Loading...
HomeMy WebLinkAboutL600 LANDSCAPE DETAILS1. EXCAVATE ROOTBALL PIT 2. ADD EXCAVATED SOIL & TAMP. SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3" HIGHER THAN FINISH GRADE. 3. REMOVE ALL TWINE, ROPE, WIRE BASKET, AND BURLAP FROM TOP 1/3 OF ROOTBALL & EXPOSE ROOT FLARE. 4. BACKFILL WITH SOIL MIX & "WATER IN" 5. COMPLETE BACKFILLING, CONSTRUCT SAUCER, SPADE-EDGE & ADD MULCH 6. STAKE & GUY SECURELY (AS REQUIRED) ADD EXCAVATED SOIL AS NEEDED TO BRING TREE TO FINISHED GRADE. TAMP LIGHTLY BUT THOROUGHLY PRIOR TO SETTING TREE TO PREVENT SETTLING. SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH & LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE)6"MIN.PLANTING SOIL MIX (SEE GENERAL NOTES) 12"12" 12" MIN. 8" GENERAL NOTES: 1. SEE GENERAL NOTES FOR DRAINAGE REQUIREMENTS PROIR TO PLANTING. 2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. 3. IMMEDIATELY SOAK WITH WATER. 4. DO NOT BREAK ROOTBALL. 2-3" SPADE EDGE 3" MULCH LAYER (SEE GENERAL NOTES) EARTH SAUCER 1-1/2" MULCH LAYER FINISHED GRADE PLANTING PROCEDURE KEEP MULCH OFF TRUNK OF TREE REMOVE ALL ROPE, BURLAP, AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL UNDISTURBED SOIL 24" U.N.O.24" U.N.O. 3" MULCH LAYER (SEE GENERAL NOTES) PLANTING SOIL MIX (SEE GENERAL NOTES) SPADE EDGE SHRUB (PER PLAN) NOTE: CROWN BED 2-3" ABOVE FINISH GRADE. TOP OF ROOTBALL TO BE A MIN. OF 2" ABOVE FINISH GRADE. PLANTING PROCEDURE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED. 2. ROTOTILL BED TO A 12" MIN. DEPTH OR AS REQUIRED FOR SPECIFIED SHRUBS. REMOVE EXISTING SOIL AS REQUIRED. SPREAD 6" MIN. LAYER OF SOIL MIX OVER BED. ROTO-TILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. 4. SPACE PLANTS AS IDENTIFIED IN PLANTING SCHEDULE; WHEN INSTALLING ADJACENT TO DIFFERENT PLANT MATERIAL, SPACING SHALL BE PROVIDED BASED ON THE LARGER DISTANCE REQUIREMENT. NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE. BED WIDTH ROOT BALL O.C. SPACING BED WIDTH PLAN SECTION FINISH GRADE PLANT 30" FROM CURB AS NEEDED MULCH PER PLAN (SEE GENERAL NOTES) 2 1 VERTICAL EDGE 4"3" NOTE: SPADE EDGE SHALL CREATE A CLEAN SEPARATION BETWEEN AREAS; AND SHALL CREATE SMOOTH & EVEN LINES (AS INDICATED ON THE PLANS) NOTE: SPADE EDGE DETAIL SHALL BE USED AT ALL LAWN EDGES & AT EDGES OF MULCHED AREAS (FOR CONTAINMENT) LAWN AREA PLANTING OR MULCHED AREA EXISTING GRADE OR GRADE OF PLANTING AREA PERMITTING 9025 River Road, Suite 200 | Indianapolis, Indiana 46240 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com PLOT DATE: 11/3/2021 6:40 PMPLOT SCALE: 1:2.5849EDIT DATE: 9/29/2021EDITED BY: LKESSLERDRAWING FILE: P:\2021\01816\D. Drawings\Civil\Construction Documents\2021.01816.LA.L100.LP.dwgProject Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 9/29/2021 2021.01816 ARTISTIC COMPOSITE PALLETS - PARKING ADDITION 4518 W. 99th Street Carmel, Indiana REVISION SCHEDULE NO.DESCRIPTION DATEAPPROVAL PENDINGNOT FOR CONSTRUCTIONL600 LANDSCAPE DETAILS SPADE EDGE DETAIL03 L103 SCALE: 3"=1'-0" SHRUB PLANTING DETAIL02 C701 SCALE: 1"=1'-0" TREE PLANTING DETAIL01 C701 SCALE: 1/2"=1'-0" SPADE EDGE DETAIL03 L103 SCALE: 3"=1'-0" SHRUB PLANTING DETAIL02 C701 SCALE: 1"=1'-0" TREE PLANTING DETAIL01 C701 SCALE: 1/2"=1'-0"