Loading...
HomeMy WebLinkAboutSite Plan20' B.L. 20' B.L.20' B.M.P.E.&U.E 20' B.M.P.E.&U.E 267 7,344 sq.ft.S0°00'00"E134.37'14.75'S0°00'00"E132.51'S85°07'43"W 25.74'N85°39'53"E S82°56'53"W 5 0 . 3 3 ' W W 20.76' 29.57' C36 ST ST 10' D.&U.E.WWWWW5' 1' 5'10.8'30.7'SITE PLAN LS20500017 STATE OF No. R.L.S. # LS20500017 DATE: FOR: OLD TOWN DESIGN GROUP BY: JD HALL LAND SURVEYING, IVOSB 803 S. OHIO STREET SHERIDAN, INDIANA 46069 Ph: 317-696-3594 JOB NO: 17-165 (267)SHEET 1 OF 2 LOT 267 JACKSON'S GRANT @ WILLIAMS CREEK, SEC 5 CARMEL, INDIANA 521 DICKSON LANE LEGEND SURFACE FLOW DIRECTION S.D.& U.E.SANITARY, DRAINAGE & UTILITY EASEMENT D. & U.E. DRAINAGE & UTILITY EASEMENT I.E.E. INGRESS , EGRESS EASEMENT U.E.UTILITY EASEMENT FYS FRONT YARD SETBACK SYS SIDE YARD SETBACK PLAN GRADE A.B. AS-BUILT *SEE SHEET 2 FOR ADDITIONAL DETAILS & NOTES*20' I.E.E. LS20500017 STATE OF No. R.L.S. # LS20500017 DATE: FOR: OLD TOWN DESIGN GROUP BY: JD HALL LAND SURVEYING, IVOSB 803 S. OHIO STREET SHERIDAN, INDIANA 46069 Ph: 317-696-3594 Fx: 317-758-5510 JOB NO: 17-165 (267)SHEET 2 OF 2 NOTE: Erosion and sediment plan, for this lot, shall, at a minimum, includes the following measures and at all times follow the guidelines for Individual residential lots and the previously approved SWPPP for CARMEL: 1) Install and maintain a stable construction site access at the location of the proposed drive. 2) Install and maintain an appropriate perimeter erosion and sediment control measures prior to land disturbance, ie silt fence. 3) Minimize sediment discharge and tracking from the lot. 4) Clean-up sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all applicable statutes and rules. 5) Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent surface stabilization. 6) Self-monitoring program plan and procedures per the previous approved SWPPP shall be followed all individual lot construction. 7) Additional erosion/sediment control measures may be required upon inspection by local planning authority. 8) I hereby certify that this individual lot plan is consistent with the storm water management permit, as approved by CARMEL, for JACKSON'S GRANT. SITE PLAN LOT 267 JACKSON'S GRANT @ WILLIAMS CREEK, SEC 5 CARMEL, INDIANA