HomeMy WebLinkAboutC23.0 EMERGENCY FLOOD ROUTING CENTERSHELBORNE ROADPROPOSED BUILDING
FFE: 916.60'
FPG:916.10'
LAG: 916.06'UTILITY EASEMENTUTILITY EASEMENTTR: 914.19'
FLOOD ELEV: ±914.43'TR: 914.01'
FLOOD ELEV: ±914.96'TR: 914.14'
FLOOD ELEV: ±914.96'
TR: 914.49
FLOOD ELEV: ±915.03'
TR: 914.06'
FLOOD ELEV: ±915.06'TR: 914.13'
FLOOD ELEV: ±915.06'
TR: 914.10'
FLOOD ELEV: ±914.91'PLOT SCALE: 1:1 EDIT DATE: 8/30/21 - 5:55 PM EDITED BY: MJACKSON DRAWING FILE: Z:\PROJECTS\2020\0113 - ISLAMIC LIFE CENTER\2. DESIGN\CAD\EMERGENCY FLOOD ROUTING CENTER.DWGPRINT DATE: 8/31/210'
GENERAL NOTES
PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST
THE LAW TO EXCAVATE WITHOUT NOTIFYING THE
UNDERGROUND LOCATION SERVICE TWO (2)
WORKING DAYS BEFORE COMMENCING WORK.
1.IT SHALL BE THE SUBCONTRACTOR'S RESPONSIBILITY TO VERIFY ALL
EXISTING UTILITIES AND CONDITIONS PERTAINING TO THE PHASE OF
WORK. IT SHALL ALSO BE THE SUBCONTRACTOR'S RESPONSIBILITY
TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR PROPER
STAKE LOCATION OF EACH UTILITY BEFORE WORK IS STARTED. EACH
SUBCONTRACTOR SHALL NOTIFY THE OWNER AND ENGINEER OF ANY
CHANGES, OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN
FIELD BEFORE WORK IS STARTED OR RESUMED.
2.ALL MATERIALS AND CONSTRUCTION FOR SANITARY SEWERS SHALL
BE IN ACCORDANCE WITH THE LOCAL AUTHORITY STANDARDS AND
SPECIFICATIONS.
3.ALL MATERIALS AND CONSTRUCTION FOR STORM SEWERS SHALL BE
IN ACCORDANCE WITH THE LOCAL AUTHORITY STANDARDS AND
SPECIFICATIONS.
4.ALL MATERIALS AND CONSTRUCTION FOR WATER MAINS SHALL BE IN
ACCORDANCE WITH THE LOCAL AUTHORITY STANDARDS AND
SPECIFICATIONS.
5.ANY PART OF THE SANITARY OR STORM SEWER TRENCHES RUNNING
UNDER OR WITHIN 5' OF PAVED AREAS TO BE BACKFILLED WITH
COMPACTED GRANULAR MATERIAL.
6.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO
CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS.
7.ANY WATER MAINS TO HAVE 54" MINIMUM COVER OVER TOP OF
PIPE.
8.WATER SERVICE LINE TO THE BUILDING SHALL HAVE A SHUT-OFF
VALVE IN AN ACCESSIBLE LOCATION OUTSIDE OF THE BUILDING.
(APPLIES TO COMMERCIAL ONLY)
9.STERILIZATION OF WATER MAIN SHALL BE IN ACCORDANCE WITH
STATE BOARD OF HEALTH.
10.ALL UTILITY CROSSING AND CLEARANCES TO BE IN CONFORMANCE
WITH THE REQUIREMENTS OF THE INDIANA STATE BOARD OF
HEALTH.
11.IF EXISTING FIELD TILES ARE ENCOUNTERED DURING CONSTRUCTION
THEY ARE TO BE TIED INTO THE PROPOSED STORM SEWER SYSTEM.
KEYNOTES
20'40'
SCALE: 1"=20'
BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION
PROVIDED BY CENTRAL STATES CONSULTING,LLC. PROJECT
NUMBER 20-043, DATED 06/07/2020.
C23
EMERGENCY
FLOOD ROUTING
CENTER ISLAMIC LIFE CENTER14120 Shelborne Road, Carmel IN 46074Al Salam FoundationBENCHMARK DATA
DRAWN BY:CHECKED BY:TMJ 6280 N. Shadeland Avenue, Suite AIndianapolis, IN 46220Phone: (317) 598-6647 | www.theveridusgroup.comPROJECT NO.: 2020.0113
LEE 4 RESET ELEVATION 910.53 (NAVD 88)
A DNR TABLET FOUND IN TOP OF THE CONCRETE POST 15.3 FEET EAST OF
THE CENTERLINE OF SHELBORNE ROAD AND 1500 FEET SOUTH OF THE
ORIGINAL CENTERLINE OF 146TH STREET.
CSC TBM #156 ELEVATION 912.83
A 5/8" CAPPED REBAR SET ±12 FEET EAST OF THE CENTERLINE OF
SHELBORNE ROAD, ALSO ±760 FEET NORTH OF THE CENTERLINE OF 141ST
STREET.
CSC TBM #151 ELEVATION 912.59
A MAGNAIL WITH WASHER STAMPED "TSC CPT" FOUND AT THE END OF AN
ASPHALT PATH, ALSO ±335 FEET WEST OF THE CENTERLINE OF SHELBORNE
ROAD, ALSO ±25 FEET NORTH OF THE CENTERLINE OF 141ST STREET.
MWJ
EXISTING LEGEND
LEGEND:
C. O.
EMERGENCY FLOOD
ROUTING LEGEND
EMERGENCY FLOOD AREA
OVERFLOW ROUTE DIRECTION