Loading...
HomeMy WebLinkAboutE501 - One Line Diagram400AT 400AF 100AT 100AF HV1 50AT 100AF 30AT 100AF T-OP1 15 kVA 480D-208Y/120V 60AT 100AF LV-OP1 G 100 kW 480Y/277V N E F0400N-AL 100AT 100AFST F0100NG-AL 50AT 100AF N E F0050NG-CUF0050NG-CU 01 02 02 02 F0050NG-CU ATS-OP1 100A, 3 POLE NEMA 1 ENCLOSURE 50A ,3 POLE NEMA 1 ENCLOSURE F0100NG-AL F0100NG-AL F0030G-CU T0060NG-CU 03 GEN-HV1 ATS-EM1 HV-OP1 30AT 100AF T-EM1 15 kVA 480D-208Y/120V 60AT 100AF LV-EM1 F0030G-CU T0060NG-CU HV-EM1 400AT 400AF HV-2A F0400N-AL 02 HV-2B F0400NG-AL TX-MV1 TBD kVA 12.47GY-480Y/277V PRIMARY BY OTHERS UTILITY CT AND METER BASE DETAIL NOTES A SECONDARY CONDUCTORS SHALL ALWAYS BE TERMINATED IN AN OVERCURRENT PROTECTION DEVICE, PER NEC 240.21(C)(1). THE SOLE EXCEPTIONS ARE SYSTEMS WITH A SINGLE PHASE, 2 WIRE SECONDARY AND SYSTEMS WITH 3 PHASE, 3 WIRE, DELTA-DELTA CONNECTED TRANSFORMER. GROUNDING ELECTRODE CONDUCTOR (GEC), SIZED PER NEC 250.66. IF USING METAL CONDUIT, THE CONDUCTOR SHALL BE BARE COPPER AND SHALL BE BONDED TO CONDUIT USING BONDING BUSHINGS OR OTHER APPROPRIATE FITTINGS AT BOTH ENDS OF THE CONDUIT. MAIN BONDING JUMPER, SIZED PER NEC 250.28(D)(1). GRIND PAINT OFF BEFORE BOLTING LUG TO TRANSFORMER CASE. GEC CONDUIT. PVC IS PREFERRED, EMT IS ACCEPTABLE. ADJUSTABLE PRIMARY TRANSFORMER TAPS. REFER TO TRANSFORMER COVER OR MANUFACTURER INSTRUCTIONS TO DETERMINE THE PROPER TAP TO USE, BASED ON THE AVAILABLE PRIMARY VOLTAGE. ALL CONDUITS WITH CONDUCTORS #4 AWG AND LARGER SHALL HAVE INSULATING BUSHINGS ON CONNECTORS. SECONDARY CONDUITS SHALL HAVE BONDING BUSHINGS INSTALLED. EQUIPMENT BONDING JUMPER FOR ALL SECONDARY CONDUITS SHALL BE SIZED PER NEC 250.102(C). B THE SECONDARY CONDUCTORS SHALL NOT EXCEED 25' IN LENGTH BEFORE TERMINATING IN AN OVERCURRENT PROTECTION DEVICE, PER NEC 240.21(C)(6). THESE CONDUCTORS SHALL BE SIZED FOR THE FULL AMPACITY OF THE OVERCURRENT PROTECTION DEVICE. C THE SECONDARY CONDUCTORS SHALL HAVE A SUPPLY-SIDE BONDING JUMPER IN EACH RACEWAY, WHERE THE MAIN(SYSTEM) BONDING JUMPER IS LOCATED AT THE SOURCE OF THE SEPERATELY DERIVED SYSTEM, AND THE FIRST MEANS OF DISCONNECT IS IN A SEPERATE ENCLOSURE, PER NEC 250.30(A)(2)(a). PER NEC 250.102(C) (1) & NEC 250.102(C)(2), THIS CONDUCTOR SHALL BE BASED ON THE SIZE OF THE UNGROUNDED CONDUCTORS IN EACH RACEWAY OR CABLE, NOT THE SUM OF ALL UNGROUNDED CONDUCTORS. SHEET NO. DATE SCALE CHECKED BY DRAWN BY CERTIFIED BY CIVIC SQUARE PARKING GARAGE50 Red Truck Rd, Carmel, IN 46032TITLEAs indicated 10/25/2021 11:31:52 AMONE-LINE DIAGRAMJLS JLS 10/25/2021 E501 NOTES: 1. SIZING IS BASED ON THHN/THWN-2 OR XHHW WIRING, EMT/IMC/GRC/FMC/ SCH. 40 PVC CONDUIT, 75C TERMINATIONS PER NEC ART. 110.14(C). MOTOR EQUIPMENT GROUNDING CONDUCTORS BASED ON 250% x FLA OVERCURRENT PROTECTION. 