Loading...
HomeMy WebLinkAboutG002 - GENERAL CONSTRUCTION NOTESCONTRACT #1 of 6 Date: 09.29.21 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Kimmel ResidenceBasement RemodelIan & Aimee Kimmel356 W. 107th StCarmel, IN 46032Approved By: Date: Megan Heidel Designer mheidel@caseindy.com G002 Dave Null Project Developer dnull@caseindy.com GENERAL / CONSTRUCTION NOTES DDEEMMOOLLIITTIIOONN NNOOTTEESS ENTERTAINMENTENTERTAINMENT NO DEMOLITION NEEDED BARBAR PULL BACK EXISTING CARPET & CUT TO DOTTED LINE PER PLANS; R/H EXISTING TACK STRIPS, CARPET, & PAD IN BAR AREA REMOVE MOTION SENSOR IN BACK CORNER PPRROOPPOOSSEEDD NNOOTTEESS ENTERTAINMENTENTERTAINMENT ELECTRIC: PULL EXISTING OUTLETS THROUGH THE BACK OF THE NEW CABINETRY CARPENTRY: F/I (4) NEW FACTORY FINISHED FLOATING CABINETS WITH MATCHING ACRYLIC/WOOD TOP (DOORS HAVE AVENTOS LIFT UP HARDWARE) F/I CABINETRY HARDWARE BARBAR PLUMBING: ROUGH IN FOR NEW BAR SINK & FAUCET; F/I ADD-A-DRAIN IN THE MECHANICAL ROOM FOR THE BAR SINK FOR DRAIN AND VENT TO EXISTING 3" DRAIN LINE (UNABLE TO RUN GARBAGE DISPOSAL ON THIS); F/I NEW UNDERMOUNT BAR SINK & FAUCET ELECTRIC: F/I (2) OUTLETS FOR MICROWAVE IN BASE CABINET & BEVERAGE REFRIGERATOR F/I (1) GFCI OUTLET PER CODE F/I LED TAPE LIGHTING UNDER BAR WALL CABINETS & TOE KICK ON NEW WHITE DIMMER SWITCH ALL OTHER SWITCHES, OUTLETS, AND CANS TO REMAIN CARPENTRY: F/I NEW FACTORY FINISHED CABINETRY PER PLANS F/I NEW CABINETRY HARDWARE F/I NEW QUARTZ COUNTERTOPS F/I NEW WALLPAPER ON BAR WALL AROUND CABINETRY & DOOR TO MECHANICAL ROOM F/I (2) NEW WALL MOUNTED WINE RACKS FLOORING F/I NEW LVP FLOORING IN BAR AREA PER PLANS TRANSITION LVP TO EXISTING CARPET & CONCRETE IN MECHANICAL ROOM TUCK EXISTING CARPET AND PAD 10/19/21