Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Demo Plan
C17ZCLE DESIGN GROUP INDIANAPOLIS, IN 1 311./81.6200 CI RC L EDESIG N GROUP.COM SURVEY LEGEND: DESCRIPTION: JL / SIGN / TWO POST SIGN D4 WATER VALVE FIRE HYDRANT ®W WATER METER © GAS METER GAS VALVE O CLEAN —OUT E❑ ELECTRIC METER BOX ® ELECTRIC TRANSFORMER EP ELECTRIC PEDESTAL GUARD POST © AIR CONDITIONER UNIT LIGHT POLE ROUND ® REBAR SET/FOUND ® FLAT GRATE INLET COMBINATION POLE TP TELEPHONE PEDESTAL WOODEN LIGHT POLE LIGHT POLE SQUARE 12" CONIFEROUS TREE & SIZE Q6 DECIDUOUS TREE & SIZE BUSH OD DRAINAGE MANHOLE $� SANITARY MANHOLE ® CURB INLET GROUND ACCENT LIGHT GUY WIRE wTR UNDG. WATER LINE — — — — — G UNDG. GAS LINE UT UNDG. TELEPHONE LINE — — — — — LIE UNDG. ELECTRIC LINE — — — — — GET OVERHEAD ELE. & TEL — — — — — OETC — OVERHEAD ELE TEL & CAB — of — OVERHEAD ELECTRIC VCP vitrified clay pipe RCP reinforced concrete pipe PVC polyethylene coated pipe VERTICAL DATUM: ACE TBM #31 ELEV. 837.68 (1929 NVD) A CHISELED "X" SET IN THE TOP OF THE NORTHWEST CORNER OF THE CONCRETE BASE OF AN ELECTRIC TRANSFORMER PAD, 15 FEET± NORTHEAST OF THE NORTHEAST CORNER OF THE BRICK POLICE STATION, 200 FEET± WEST OF RANGE LINE ROAD, 5 FEET± EAST OF A FIRE HYDRANT. ACE TBM ELEV. 833.06 (1929 NVD) A CUT "X" IN THE NORTH BONNET BOLT OF FIRE HYDRANT ON THE WEST SIDE OF THIRD AVENUE SW AT SOUTHEAST CORNER OF VETERAN'S PARK. CSC TBM #31-1 ELEV. 835.87 (1929 NVD) CUT SQUARE ON THE NORTH SIDE OF A CONCRETE LIGHT POST BASE IN THE SECOND CURBED ISLAND SOUTHERLY OF THE NORTHWESTERN END OF THE FIRE/POLICE HEADQUARTERS PARKING LOT. CSC TBM #5 ELEV. 832.97 (1929 NVD) A CUT SQUARE ON THE NORTH SIDE OF A CONCRETE LIGHT POLE BASE LOCATED NEAR THE NORTHWEST CORNER OF THE POLICE STATION OVERFLOW PARKING LOT, ALSO ±130 FEET EAST OF THE MONON TRAIL, ALSO ±30 SOUTH OF THE CENTERLINE OF MONON GREEN BLVD. CSC TBM #1 ELEV. 835.86 (1929 NVD) A CUT "X" IN THE NORTH NORTHEAST BONNET BOLT OF FIRE HYDRANT LOCATED ON THE WEST SIDE OF THE MONON TRIAL, ALSO LOCATED AT THE NORTHWEST CORNER OF THE CIVIC THEATRE BUILDING. C I V 5 I I � I I I I I I I I I s I I I I I I I I I I I I I I I I I I I I I I I � I I I I I I I I I I I I I s I I I I I I I I I � I I I I I I I � s I I I I I I I I I I I T N I I I I II r I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I `- I I I I I I I I I I I m I I I �I I I III I II I I I I I I I m I I I I I I I I I I I I m I I I � I I I I [ I I I I I I I I I I I I I I I 1 I I ID I I I 3 I I I I I I I I I ,I 1 4 I 1 I I F1 I ieueueueu � I •ueueueue l I ieueneueu I Il:neneneue l III�II�ll�ll�ll� r_ueueueir L— J \ f�l NGtI \ N SITE DEMOLITION PLAN SCALE: 1" = 10' 00 I I I 0 i i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I • CARMICHAEL BUILDING 10 I I III i El I% DEMOLITION NOTES 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY OR STATE AGENCIES PRIOR TO STARTING ANY CONSTRUCTION. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LOCAL AUTHORITIES STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL COORDINATE WORK WITH OTHER CONTRACTORS ON SITE. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION AND COORDINATION OF ALL CONSTRUCTION WITH THE RESPECTIVE UTILITY PROVIDERS PRIOR TO STARTING ANY CONSTRUCTION. 