Loading...
HomeMy WebLinkAboutA00 Cover Sheet & Life Safety PlansNORTH ti 5TOKAG 137 5F 105 5F/2nro S�[Z- LO— hind o KI CH N 552 F/2 0=3 k p rl U Dmp 50UT 5T AC 24 5F LIFE 5AFETY LEGEND Line & direction of travel distance EXIT Exit sign location (coord. w/reflected ceiling & electrical/light fixture plans) 223 33.5"/.15 Egreoo Capacity (over width divided by factor) LIFE 5AFETY NOTES All means of egress shall be Accessible. All exits shall have paved paths to the public right-of-way. Maximum allowable exit access travel distance i5 250 feet for a fully Sprinklered building per 2015 IBC, Table 1017.2. Fire alarm detection and notification system will be provided in accordance with International Building Code, Indiana 5uilding Code and NFPA-72 requirements. Smoke detection with Shut down of mechanical 5yotem5 will be provided. Audio/visual notification devices will be provided throughout the facility. 1 03 MULTI12URI205E j GYMNASIUM 4,888 5F/15=326 persons unconcentrated assembly (tables & chairs) drop -down gym partition 0 L (when partition iS down, each side i5 2,444 5F/15=163 persons) �1 16,E ,P bra 60o (half I I PROJECT & CODE INFORMATION 506 767.15 0 NORTH VESTIBULE 126 5F NORTH 5TAIR I 5TR00M EXIT 163 SF 190 SF 21iv on ME 290 J,5 w o � en° D LpDU 58"/.20 �— — — 1 S F FE ABC NORTH CORRIDOR 381 5F drinking fountain / (high) / OFFICE I MEN' 126 5F/100= I 5HOE5 2 persons 280 5F CENTRAL SITTING AREA CORRIDOR 116 5F/15= <\ct 120 5F 8 persons \ 95 5 erimet Area / of u or pra to de rows) E5TR00 \ \ lav & 1 we CP1yN 00 \ \ 62 6 197 7=16 sons \ ncen. a5 bly w/out its 98 5 t area / ELEVATOR drinking fountain / SOUTH GORRIDO WOMEN'5 1 FE-ABC 372 5F /\ 5HOE5 290 �Et� °� Y 36 SF SOUTH VESTIBULE 126 5F Contractors Shall construct this project in compliance with all applicable codes adopted & amended by the State of Indiana based on the International Building Code (IBC) & the City of Carmel including: 2014 Indiana Building Code (2012 IBC with Indiana amendments) Accessibile & Usable Buildings & Facilitie5 AN51 IGG 117.1-2009 2012 Indiana Plumbing Code (2006 IFC with Indiana amendments) 2009 Indiana Electrical Code (2008 NEC with Indiana amendments) 2014 Indiana Mechanical Code (2012 IMC with Indiana amendments) 2010 Indiana Energy Conservation Code (A5HRAE 90.1, 2007 ammend.) Automated People Mover, Farts 1-3 AN51/A5CE/T & DI 21-08 ammend. 2014 Indiana Fire Code (2012 International Fire Code) Use Group: A-3 Religious Assembly Type of Construction: 2B Unprotected Structural Risk (IBC Table 1604.5): Category III (3) Sprinkler 5yotem: Fully Sprinkled GROSS BUILDING AREAS Upper Level 13,640 5F Lower Level 5,925 5F Total Gross Finished Area 19,565 5F Net Prayer Areas (Prayer Hall & Crying Room): 2,439 5F Calculated Occupant Load: 2,439/7+1=350 peroomo FLUMBING FIXTURE CALCULATIONS Due to religious & cultural reaoon5, Mu51im men do not use urinals. No water closet Subotitution5 have been considered (2006 IPC 419.2). Calculations per IBC Table 2902.1 (A-3 Religious Place of Worship) & Galc. Occupant Load of 350 persons Required Provided Male Water Closets 175/150 = 2 5 Female Water Closets 175/75 = 3 5 Family Restroom Water Closets 0 1 Total Water CloSetS 5 11 Male Lavatories 175/200 = 1 3 Female Lavatories 175/200 = 1 3 Family Restroom Lavatories 0 1 Total Lavatories 2 7 Drinking Fountains (Water Goolers) 350/1000 = 1 4 Service (Mop) Sinks 1 3 FIRE EXTINGUISHER TYFE5 • FE-ABC - 5tandard ABC (Throughout Building) Multipurpose Dry -Chemical Type: UL-Rated 2.5 Gal. (9.5 L) nominal capacity, with monoammonium phosphate -based dry chemical in manufacturer's standard enameled container. (In accordance with NFPA 10, Standard for Portable Fire ExtinguiSherS) • FE-K - Type K (Kitchen) Wet -Chemical Type: UL-Rated 2-A:1-13:C:K, 2.5 Gal. (9.5 L) nominal capacity, with potassium acetate based chemical in 5tairnle55-steel container, with preooure-indicating gauge. (In accordance with NFPA 10, 5tandard for Portable Fire ExtinguiSherS) 506 767.15 —JANIT01� 16 5F wlmop (sink \�T Al Salam Foundation