HomeMy WebLinkAboutP100 - Foundation and First Floor Plumbing PlanLONG-TERM
BYCYCLE
PARKING
(MINIMUM
48 BIKES)
WALL MOUNT
ELECT.
TRASH
CARMEL STREET DEPT
AND STORAGE
-1'-6" AFF
CONDO
ACCESS
ELEC.
DOG WASH
PUBLIC
PARKING
ENTRY
STOR.RISER
BIKE
STACK
RACK
RAMP
UP
GEN.
DATA
RAMP
DOWN
UP
STOR.
NO PARKING
NO PARKING
NO PARKING
RAMP
UP
RAMP
UP CROSS WALK
STOP1 2 32.61.3
A
C
D
E
F
G
H
I
J
L
B
K RAMPUP2.5
MD
ELECT.
ELEC.
DOG WASH
PUBLIC
PARKING
ENTRY
STOR.RISER
BIKE
STACK
RACK
RAMP
UP
GEN.
DATA
RAMP
DOWN
STOR.
RAMP
UP
RAMP
UP CROSS WALK
STOPRAMPUP6
P500
3/4" CW
3/4" CW
3/4" CWHB-1
4" FD-1
4" FD-1
4" FD-1
INT-1
9
8
9
8
9
8
9
8
4" FD-1
3/4" CW
10
10
HB-1
11
11
11
P100
3
10" ST
8" ST
10" ST
8" ST
10" ST
8" SAN
8" ST
4" SAN
4" V
4" SAN
10" ST
8" ST
8" ST
12
3
1
1
12
INT-1
4
F.F.E. = 837.35'
12" ST
4" SAN
4" SAN
4" SAN
4" SAN
3
4" SAN
4" SAN
4" SAN
5
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
3
2
4"SAN I.E. = -7' -7"
(829.72')
6
7
4" SAN
4" SAN
8" ST
3
4" SAN
12"ST I.E.=-5' -4"
(832.00')
2
3/4" CW
3/4" CW
6" CW
4" SAN
(BY OTHERS)
12 13
GENERAL NOTES:
1. PROVIDE NEW DOMESTIC WATER, SANITARY WASTE, STORM
DRAINAGE AND NATURAL GAS SYSTEMS FOR THIS BUILDING. PROVIDE
ALL NECESSARY COMPONENTS FOR FULLY OPERATIONAL SYSTEM.
INSTALL SYSTEMS IN ACCORDANCE WITH STATE REQUIREMENTS AND
LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE THE
LOCATION OF ALL UTILITY CONNECTION POINTS, FLOOR DRAINS AND
HUB DRAINS FOR EQUIPMENT WITH OTHER TRADES.
2. ALL FLOOR PENETRATIONS TO BE SEALED WATER TIGHT BY TRADE
CONTRACTORS.
3. ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED
CONSTRUCTION SHALL BE PROVIDED A UL LISTED THROUGH
PENETRATION FIRESTOP ASSEMBLY. THE RATINGS OF ALL FIRESTOP
ASSEMBLIES SHALL BE GREATER THAN OR EQUAL TO THE RATING OF
THE PENETRATED BARRIER.
4. CORE DRILL PENETRATIONS IN CONCRETE FLOORS OR WALLS 1-2
INCHES LARGER THAN THE PIPE DRIAMETER OF THE PENETRATING
PIPE.
5. NO STURCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED
WITHOUT THE KNOWLEDGE AND WRITTEN APPROVAL OF OWNER.
6. MAINTAIN MAIXIMUM HEADROOM AT ALL LOCATIONS. ALL PIPING TO
BE AS TIGHT TO THE UNDERSIDE OF DECK AS POSSIBLE. ALL
EXPOSED PIPING SHALL BE APPROVED BY ARCHITECT AND SHALL
MAINTAIN REQUIRED CLEARANCES.
7. STORM AND SANITARY PIPING ARE TO BE INSTALLED SLOPED AT CODE
ALLOWABLE SLOPES.
3/4" CW
3/4" CW
EWH-1
3/4" HW
3/4" CW
15
16
18
17
DOG WASH
-RD
PE11400027
NENOISS
AL
EFORP D
STATE OF
NI I A N A ERGIN ESIGE T E RE
No.CAMERO NT .YAMA
SHITASHEET NO.
DATE
SCALE
CHECKED BY
DRAWN BY
REVISIONSYM.DATE
CERTIFIED BY
CIVIC SQUARE PARKING GARAGE50 Red Truck Rd, Carmel, IN 46032TITLEAs indicated
10/25/2021 10:14:51 AMFOUNDATION AND FIRSTFLOOR PLUMBING PLANC.Y.
D.T.
10/25/21
P100
1/16" = 1'-0"P100
1 FIRST FLOOR PLUMBING PLAN
1/16" = 1'-0"P100
2 FOUNDATION PLUMBING PLAN
# PLAN NOTES
1 6" STORM UP.
2 4" SANITARY STACK UP.
3 4" SANITARY UP TO FLOOR DRAIN.
4 12" STORM CONNECT TO STORM STRUCTURE IN GARAGE.
5 4" SANITARY UP TO FLOOR CLEANOUT.
6 SEE CIVIL ENGINEER'S SITE UTILITY PLAN FOR CONTINUATION.
7 4" VENT UP TO ABOVE THIRD FLOOR.
8 6" STORM CONDUCTOR.
9 4" SANITARY STACK .
10 3/4" COLD WATER RISER WITH HOSE BIBB AT 24" A.F.F. EACH
FLOOR. RISER INSTALLED TO BE ABLE TO DRAIN DOWN THROUGH
LOWEST HOSE BIBB.
11 3/4" COLD WATER. INSTALL SLOPED FROM CENTER TO EACH HOSE
BIBB RISER FOR DRAIN DOWN.
12 3/4" PEX COLD WATER UP THROUGH SLAB IN DOG WASH ROOM.
TRANSITION TO COPPER ABOVE SLAB.
13 3/4" PEX COLD WATER UP THROUGH SLAB IN RISER ROOM.
TRANSITION TO COPPER ABOVE SLAB.
15 3/4" COLD WATER UP TO CEILING. CONNECT TO HOSE BIBB
SUPPLY, WATER HEATER SUPPLY AND DOWN TO DOG WASH,
16 1/2" HOT AND COLD WATER DOWN TO DOG WASH MIXING FAUCET.
DOG WASH AND FAUCET BY OTHERS.
17 3/4" COLD WATER TO HOSE BIBB RISERS. PROVIDE ISOLATION
VALVE IN DOG WASH FOR WINTER SHUT-DOWN.
18 WATER HEATER ON SHELF MOUNTED HIGH ON WALL.
1/4" = 1'-0"P100
3 ENLARGED DOG WASH ROOM PLUMBING PLAN