HomeMy WebLinkAboutA00 Cover Sheet & Life Safety PlansNORTH ti
5TOKAG
137 5F
105 5F/2nro
S�[Z-
LO—
hind
o
KI CH N
552 F/2 0=3
k p
rl
U
Dmp
50UT
5T AC
24 5F
LIFE 5AFETY LEGEND
Line & direction of travel distance
EXIT
Exit sign location (coord. w/reflected
ceiling & electrical/light fixture plans)
223
33.5"/.15
Egreoo Capacity (over width divided by
factor)
LIFE
5AFETY NOTES
All means of egress shall be Accessible.
All exits shall have paved paths to the public
right-of-way.
Maximum allowable exit access travel distance i5
250 feet for a fully Sprinklered building per 2015
IBC, Table 1017.2.
Fire alarm detection and notification system will
be provided in accordance with International
Building Code, Indiana 5uilding Code and NFPA-72
requirements.
Smoke detection with Shut down of mechanical
5yotem5 will be provided.
Audio/visual notification devices will be provided
throughout the facility.
1
03
MULTI12URI205E
j GYMNASIUM
4,888 5F/15=326 persons
unconcentrated assembly
(tables & chairs)
drop -down gym partition
0
L (when partition iS down, each side
i5 2,444 5F/15=163 persons)
�1
16,E ,P bra
60o (half
I
I
PROJECT & CODE INFORMATION
506
767.15
0
NORTH VESTIBULE
126 5F
NORTH 5TAIR I 5TR00M
EXIT 163 SF 190 SF
21iv on ME
290 J,5 w o � en° D LpDU
58"/.20 �— — — 1 S F
FE ABC NORTH CORRIDOR
381 5F
drinking fountain
/
(high) /
OFFICE I MEN'
126 5F/100= I 5HOE5
2 persons 280 5F
CENTRAL SITTING
AREA
CORRIDOR 116 5F/15= <\ct
120 5F 8 persons \
95 5 erimet Area
/ of u or pra
to de rows)
E5TR00 \ \
lav & 1 we CP1yN 00 \ \
62 6 197 7=16 sons \
ncen. a5 bly w/out its
98 5 t area /
ELEVATOR
drinking fountain /
SOUTH GORRIDO WOMEN'5
1 FE-ABC 372 5F /\ 5HOE5
290 �Et� °� Y 36 SF
SOUTH VESTIBULE
126 5F
Contractors Shall construct this project in compliance with all
applicable codes adopted & amended by the State of Indiana based
on the International Building Code (IBC) & the City of Carmel including:
2014 Indiana Building Code (2012 IBC with Indiana amendments)
Accessibile & Usable Buildings & Facilitie5 AN51 IGG 117.1-2009
2012 Indiana Plumbing Code (2006 IFC with Indiana amendments)
2009 Indiana Electrical Code (2008 NEC with Indiana amendments)
2014 Indiana Mechanical Code (2012 IMC with Indiana amendments)
2010 Indiana Energy Conservation Code (A5HRAE 90.1, 2007 ammend.)
Automated People Mover, Farts 1-3 AN51/A5CE/T & DI 21-08 ammend.
2014 Indiana Fire Code (2012 International Fire Code)
Use Group: A-3 Religious Assembly
Type of Construction: 2B Unprotected
Structural Risk (IBC Table 1604.5): Category III (3)
Sprinkler 5yotem: Fully Sprinkled
GROSS BUILDING AREAS
Upper Level 13,640 5F
Lower Level 5,925 5F
Total Gross Finished Area 19,565 5F
Net Prayer Areas (Prayer Hall & Crying Room): 2,439 5F
Calculated Occupant Load: 2,439/7+1=350 peroomo
FLUMBING FIXTURE CALCULATIONS
Due to religious & cultural reaoon5, Mu51im men do not use urinals.
No water closet Subotitution5 have been considered (2006 IPC 419.2).
