Loading...
HomeMy WebLinkAboutC25.0 EROSION CONTROL PLAN NORTHSHELBORNE ROADERERERERERERPLOT SCALE: 1:1 EDIT DATE: 12/28/20 - 10:16 AM EDITED BY: LCASTRODIAZ DRAWING FILE: Z:\PROJECTS\2020\0113 - ISLAMIC LIFE CENTER\2. DESIGN\CAD\C23 EROSION CONTROL PLAN BIKE NORTH.DWGPRINT DATE: 1/8/21GENERAL NOTES PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. 20'40' SCALE: 1"=20' BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION PROVIDED BY CENTRAL STATES CONSULTING,LLC. PROJECT NUMBER 20-043, DATED 06/07/2020. C25 EROSION CONTROL PLAN NORTH EROSION CONTROL LEGEND ISLAMIC LIFE CENTER14138 Shelborne Road, Carmel IN 46074Al Salam FoundationBENCHMARK DATA DRAWN BY:CHECKED BY:TMJ 6280 N. Shadeland Avenue, Suite AIndianapolis, IN 46220Phone: (317) 598-6647 | www.theveridusgroup.comPROJECT NO.: 2020.0113 LEE 4 RESET ELEVATION 910.53 (NAVD 88) A DNR TABLET FOUND IN TOP OF THE CONCRETE POST 15.3 FEET EAST OF THE CENTERLINE OF SHELBORNE ROAD AND 1500 FEET SOUTH OF THE ORIGINAL CENTERLINE OF 146TH STREET. CSC TBM #156 ELEVATION 912.83 A 5/8" CAPPED REBAR SET ±12 FEET EAST OF THE CENTERLINE OF SHELBORNE ROAD, ALSO ±760 FEET NORTH OF THE CENTERLINE OF 141ST STREET. CSC TBM #151 ELEVATION 912.59 A MAGNAIL WITH WASHER STAMPED "TSC CPT" FOUND AT THE END OF AN ASPHALT PATH, ALSO ±335 FEET WEST OF THE CENTERLINE OF SHELBORNE ROAD, ALSO ±25 FEET NORTH OF THE CENTERLINE OF 141ST STREET. MWJ EXISTING LEGEND LEGEND: C. O. 1.LAND ALTERATIONS WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. 2.CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 3.THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 5.SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6.WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 7.SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 8.SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND RE-DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 9.IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10.ALL EXISTING STRUCTURES, FENCING TREES AND ETC. WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON SITE. 11.THE SITE IS NOT LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA AS INDICATED ON THE FLOOD INSURANCE RATE MAP FOR HAMILTON COUNTY, INDIANA PANEL 18057C0205G DATED 11/19/2014. 12.SCHEDULE OF EARTHWORK ACTIVITIES: A.THE DURATION OF THE TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS WHEN ACTIVITY CEASES FOR MORE THAN 14 DAYS OR AS DIRECTED BY THE ENGINEER. B.TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. C.STOCKPILES SHALL BE LOCATED AS SHOWN. STOCKPILES SHALL HAVE SILT FENCE AROUND THE PERIMETER AND BE SEEDED IF IT IS UNDISTURBED FOR MORE THAN 14 CONSECUTIVE DAYS. 13.ANY OFFSITE BORROW AND/OR WASTE SITES THAT ARE NEEDED SHALL BE PERMITTED AS PART OF THIS PERMIT OR BE PART OF AN EXISTING PERMIT. 668 EXISTING CONTOUR PROPOSED CONTOUR CONSTRUCTION LIMITS CONSTRUCTION FENCE INLET PROTECTION CONCRETE WASHOUT AREA PORT-O-LET LOCATION TEMPORARY MATERIAL STORAGE AREA TEMPORARY TRASH STORAGE AREA TEMPORARY SOIL STORAGE AREA AREA SUBJECT TO TEMPORARY SEEDING DURING CONSTRUCTION AND PERMANENT SEEDING AND / OR VEGETATION AFTER CONSTRUCTION. REFER TO NOTES ON SHEET C010 FOR GENERAL APPLICABILITY. REFER TO LANDSCAPE ARCHITECT FOR SEEDING REQUIREMENTS. EROSION CONTROL GROUND COVER AS APPROVED BY THE ENGINEER GRAVEL CONSTRUCTION ENTRANCE OUTLET PROTECTION (10' LENGTH) HYDROLOGIC SOIL GROUP BOUNDARY YbvA Brookston Silty Clay YclA Crosby Silt Loam EROSION ROLL RIP-RAP TO REMAIN