PROJECT DE5CRIFTION This project includes the construction of a new religious assembly building for the AI 5alam Foundation in Carmel Indiana. The major spaces include a Prayer Hall, Multipurpose Gymnasium, and Classrooms. Occupancy is less than 350 persons based on the Prayer Hall and Crying Room. The Multipurpose Gymnasium, 11 F Fj T SLAMIC --I E C N ER Restrooms, Goat/Shoe Rooms, Office, Sitting Area, and Classrooms are all accessory to the religious assembly use. Site development 5TOKAGE 14120 Shelborne Road Carmel IN 46074 includes drives to both adjacent streets, parking lot, dumpster enclosure, and paved multiuse paths along each street. 13 5F 6' this additional exit is for security purposes and while not required, also treated as a means of egress \ X ER LL�� 5F/ -334 p ono ntrate 55emb t t fixed ato 672 net a ) 345 perir�a a not us for pr c, o tide rows) / I u this additional exit i5 for Security purpo5eo and while not required, also treated aS a means of egreoo Th Calculated Occupant Load is based 1 ximum Occupancy of defined Prayer Areas in the Prayer Hall and Crying Room (all other spaces are accessory uses) 'PER LEVEL LIFE SAFETY PLAN Scale: 3/32"=l'-0" (1:128) 49.9,5 NORTH Qiel W E 5 5TOKAGE 17 GC MECH 56 5F All spaces on the lower level are accessory to the religious assembly spaces on the upper level. WER LEVEL LIFE SAFETY PL.A Scale: 3/32"=l'-0" (1:128) REV1510N5 1/11/2021 - Construction Drawings replace all previous drawing sets and are being issues for plan review and bidding. 3/17/2021 - Construction Drawings (also sometimes labelled Permit Set): All sheets have been revised to comply with Carmel's Technical Advisory Committee (TAG) requests and are being reissued for additional plan review and bidding. 4/20/2021 - The Construction Drawings were revised to move the structural specifications to the Project Manual. Thus all the structural drawings were renumbered. The design did not change and the date on the drawings have not been changed. 12ER5tECTIVE VIEW5 N0KTHWE5T ADD ALTERNATES ONE - North & South Entry Canopies: Work includes the barrel vaulted roof, brick end wall with arches, and associated work. If not executed, base bid shall include awnings over North & South Entry Doors. TWO - Minaret w/lightning protection: Work includes the top, alum. portion of minaret & assoc. work. If not executed, base bid shall include metal coping cap over brick pier termination above dome roof. THREE - Finishing of Lower Level: Work includes all fitup & finishing of the Lower Level. If not executed, base bid to leave plumbing rough -ins & lower level unfinished. FOUR - Bullet Resistant Glazing: Replace portions of glazing in Prayer Hall to be Bullet Resistant. FIVE - Kitchen & Multipurpose Room Flnishes: Work includes all Kitchen & Pantry cabinets and equipment. Rough -ins to be included in base bid. All sports equipment and finishing in the Multipurpose Room to also be included. Base bid to include all doors, electrical & HVAC. GENERAL NOTES This project has been designed exclusively for the AI Salim Foundation and iS to be built at the listed address. Any reproduction of any part of this design for another project is prohibited. The Contractor Shall be responsible for obtaining clarification from the Con5ultant(5) before continuing construction if there are any di5crepancie5 within the drawings. Do not Scale drawings. Written dimensions take precedence over Scaled dimen5ion5. The Contractor(5) must verify all dimen5ion5 in the field. Notify the architect of any di5crepancie5. "FV" meon5 "field verify". Fluo or minus (+/-) indicates dimen5ion5 to be adjusted in the field according to the conditions. Verify with the Consultant. Dimensions are to face of masonry, face of Stud, centerline of Structure, face of concrete, or centerline of opening (or door/window unit). All drawings, Specifications, computer files, reports, field data, notes, and other documents and instruments prepared by the Consultant(S) as instruments of Service Shall remain the property of the