Loading...
HomeMy WebLinkAboutA222 - GARAGE ELEVATIONSGARAGE OPENNESSGARAGE OPENNESSGARAGE L 01+819' -10"GARAGE L 02+830' -4"GARAGE L 03+840' -10"GARAGE L 04+851' -4"GARAGE L 05+861' -10"GARAGE L 01.5+817' -4 1/2"ART INSTALLATIONSOUTH ELEVATION : 2,962 OPEN AREA / 5,910SF PERIMETER AREA = 50% OPENNESSGARAGE L 01+819' -10"GARAGE L 02+830' -4"GARAGE L 03+840' -10"GARAGE L 04+851' -4"GARAGE L 05+861' -10"STEEL SUPPORTS FOR SOLAR PANELSWEST ELEVATION : 3,170 OPEN AREA / 10,348SF PERIMETER AREA = 31% OPENNESSART INSTALLATION50 South B.B. King Blvd.Suite 600Memphis, TN 38103901.521.1440Drawing Name:Client:Drawn By:Checked By:Project Name:SealIssued / RevisedDate#Issues and Revisions©2020 LRK Inc.Drawings, written material, and design concepts shall not be used or reproduced in whole or part in any form or format without prior written consent of LRK Inc. Do not scale drawings. Use given dimensions only. If not shown, verify correct dimensions with the Architect. Contractor shall check and verify all dimensions and conditions at job site.9/3/2021 2:19:46 PMC:\Revit Projects\18066-Corner Carmel-CENTRAL-19_chaley.rvtLRK Project Number: 01.18066.00A222GARAGE ELEVATIONSThe CornerCarmel, INVWBDSPThe Corner Carmel, IN •01.18066.001685 E. 116th Street, Carmel, INSCALE: 1/8" = 1'-0"27SOUTH ELEVATION -GARAGESCALE: 1/8" = 1'-0"13WEST ELEVATION -GARAGE06.02.21Permit Set - GarageB08.20.21IFC Set