Calculations per IBC Table 2902.1 (A-3 Religious Place of Worship)
& Galc. Occupant Load of 350 persons Required Provided
Male Water Closets 175/150 = 2 5
Female Water Closets 175/75 = 3 5
Family Restroom Water Closets 0 1
Total Water CloSetS 5 11
Male Lavatories 175/200 = 1 3
Female Lavatories 175/200 = 1 3
Family Restroom Lavatories 0 1
Total Lavatories 2 7
Drinking Fountains (Water Goolers) 350/1000 = 1 4
Service (Mop) Sinks 1 3
FIRE EXTINGUISHER TYFE5
• FE-ABC - 5tandard ABC (Throughout Building)
Multipurpose Dry -Chemical Type: UL-Rated 2.5 Gal. (9.5 L) nominal
capacity, with monoammonium phosphate -based dry chemical in
manufacturer's standard enameled container. (In accordance with NFPA
10, Standard for Portable Fire ExtinguiSherS)
• FE-K - Type K (Kitchen)
Wet -Chemical Type: UL-Rated 2-A:1-13:C:K, 2.5 Gal. (9.5 L) nominal
capacity, with potassium acetate based chemical in 5tairnle55-steel
container, with preooure-indicating gauge. (In accordance with NFPA 10,
5tandard for Portable Fire ExtinguiSherS)
506
767.15
—JANIT01�
16 5F wlmop (sink
\�T
Al Salam Foundation PROJECT DE5CRIFTION
This project includes the construction of a new religious assembly
building for the AI 5alam Foundation in Carmel Indiana. The major
spaces include a Prayer Hall, Multipurpose Gymnasium, and
Classrooms. Occupancy is less than 350 persons based on the
Prayer Hall and Crying Room. The Multipurpose Gymnasium,
11 F Fj T
SLAMIC --I E C N ER Restrooms, Goat/Shoe Rooms, Office, Sitting Area, and Classrooms
are all accessory to the religious assembly use. Site development
5TOKAGE 14120 Shelborne Road Carmel IN 46074 includes drives to both adjacent streets, parking lot, dumpster
enclosure, and paved multiuse paths along each street.
13 5F
6'
this additional exit is for security
purposes and while not required,
also treated as a means of egress
\
X
ER LL��
5F/ -334 p ono
ntrate 55emb
t t fixed ato
672 net a )
345 perir�a a
not us for pr
c, o tide rows)
/
I
u this additional exit i5 for Security
purpo5eo and while not required,
also treated aS a means of egreoo
Th Calculated Occupant Load is based
1 ximum Occupancy of defined Prayer Areas
in the Prayer Hall and Crying Room
(all other spaces are accessory uses)
'PER LEVEL
LIFE SAFETY PLAN
Scale: 3/32"=l'-0" (1:128)
49.9,5
NORTH Qiel
W E
5
5TOKAGE
17 GC
MECH
56 5F
All spaces on the lower level
are accessory to the religious assembly
spaces on the upper level.
WER LEVEL
LIFE SAFETY PL.A
Scale: 3/32"=l'-0" (1:128)
REV1510N5
1/11/2021 - Construction Drawings replace all previous drawing sets and
are being issues for plan review and bidding.
3/17/2021 - Construction Drawings (also sometimes labelled Permit
Set): All sheets have been revised to comply with Carmel's Technical
Advisory Committee (TAG) requests and are being reissued for
additional plan review and bidding.
4/20/2021 - The Construction Drawings were revised to move the
structural specifications to the Project Manual. Thus all the
structural drawings were renumbered. The design did not change and
the date on the drawings have not been changed.
12ER5tECTIVE VIEW5
N0KTHWE5T
ADD ALTERNATES
ONE - North & South Entry Canopies: Work includes the barrel vaulted
roof, brick end wall with arches, and associated work. If not executed,
base bid shall include awnings over North & South Entry Doors.
TWO - Minaret w/lightning protection: Work includes the top, alum.
portion of minaret & assoc. work. If not executed, base bid shall
include metal coping cap over brick pier termination above dome roof.
THREE - Finishing of Lower Level: Work includes all fitup & finishing of
the Lower Level. If not executed, base bid to leave plumbing rough -ins
& lower level unfinished.
FOUR - Bullet Resistant Glazing: Replace portions of glazing in Prayer
Hall to be Bullet Resistant.
FIVE - Kitchen & Multipurpose Room Flnishes: Work includes all
Kitchen & Pantry cabinets and equipment. Rough -ins to be included in
base bid. All sports equipment and finishing in the Multipurpose Room
to also be included. Base bid to include all doors, electrical & HVAC.
GENERAL NOTES
This project has been designed exclusively for the AI Salim Foundation
and iS to be built at the listed address. Any reproduction of any
part of this design for another project is prohibited.
The Contractor Shall be responsible for obtaining clarification from the
Con5ultant(5) before continuing construction if there are any
di5crepancie5 within the drawings.
Do not Scale drawings. Written dimensions take precedence over Scaled
dimen5ion5. The Contractor(5) must verify all dimen5ion5 in the field.
Notify the architect of any di5crepancie5. "FV" meon5 "field verify".
Fluo or minus (+/-) indicates dimen5ion5 to be adjusted in the field
according to the conditions. Verify with the Consultant. Dimensions
are to face of masonry, face of Stud, centerline of Structure, face of
concrete, or centerline of opening (or door/window unit).
All drawings, Specifications, computer files, reports, field data, notes,
and other documents and instruments prepared by the Consultant(S)
as instruments of Service Shall remain the property of the
Conoultant(s). The Consultant(5) Shall retain all common law,
5t9utory and other reserved rights, including the copyright thereto.
