Loading...
HomeMy WebLinkAboutE401 - Enlarged PlansELEC. DOG WASH DATA OSOSOS STOR.RISER FACPS OS OS ELECT. H H LV-OP1#1 LV-OP1#1 LV-OP1#3 LV-OP1#3 LV-OP1#1EM L3 L3 L3 L3 L2 L2 L2L2 EM EM WH-1 +42" +42" HV-OP1#2 HV-EM1#2 LV-OP1#9,11 HV-OP1#15,17,19 EUH-1 EF-6 L3 L3 EUH-1 HV-OP1#12,14,16 LV-OP1#12 AIR COMPRESSOR HV-OP1#2 HV-EM1#2 LV-EM1#11 L3 L3 L3 LV-EM1#1 LV-EM1#1 LV-EM1T-EM1HV-EM1 ATS-EM1ATS-OP1 HV-OP1 T-OP1 HV-2B HV-2A HV1 LV-OP1 04 HV-OP1#2 HV-EM1#2 L4 LV-EM1#3 GEN. HV-OP1#2 LV-OP1#16 HV-OP1#10 02 HV-OP1#9,11,13 03 TO PIT LIGHT 01 SHEET NO. DATE SCALE CHECKED BY DRAWN BY CERTIFIED BY CIVIC SQUARE PARKING GARAGE50 Red Truck Rd, Carmel, IN 46032TITLE1/4" = 1'-0"10/25/2021 11:31:51 AMENLARGED PLANSJLS JLS 10/25/2021 E401 POWER - GENERAL NOTES A INITIATING CIRCUITS SHALL BE 18/2 AWG TWISTED PAIR FPL CABLE, AND FPLP CABLE WHERE OPEN PLENUM RETURN IS USED. B NAC CIRCUITS SHALL BE 12/2 AWG FPL CABLE, AND FPLP CABLE WHERE OPEN PLENUM RETURN IS USED. LIGHTING - GENERAL NOTES A REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT PLACEMENT OF ALL LIGHTING FIXTURES. VERIFY CEILING CONSTRUCTION AND PROVIDE LIGHTING FIXTURES WITH ALL NECESSARY MOUNTING HARDWARE. B RECESSED FIXTURES SHALL BE PROVIDED WITH STRUCTURAL SUPPORTS, AS REQUIRED BY THE AHJ. IF REQUIRED, REFER TO DETAIL SHEETS FOR INSTALLATION REQUIREMENTS. C RECESSED FIXTURES LOCATED IN A FIRE RATED CEILING SHALL BE PROVIDED WITH A FIVE SIDED ENCLOSURE, WITH A FIRE RATING GREATER THAN OR EQUAL TO THE RATING OF THE CEILING ASSEMBLY. THE ENCLOSURE SHALL MEET ALL NEC AND MANUFACTURER REQUIRED CLEARANCES. D ALL WORK SHALL BE INSTALLED PARALLEL AND PERPENDICULAR TO THE BUILDING STRUCTURE, WHERE EXPOSED. ALL EXPOSED WIRING SHALL BE IN CONDUIT, UNLESS OTHERWISE APPROVED BY OWNER. E ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROPERLY SEALED WITH AN APPROVED FIRE STOP SYSTEM GREATER THAN OR EQUAL TO THE FIRE RATING OF THE WALL ASSEMBLY. F RACEWAYS SHALL NOT BE PERMITTED TO SERVE AS AN EGC. G ALL EXTERIOR PENETRATIONS, AND / OR PENETRATIONS THROUGH A THERMAL ENVELOPE, SHALL BE SEALED WITH AN APPROVED SEALANT TO PREVENT THE ENTRANCE OF AIR OR WATER. (NEC ART. 300.7(A)) H EMERGENCY LIGHTING WITH INDIVIDUAL BATTERY BACKUP SHALL BE FED FROM THE SAME CIRCUIT AS THE LIGHTING IN THE AREA WHICH IT SERVES. (NEC ART. 700.12(F)) E401 - KEYED NOTES 01 RATE OF RISE HEAT DETECTOR AT TOP OF ELEVATOR SHAFT. 02 RATE OF RISE HEAT DETECTOR LOCATED IN ELEVATOR LOBBY. 03 PROVIDE 60A, 600V NON-FUSE SAFETY SWITCH FOR ELEVATOR SUPPLY. 04 (24) EMPTY 1" CONDUITS FOR APARTMENT FEEDS STUBBED INTO THE APARTMENT CORRIDOR FOR FUTURE EXTENSION BY OTHERS. EC TO VERIFY HEIGHT AND COORDINATE WITH EV CHARGER PROVIDER FOR CONNECTION METHOD. SEE CONDO DRAWINGS.. N N N N 1/4" = 1'-0"1 ELEC/DATA/DOG WASH PLAN 1/4" = 1'-0"2 STORAGE/RISER PLAN 1/4" = 1'-0"3 ELECTRICAL ROOM PLAN 1/4" = 1'-0"4 GENERATOR ROOM 1/4" = 1'-0"5 ELEVATOR PIT PLAN N 1/4" = 1'-0"6 ELEVATOR TOP OF SHAFT PLAN N No. Description Date 1 ISSUE FOR PERMIT 10/25/ 2021