-OFF VALVE IN AN ACCESSIBLE LOCATION OUTSIDE OF THE BUILDING. (APPLIES TO COMMERCIAL ONLY) 9.STERILIZATION OF WATER MAIN SHALL BE IN ACCORDANCE WITH STATE BOARD OF HEALTH. 10.ALL UTILITY CROSSING AND CLEARANCES TO BE IN CONFORMANCE WITH THE REQUIREMENTS OF THE INDIANA STATE BOARD OF HEALTH. 11.IF EXISTING FIELD TILES ARE ENCOUNTERED DURING CONSTRUCTION THEY ARE TO BE TIED INTO THE PROPOSED STORM SEWER SYSTEM. KEYNOTES 20'40' SCALE: 1"=20' BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION PROVIDED BY CENTRAL STATES CONSULTING,LLC. PROJECT NUMBER 20-043, DATED 06/07/2020. C23 EMERGENCY FLOOD ROUTING CENTER ISLAMIC LIFE CENTER14120 Shelborne Road, Carmel IN 46074Al Salam FoundationBENCHMARK DATA DRAWN BY:CHECKED BY:TMJ 6280 N. Shadeland Avenue, Suite AIndianapolis, IN 46220Phone: (317) 598-6647 | www.theveridusgroup.comPROJECT NO.: 2020.0113 LEE 4 RESET ELEVATION 910.53 (NAVD 88) A DNR TABLET FOUND IN TOP OF THE CONCRETE POST 15.3 FEET EAST OF THE CENTERLINE OF SHELBORNE ROAD AND 1500 FEET SOUTH OF THE ORIGINAL CENTERLINE OF 146TH STREET. CSC TBM #156 ELEVATION 912.83 A 5/8" CAPPED REBAR SET ±12 FEET EAST OF THE CENTERLINE OF SHELBORNE ROAD, ALSO ±760 FEET NORTH OF THE CENTERLINE OF 141ST STREET. CSC TBM #151 ELEVATION 912.59 A MAGNAIL WITH WASHER STAMPED "TSC CPT" FOUND AT THE END OF AN ASPHALT PATH, ALSO ±335 FEET WEST OF THE CENTERLINE OF SHELBORNE ROAD, ALSO ±25 FEET NORTH OF THE CENTERLINE OF 141ST STREET. MWJ EXISTING LEGEND LEGEND: C. O. EMERGENCY FLOOD ROUTING LEGEND EMERGENCY FLOOD AREA OVERFLOW ROUTE DIRECTION