2. DESIGNATION DEFINITIONS: (F0000NG-AL) "F" = FEEDER "M" = MOTOR FEEDER / BRANCH CIRCUIT "T" = TRANSFORMER SECONDARY CONDUCTORS "0000" = INDICATES FEEDER ID NUMBER, GROUPED BY AMPACITY "N" = PROVIDE NEUTRAL / GROUNDED CONDUCTOR "G" = PROVIDE GROUND CONDUCTOR "-AL" OR "-CU" = INDICATES ALUMINUM OR COPPER CONDUCTORS 3. SOME FEEDERS MAY NOT BE USED ON THIS PROJECT. FEEDER SCHEDULE FEEDER ID CONDUCTOR SIZE AND QUANTITY PER CONDUIT / RUN (AWG OR KCMIL) CONDUIT SIZE AND TOTAL QUANTITY PHASE NEUTRAL GROUND SIZE No. OF RUNS F0030G-CU (3) 10 -- (1) 10 3/4" 1 F0050G-CU (3) 8 -- (1) 10 3/4" 1 F0050NG-CU (3) 8 (1) 8 (1) 10 3/4" 1 F0100NG-AL (3) 1 (1) 1 (1) 6 1-1/4" 1 F0400N-AL (3) 750 (1) 750 -- 4" 1 F0400NG-AL (3) 750 (1) 750 -- 4" 1 T0060NG-CU (3) 6 (1) 6 (1) 8 1" 1 T0100NG-AL (3) 1 (1) 1 (1) 6 1-1/2" 1 NTS1ONE-LINE DIAGRAM E501 - KEYED NOTES 01 DO NOT BOND NEUTRAL TO GROUND AT GENERATOR. ENSURE THAT NEUTRAL DISCONNECT LINK IS INSTALLED PRIOR TO ENERGIZING GENERATOR. 02 BOND NEUTRAL TO GROUND PER DETAILS NTS2LOW-VOLTAGE TRANSFORMER CONNECTION DETAILS DISTRIBUTION - GENERAL NOTES A CONDUIT SIZES ARE MINIMUM GUIDELINES, AND MAY NOT COVER ALL INSTALLATIONS. IT IS ACCEPTABLE TO ADJUST CONDUIT SIZE BASED ON RACEWAY TYPE, PER NEC REQUIREMENTS. B EACH PARALLEL RUN SHALL BE ELECTRICALLY SIMILAR, AND CONTAIN THE SAME NUMBER OF CONDUCTORS / CABLES. COMPLY WITH ALL NEC REQUIREMENTS FOR PARALLEL INSTALLATIONS. (NEC ART. 310.10(H)) C SEPARATELY DERIVED SYSTEMS SHALL HAVE A SUPPLY SIDE BONDING JUMPER INSTALLED PER NEC ART. 250.102(C), WHERE APPLICABLE. (NEC ART. 250.30(A)(2)) D EC SHALL COORDINATE THE AIC RATINGS OF ALL EQUIPMENT AND VERIFY THAT IT IS CORRECT, PRIOR TO PURCHASE / INSTALLATION OF EQUIPMENT. SERIES RATINGS SHALL NOT BE ALLOWED FOR EQUIPMENT SERVING MOTOR LOADS. (NEC ART. 240.86(C)) E EMERGENCY SYSTEMS SHALL BE ISOLATED AND MARKED AS REQUIRED BY CODE. (NEC ART. 700.7(A) & NEC ART. 700.10) F WHERE GROUND FAULT PROTECTION IS REQUIRED, A FUNCTIONAL PERFORMANCE VERIFICATION TEST SHALL BE PERFORMED AFTER THE EQUIPMENT IS INSTALLED, PRIOR TO BEING ENERGIZED BY THE SOURCE. UTILIZING THE "PUSH TO TRIP" FEATURE IS NOT ALLOWED. TESTING SHALL BE PERFORMED UTILIZING A PRIMARY CURRENT INJECTION TEST SET. THE TESTING RESULTS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD AND BE MADE AVAILABLE UPON REQUEST TO THE AHJ. IT IS THE RESPONSIBILITY OF THE EC TO DETERMINE IF THIRD PARTY TESTING IS REQUIRED BY THE AHJ. (NEC ART. 230.95) No. Description Date 1 ISSUE FOR PERMIT 10/25/ 2021