Loading...
HomeMy WebLinkAboutA414 - ELEVATOR B1 - FLOOR PLANS AND SECTION29 A414 28 A414 ELEVATOR CONTROL ROOM B167 TRASH B123a B123c B167 B123a ELEVATOR B1SC1 STORAGE B166 FEC B166 LOBBY B165 B165a 1" A.S. 5 1/2"9'-7 1/2"5 1/2"7'-8 1/2"5 1/2"14'-2 1/2" 2'-2 3/4"5'-0"2'-4 3/4" CL 5'-7" 9'-9 1/2"5 1/2"7'-8 1/2"5 1/2"14'-2 1/2"7'-2 1/2"5 1/2"6'-6 1/4"7 5/8"8'-4 1/8"1'-3"5'-2 1/2"5 1/2"24'-7"CL2'-0"CL2'-0"8'-5 7/8"1'-3" 1" A.S. 8'-4" 1" A.S. CL7 5/8"7'-0"7 5/8"11'-6 1/2"3'-0" SC1 1'-8"5'-0"1'-8" ACCESS PANEL A414 6 G G 5 4 1'-3"28'-7"4'-8"6'-0"B165b BUILDING ACCESS CONTROL. PROVIDE 30x48 CFS. J B J G D F C C G D D F F A A BUILDING ACCESS CONTROL. PROVIDE 30x48 CFS. A 29 A414 28 A414 LOBBY B265 ELEC. B264 B264 B239bB438 B465 B464 B439b B464 ELEVATOR B1CORRIDOR B238FEC SEE SHEET A175 FOR UNIT PLAN B55 1/2"1" 4'-6" 4'-6"5 1/2"5'-3"TELECOMM. B268 B268 B468B468 3'-1" 6'-7 1/4"11 1/8"7'-0"7 5/8"7'-3 1/2" 1" 5 1/2" 4'-5 1/2"6 1/2"2'-11"1" 5'-3"7'-1"3 1/2"3'-1"7'-2 1/4"7 5/8"7'-0"7 5/8" 1'-1 1/2" 4'-10" 1'-1 1/2"3'-3"15 A414 C4 C FA F AA DA C A E 29 A414 LOBBY B365 B365a B339b ELEVATOR B1FEC SEE SHEET A164 FOR UNIT PLAN A4 CL 5'-6 1/2"4'-5" 1" A.S. 9'-11 1/2"5 1/2"7 5/8"8'-8"7 5/8"18'-10 1/4"1'-3"5'-2 3/8"1'-3"7'-5"1'-3"1'-0"7'-0"7 3/4"7'-8"3'-8" CLEQ EQ 5 1/2"1'-5" 4'-8" 2'-7 1/2" 1" A.S. 14 A322 CORRIDOR B338 CD F A FA F C D E A A TRASH CHUTE SEISMIC JOINT WITH COVER PLATE 6 A321 BLDG B L 02 +830' -8 23/32" BLDG B L 03 +841' -4 19/32" BLDG B L 01 +820' -0 27/32" BLDG B L 04 +852' -0 15/32" BLDG B TRUSS BEARING +861' -1 19/32"5'-1 1/4"9'-1 1/8"10'-7 7/8"10'-7 7/8"10'-7 7/8"PIT5'-0"CLCLR.14'-0"ELEVATOR B1 SUMP PUMP, COORDINATE LOCATION WITH MANUFACTURER 18" WIDE PIT LADDER WITH 1 1/2" STRINGER CHANNELS, 5/8" STEEL CUP ANGLE BRACKETS AND ANCHOR BOLTS AT TOP AND BOTTOM. RUNGS SHALL BE 3/4" AT 12" O.C. SIDE RAILS OF LADDER MUST EXTEND 42" ABOVE THE LANDING PLATFORM PROVIDE ASPHALTIC WATERPROOF MEMBRANE TO FULL PERIMETER AND BOTTOM OF PIT COLD-JOINT WATERSTOP AT TOP AND BOTTOM PERFORATED PERIMETER FOUNDATION DRAIN. CONNECT TO CIVIL STORM COLLECTOR LINE BLDG B L 01 +820' -0 27/32" 3.6 3.12 4.3 2.4 BLDG B L 01 +820' -0 27/32" 3.6 2.4 3 A414 BLDG B L 01 +820' -0 27/32" 3.6 2.4 BLDG B L 02 +830' -8 23/32" FIBER CEMENT LAP SIDING, 7" EXPOSURE TRIM BOARD FIBER CEMENT TRIM, PTD. TRIM CORNER BOARD, PTD. 1 8 3/4"E D C B A 5 1/2"11 1/2" CORRIDOR UNIT 1'-3" 15"x18" STAINLESS STEEL CLAD INTAKE DOOR TRASH CHUTE TRASH CHUTE FULL DIAMETER VENT THRU ROOF AT TRASH CHUTE 15"x18" STAINLESS STEEL CLAD INTAKE DOOR 15"x18" STAINLESS STEEL CLAD INTAKE DOOR 15"x18" STAINLESS STEEL CLAD INTAKE DOOR PROVIDE SANITIZING UNIT 50 South B.B. King Blvd. Suite 600 Memphis, TN 38103 901.521.1440 Drawing Name: Client: Drawn By: Checked By: Project Name: Seal Issued / RevisedDate# Issues and Revisions ©2020 LRK Inc. Drawings, written material, and design concepts shall not be used or reproduced in whole or part in any form or format without prior written consent of LRK Inc. Do not scale drawings. Use given dimensions only. If not shown, verify correct dimensions with the Architect. Contractor shall check and verify all dimensions and conditions at job site.7/16/2021 2:22:26 PMC:\Revit Projects\18066-Corner Carmel-CENTRAL-19_smatsumotoBZ9SZ.rvtLRK Project Number: 01.18066.00 A414 ELEVATOR B1 -FLOOR PLANS AND SECTION VWB SWMThe Corner Carmel, IN • 01.18066.00 The Corner - Building B 1625 E. 116th Street, Carmel, IN SCALE: 1/4" = 1'-0" 27 GROUND FLOOR PLAN - ELEVATOR B1 SCALE: 1/4" = 1'-0" 25 SECOND & FOURTH FLOOR PLAN - ELEVATOR B1 SCALE: 1/4" = 1'-0" 13 THIRD FLOOR PLAN - ELEVATOR B1 SCALE: 1/4" = 1'-0" 29 SECTION - ELEVATOR B1 SCALE: 1/4" = 1'-0" 5 ELEVATION - LOBBY SCALE: 1/4" = 1'-0" 6 ELEVATION - LOBBY SCALE: 1/4" = 1'-0" 4 ELEVATION - LOBBY SCALE: 1 1/2" = 1'-0" 3 WALL DETAIL SCALE: 3/4" = 1'-0" 15 TRASH CHUTE PLAN DETAIL SCALE: 1/4" = 1'-0" 28 TRASH CHUTE SECTION A A 06.16.21 Permit Set A 07.15.21 Addendum A