HomeMy WebLinkAboutS601 - Column Schedule and DetailsN Lo N O O co U O Ln ro N CL TIE SPACING TYPICAL TIE SPACING — SEE COLUMN SCHEDULE 1 1/2" CLR __i I (TYP.) U N EXTEND ALL COLUMN VERTICAL BARS TO TOP OF STUB COLUMN N CONSTRUCTION JOINT J m 12" LAP 7-#4 TIES x @6"o.c. WITHIN BEAM DEPTH Ua LEVEL 5 OR RAMP SLAB CONSTRUCTION JOINT j SEE COLUMN SCHEDULE FOR VERTICAL COLUMN STEEL AND TIES TOP OF EXTENDED COLUMN DETAIL/ NO SCALE TYPICAL COLUMN SPLICE DETAIL,/ NO SCALE COLUMN SCHEDULE COLUMN MARK SIZE 24 N 24 N 24 N 24 N 24 N LEVEL 3 --- --- ------------- -------------- ------------- ------------- ------------- LEVEL 2 -------------- - - - - - - - - - - - - - - - - - - - - - - - - - - --------------- - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL 1 -------------- - - - - - - - - - - - - - - - - - - - - - - - - - - --------------- - - - - - - - - - - - - - - - - - - - - - - - - - - TOP/FOOTING FOOTING DOWELS TO BE SAME SIZE AND QUANTITY AS COLUMN AT BOTTOM WITH TENSION SPLICE. NOTES 1. USE BAR PATTERNS 1/S601, 2/S601 AND 3/S601. 2. SEE SHEET S??? FOR TOP/COLUMN ELEVATIONS. 3. REINFORCING STEEL SHOP DRAWINGS SHALL SHOW ALL COLUMNS FULL HEIGHT WITH FLOOR ELEVATIONS INDICATED. 4. SPLICES FOR COLUMN VERTICAL REINFORCEMENT SHALL BE A FULL TENSION MECHANICAL SPLICE USING THE GRIP -TWIST THREADED COUPLER SYSTEM AS MANUFACTURED BY BARSPLICE PRODUCTS, INC., OR BY APPROVED SUBSTITUTE. -I C� SEE COLUMN SCHEDULE FOR COLUMN REINF. BALANCE SEE COLUMN SCHEDULE SECTION 'A -A' >_ BEAM REINF. ANCHORED IN COLUMN (TYP.) SEE P/T BEAM SCHEDULE FOR SIZE, QUANTITY AND LOCATION BEAM REINF. ANCHORED IN COLUMN (TYP.) SEE P/T BEAM SCHEDULE FOR SIZE, QUANTITY ANC LOCATION ALTERNATE POSITION OF HOOK IN SUCCESSIVE TIES (TYPICAL) SEE SCHEDULE 8-BAR PATTERN 1 "=1'-0" ALTERNATr nnciTinr.i nr HOOK It TI ES (TY w 0 w U cn w w U) ORIENT 2-BAR BUNDLES AS SHOWN TO FACILITATE INSTALLATION OF BEAM REINFORCING FOOTING DOWELS (TYP.) 1 1 /2" CLR (TYP.) SEE SCHEDULE 12-BAR PATTERN 1 "=1 -0" ALTERNATr nnciTinni nr HOOK It TIES (TY w J 0 w cn w w U) SEE SCHEDULE 16-BAR PATTERN, 1 "=1 '-0" SECTION 'B-B' ORIENTATION OF POST -TENSIONED BEAM 1 S601 .S v.�ivniiviv „F POST -TENSIONED BEAM 2 S601 _S vnuvniiviv vF POST -TENSIONED BEAM 3 S601 � z H uLu =O o Z 2 N m L9 Lo Lo co Ir0 co LLI o W 0 —m _m L Zw Dr- w W�- > Q W oQ Wo 0 12 Q z H z z v5 �LL & w Lo YuT- aJ //� U U- o Lo CERTIFIED BY �10201124 STATE A11 AL' ADD'L TIES @ 2"o.c. BETWEEN 2-#4 x n; �, TIGHT GROUPS OF ANCHORS TO A MAX. TO INSIDE OF COL. TIES OF 4 ADD'L TIES @ 2" SPACING. SEE COLUMN $A' $A' THEN GO TO 6" SPACING -SEE TYPICAL SCHEDULE SYM. REVISION DATE COLUMN P/T ANCHORAGE DETAIL. IDS SDI A ISSUE FOR PERMIT 10/25/21 • Ion �1 ■IA_mmPIP i NMI AA 5 ADD'L #4 COL. TIE — SETS AT BOTTOM OF P/T ANCHORAGE, SPACE AS SHOWN COLUMN 3/4"=1 '-O" AN CONTINUOUS STRANDS THRU COLUMN AT LINE OI P/T STRANDS 2-#4 HORIZ. TOP & BOT. BEHIND EACH STRAND (TYP.) BALANCE SEE COLUMN SCHEDULE K #4 x 4'-0" VERT. IN BETWEEN STRANDS AS SHOWN IN SEC. 'A -A' (NO. OF BARS = NO. OF ANCHORS PLUS ONE) P/T ANCHORAGE AT RAMP 5 ADD'L #4 COL. TIE SETS AT TOP OF P/T ANCHORAGE, SPACE AS SHOWN 2-#4 HORIZ. TOP & BOT. BEHIND EACH STRAND (TYP.) #4 x 4'-0" VERT. IN BETWEEN STRANDS AS SHOWN IN SEC. 'B-B' (NO. OF BARS = NO. OF ANCHORS PLUS ONE) SEE COLUMN SCHEDULE FOR TYP. COL. REINF. SETS AT BOTTOM OF P/T ANCHORAGE, SPACE AS SHOWN TYPICAL P/T ANCHORAGE AT COLUMN 3/4"=1'-0" 0 z Q W J 0 Lu z C/) J Q J w O Lu U 0 CHECKED BY AC K DRAWN BY SLH SCALE AS NOTED DATE SHEET NO. S601