Conoultant(s). The Consultant(5) Shall retain all common law, 5t9utory and other reserved rights, including the copyright thereto. Not to Scale & for reference only (may not be accurate) DRAWING SCHEDULE Cover Sheet, General Notes, and Life Safety Plans Civil: Cl Civil Title Sheet & General Site Information C2 Existing Topography South C3 Existing Topography Center C4 Existing Topography North C5 Demolition Plan South C6 Demolition Plan Center C7 Demolition Plan North G8 Site Plan South C9 Site Plan Center C10 Site Plan North Cll Site Details C12 Grading Plan South C13 Grading Plan Center C14 Grading Flan North C15 Utility Plan South C16 Utility Plan Center C17 Utility Frofile5 C18 Utility Frofileo C19 Utility Profiles C20 Emergency Flood Routing South C21 Emergency Flood Routing Center C22 Utility Details C23 Utility Details C24 Utility Details C25 Erosion Control South C26 Erosion Control Center C27 Erosion Control North C28 Erosion Control Details C29 Storm Water Pollution Protection Plan Landscape: L1 South Parcel Landscape Plan L2 North Parcel Landscape Plan & Flirting Notes L3 Planting Schedule & Details L4 Concept Irrigation Plan ce Irri ion tail Structural: 51 General Notes 52 Exterior Isometric Views 53 Framing Isometric Views 54 Structural Grid Flan 55 Foundation Plan 56 Foundation Details 57 Foundation Details 58 Floor Framing Plan 59 Floor Framing Details 510 Low Roof Framing Plan 511 Roof Framing Details 512 Gym Roof & Wall Framing 515 Prayer Hall Roof 514 Canopy rchl ctur Al Upper Level Floor Plan A2 Clerestory & Lower Level Floor Plan A3 Upper Level Reflected Ceiling Flan A4 Lower Level Reflected Ceiling & Canopy Piano A5 Roof Plan A6 Exterior Building Elevations A7 Enlarged Exterior Elevations & Details A8 Building 5ection5 & Detail5 A9 Building Sections & Details A10 Stair & Elevator Section All Prayer Hall Will Sections Al2 Multipurpose Gym Wall Sections A13 Room Finish, Door, & Window Schedules A14 Kitchen & Cabinetry Interior Elevations A15 Restroom & Wudu Interior Elevations A16 Prayer Hall Interior Elevations A17 Multipurpose Gym Interior Elevations Mechanical, Electrical, & Plumbing: SU1 Site Utilities Plan ME1 Mechanical & Electrical Legends ME2 Mechanical & Electrical Legends M1 Upper Level Mechanical Flan M2 Lower Level Mechanical Plan M3 Roof Mechanical Plan M4 Mechanical Schedules M5 Mechanical Details F1 Upper Level Fire Protection Plan F2 Lower Level Fire Protection Plan F3 Fire Protection 5chedule5 & Details F1 Upper Level Plumbing Waste Plan F2 Lower Level Plumbing Waste Plan P3 Roof Plumbing Plan F4 Upper Level Plumbing Water Plan F5 Lower Level Plumbing Water Plan P6 Plumbing 5cheduleS & Details P7 Plumbing Riser Diagrams E1 Upper Level Lighting Plan E2 Lower Level & Canopies Lighting Plans E3 Roof Lighting Plan E4 Upper Level Power & Communications Plan E5 Lower Level Power & Communications Plan E6 Roof Power & Communication5 Plan E7 Electrical 5chedule5 & Details E8 Electrical Details & Conduit Notes E9 Electrical Schedules & Details E10 Electrical Farnelboard 5chedule5 VICINITY MAI' Carmel (Northwest Indianapolis), Indiana Project Site _ �F' r. wiq ! �W uunv • + Y `x z • .3S 4'h. r•a� Carmel - Wd,mne s No1lh Aum+sle � r v, � ,3 Chrsr�oron lJ53�rrnPoliS lMmw ul wy � � COIfHjP CreS! r .. i,... race •wn,s •w,,.i.. Y !..F �.•.�, � � �% a o�n.oaa kaK Y wA&nv _BEm✓ f V \\\��X0Q HER � �G\STE,y,%. ,C) No. Q� U : 11900212 STA 'ND I PAP• C H T �G\``\��� 524 East High Street Lexington KY 40502 mccoyarchitects.com te1859.233.1884 VERIDUS 1 GROUP 3280 N. Shadeland Ave. Ste. A Indianapolis IN 46220 theveridusgroup.com 317.598.6647 tex t �U O E 5 I C h. 12 South Main St. Ste. 200 Fortville IN 46040 context-design.com 317.458.6900 A&A ENGINEERING CIVIL • STRUCTURAL 6036 Renaissance Place Toledo OH 43623 aa-engineers.com 419.292.1983 Amh�, E TECH CONSULTAcNTS Pl0 378 Park Avenue Lexington KY 40502 859.254.4200 Al Salam Foundation ISLAMIC LIFE CENTER 14120 Shelborne Road Carmel IN 46074 Construction Drawings 3/17/2021 COVER SHEET & LIFE SAFETY FLAN5 SET NO.