Not to Scale & for reference only (may not be accurate)
DRAWING SCHEDULE
Cover Sheet, General Notes, and Life Safety Plans
Civil:
Cl Civil Title Sheet & General Site Information
C2 Existing Topography South
C3 Existing Topography Center
C4 Existing Topography North
C5 Demolition Plan South
C6 Demolition Plan Center
C7 Demolition Plan North
G8 Site Plan South
C9 Site Plan Center
C10 Site Plan North
Cll Site Details
C12 Grading Plan South
C13 Grading Plan Center
C14 Grading Flan North
C15 Utility Plan South
C16 Utility Plan Center
C17 Utility Frofile5
C18 Utility Frofileo
C19 Utility Profiles
C20 Emergency Flood Routing South
C21 Emergency Flood Routing Center
C22 Utility Details
C23 Utility Details
C24 Utility Details
C25 Erosion Control South
C26 Erosion Control Center
C27 Erosion Control North
C28 Erosion Control Details
C29 Storm Water Pollution Protection Plan
Landscape:
L1 South Parcel Landscape Plan
L2 North Parcel Landscape Plan & Flirting Notes
L3 Planting Schedule & Details
L4 Concept Irrigation Plan
ce Irri ion tail
Structural:
51 General Notes
52 Exterior Isometric Views
53 Framing Isometric Views
54 Structural Grid Flan
55 Foundation Plan
56 Foundation Details
57 Foundation Details
58 Floor Framing Plan
59 Floor Framing Details
510 Low Roof Framing Plan
511 Roof Framing Details
512 Gym Roof & Wall Framing
515 Prayer Hall Roof
514 Canopy
rchl ctur
Al Upper Level Floor Plan
A2 Clerestory & Lower Level Floor Plan
A3 Upper Level Reflected Ceiling Flan
A4 Lower Level Reflected Ceiling & Canopy Piano
A5 Roof Plan
A6 Exterior Building Elevations
A7 Enlarged Exterior Elevations & Details
A8 Building 5ection5 & Detail5
A9 Building Sections & Details
A10 Stair & Elevator Section
All Prayer Hall Will Sections
Al2 Multipurpose Gym Wall Sections
A13 Room Finish, Door, & Window Schedules
A14 Kitchen & Cabinetry Interior Elevations
A15 Restroom & Wudu Interior Elevations
A16 Prayer Hall Interior Elevations
A17 Multipurpose Gym Interior Elevations
Mechanical, Electrical, & Plumbing:
SU1 Site Utilities Plan
ME1 Mechanical & Electrical Legends
ME2 Mechanical & Electrical Legends
M1 Upper Level Mechanical Flan
M2 Lower Level Mechanical Plan
M3 Roof Mechanical Plan
M4 Mechanical Schedules
M5 Mechanical Details
F1 Upper Level Fire Protection Plan
F2 Lower Level Fire Protection Plan
F3 Fire Protection 5chedule5 & Details
F1 Upper Level Plumbing Waste Plan
F2 Lower Level Plumbing Waste Plan
P3 Roof Plumbing Plan
F4 Upper Level Plumbing Water Plan
F5 Lower Level Plumbing Water Plan
P6 Plumbing 5cheduleS & Details
P7 Plumbing Riser Diagrams
E1 Upper Level Lighting Plan
E2 Lower Level & Canopies Lighting Plans
E3 Roof Lighting Plan
E4 Upper Level Power & Communications Plan
E5 Lower Level Power & Communications Plan
E6 Roof Power & Communication5 Plan
E7 Electrical 5chedule5 & Details
E8 Electrical Details & Conduit Notes
E9 Electrical Schedules & Details
E10 Electrical Farnelboard 5chedule5
VICINITY MAI' Carmel (Northwest Indianapolis), Indiana
Project Site _ �F'
r. wiq ! �W uunv • + Y
`x z
• .3S 4'h.
r•a� Carmel
- Wd,mne
s
No1lh Aum+sle � r v, � ,3 Chrsr�oron
lJ53�rrnPoliS lMmw ul wy � � COIfHjP CreS!
r .. i,... race •wn,s •w,,.i.. Y !..F
�.•.�, � � �% a o�n.oaa kaK
Y wA&nv _BEm✓ f V
\\\��X0Q HER
� �G\STE,y,%. ,C)
No. Q�
U : 11900212
STA
'ND I PAP•
C H T �G\``\���
524 East High Street
Lexington KY 40502
mccoyarchitects.com
te1859.233.1884
VERIDUS
1 GROUP
3280 N. Shadeland Ave. Ste. A
Indianapolis IN 46220
theveridusgroup.com
317.598.6647
tex t
�U O E 5 I C h.
12 South Main St. Ste. 200
Fortville IN 46040
context-design.com
317.458.6900
A&A ENGINEERING
CIVIL • STRUCTURAL
6036 Renaissance Place
Toledo OH 43623
aa-engineers.com
419.292.1983
Amh�,
E TECH
CONSULTAcNTS Pl0
378 Park Avenue
Lexington KY 40502
859.254.4200
Al Salam Foundation
ISLAMIC LIFE
CENTER
14120 Shelborne Road
Carmel IN 46074
Construction Drawings
3/17/2021
COVER SHEET &
LIFE SAFETY FLAN5
SET NO.