Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A132 - UPPER FLOOR PLAN - GARAGE
DN7A23113A23113A22227A22213A221PEDESTRIAN BRIDGE TO THIRD FLOOR OF BUILDING B(BRIDGE LOCATED ON THIRD FLOOR OF GARAGE)PEDESTRIAN BRIDGE TOSECOND FLOOR OF BUILDING A(BRIDGE LOCATE DON THIRD FLOOR OF GARAGE)ELEV. G1STAIR G1STAIR G2L2 -L4 : 87 SPACES, EACH LEVELG7G6G5G4G3G2G1GAGCGB29A32126A321LINE OF OUTSIDE FACE OF STUD AT THIRD FLOOR OF BUILDING BLINE OF OUTSIDE FACE OF STUD AT SECOND FLOOR OF BUILDING AG1.4G8G9G10RAMP UP981318881013115A41622A41523A41750 South B.B. King Blvd.Suite 600Memphis, TN 38103901.521.1440Drawing Name:Client:Drawn By:Checked By:Project Name:SealIssued / RevisedDate#Issues and Revisions©2020 LRK Inc.Drawings, written material, and design concepts shall not be used or reproduced in whole or part in any form or format without prior written consent of LRK Inc. Do not scale drawings. Use given dimensions only. If not shown, verify correct dimensions with the Architect. Contractor shall check and verify all dimensions and conditions at job site.6/2/2021 5:20:43 PMC:\Revit Projects\18066-Corner Carmel-CENTRAL-19_chaley.rvtLRK Project Number: 01.18066.00A132UPPER FLOOR PLAN -GARAGEThe CornerCarmel, INVWBRCH116th Street & RangelineCarmel, INThe Corner Carmel, IN •01.18066.00SCALE: 1/8" = 1'-0"25TYPICAL UPPER FLOOR PLAN -GARAGE06.02.21Permit Set - Garage