3. PROVIDE BARRIERS OR OTHER PROTECTION TO KEEP VEHICULAR AND PEDESTRIAN TRAFFIC FROM CONSTRUCTION AREA. 4. REMOVE ALL STRUCTURES, SUPPORT COLUMNS, FOOTINGS, ASPHALT PAVING, CONCRETE CURB, SIDEWALKS, CONCRETE PADS, TREES, STUMPS, HEDGES, UTILITIES, AND OTHER EXISTING SITE FEATURES WITHIN LIMITS OF DEMOLITION. ALL DEMOLITION MATERIALS SHALL BE REMOVED FROM THE SITE UNLESS OTHERWISE NOTED AND DISPOSED OF IN A MANNER ACCEPTABLE TO THE LOCAL AUTHORITY HAVING JURISDICTION. 5. CALL "811", OR 1-800-382-5544, 72 HOURS PRIOR TO THE START OF ANY EXCAVATION. CONTRACTOR SHAL BE RESPONSIBLE FOR MARKING & LOCATING PRIVATE UTILITIES INSIDE AREA OF NEW CONSTRUCTION IF THOSE UTILITIES ARE NOT MARKED OR LOCATED BY "HOLEY MOLEY". 6. CONTRACTOR SHALL PROTECT ALL EXISTING AND NEW CONSTRUCTION FROM DAMAGE. SHOULD ANY DAMAGE OCCUR, CONTRACTOR SHALL MAKE ALL NECESSARY REPAIRS AT NO COST TO THE OWNER. 7. EXISTING UNDERGROUND UTILITIES ARE PLOTTED FROM ORIGINAL SITE DRAWINGS AND TOPOGRAPHIC SURVEY. EVERY ATTEMPT HAS BEEN MADE TO SHOW ALL UTILITY LINES WHERE THEY EXIST. CONTRACTOR SHALL TAKE EVERY PRECAUTION IN EXCAVATING FOR NEW UTILITIES SINCE ACTUAL UNDERGROUND UTILITIES MAY NOT BE AS SHOWN. CONTRACTOR SHALL MAKE HIMSELF THOROUGHLY FAMILIAR WITH ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO ANY EXCAVATION AND VERIFY LOCATIONS AND DEPTHS OF ALL UTILITIES. 8. CONTRACTOR SHALL MAINTAIN UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES. ANY INTERRUPTION IN SERVICES MUST BE SCHEDULED WITH THE OWNER 48 HOURS PRIOR TO THE INTERRUPTION. 9. EXCEPT FOR THOSE UTILITIES NOTED TO BE PLUGGED OR REMOVED, RECONNECT ALL LINES ENCOUNTERED DURING CONSTRUCTION. 10. ALL CATCH BASIN AND MANHOLE FRAMES AND COVERS SPECIFIED TO BE REMOVED SHALL BE SALVAGED, CLEANED AND INSPECTED. IF THEY ARE DEEMED SOUND, THEY MAY BE REUSED AT LOCATIONS APPROVED BY ENGINEER. 11. PROTECT ALL TREES AND SHRUBS NOT SCHEDULED FOR REMOVAL. DO NOT OPERATE EQUIPMENT, STORE, STOCKPILE, OR PARK WITHIN DRIP LINE OF PLANTS. HOLD NECESSARY DISTURBANCE TO A MINIMUM. 12. REMOVAL ITEMS SHOWN ARE BASED ON BEST AVAILABLE INFORMATION AND ARE SHOWN SCHEMATICALLY. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID TO BE FULLY FAMILIAR WITH THE EXTENT OF REMOVAL ITEMS. THE CONTRACTOR IS RESPONSIBLE FOR ALL REMOVALS NECESSARY TO COMPLETE CONSTRUCTION. QUESTIONS REGARDING ITEMS TO BE REMOVED SHALL BE DIRECTED TO THE ENGINEER PRIOR TO CONSTRUCTION. DEMO LEGEND INDICATES REMOVAL OF BRICK PAVERS (SALVAGE FOR REUSE) KEY NOTES LLj REMOVE EXISTING BRICK PAVERS (SALVAGE FOR REUSE) El REMOVE EXISTING YARD DRAIN INLET REPLACE W/SQUARE CAST IRON GRATE (ADJUST TO FINISHED GRADE) EXISTING CLEAN -OUT (ADJUST TO FINISHED GRADE) In-01, Hai Engineer: 0. 910023 STATE OF .ice -' �'��S; • yND y KEY PLAN CARMEL CITY CENTER SCALE: NTS PLAN NORTH Developer: P E D C O R DEVELOPMENT CO. Project: O p N co O C CIO L Q Ca U U COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPY RIGHT 2021 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA. Construction Documents Set Issue Date Sheet Issue Date 7/30/21 Drawn By Checked By DBH RDM Last Revision Date: Project Number Sheet Title: SITE DEMOLITION PLAN Sheet Number: