Loading...
HomeMy WebLinkAboutM101.0REFRIGERATOR OUTLET MICROWAVE OUTLET DISHWASHER POWER SUPPLY HOOD VENT POWER SUPPLY GARBAGE DISPOSAL POWER SUPPLY COOKTOP POWER SUPPLY CLOTHES DRYER OUTLET CLOTHES WASHER OUTLET 110V OUTLET 220/240V OUTLET GFCI OUTLET OUTDOOR OUTLET LOW VOLTAGE TRANSFORMER SINGLE POLE SWITCH DIMMER SWITCH 3-WAY SWITCH 4-WAY SWITCH GD WALL SWITCH GD COUNTERTOP AIR SWITCH LOW VOLTAGE LIGHTING SWITCH TIMER SWITCH OCCUPANCY SWITCH SURFACE MOUNT LIGHT FIXTURE 4" RECESSED CAN LIGHT 6" RECESSED CAN LIGHT 6" RECESSED CAN/FAN UNIT EXHAUST FAN ONLY EXHAUST FAN W/ LIGHT WALL MOUNTED SCONCE / LIGHT CEILING FAN LOW VOLTAGE LIGHT SMOKE DETECTOR CARBON MONOXIDE DETECTOR SMOKE/CARBON MONOXIDE MOTION SENSOR CEILING SPEAKER GAS SHUT-OFF KEY MAIN WATER SHUT-OFF LAUNDRY BOX FROST PROOF HOSE BIB CLEAN OUT TILE-IN DRAIN FLOOR DRAIN COLD AIR RETURN FLOOR FLOOR SUPPLY REGISTER CEILING CEILING SUPPLY REGISTER WALL WALL SUPPLY REGISTER EXTERIOR WALL EXHAUST VENT T THERMOSTAT DRYER BOX ELECTRICAL KEY PLUMBING KEY HVAC KEY NDN FLOOR FLOOR CEILING CEILING CEILING FLOORSD SD SD GFCI R R CO/SD SD SD SD R GFCI R GFCI R OPEN BELOW J/J BATH 8'0" CH AFF CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET CLOSET BEDROOM 1 8'0" CH AFF CARPET BATH CLOSET CLOSET BATH MASTER BATH 8'0" CH AFF TILE Shelving CLOSET HALL 8'0" CH AFF CARPET ATTIC STORAGE P2P2 E4E4 E1E1 E2E2 P1P1 E3E3 E3E3 E3E3 H1H1 E5E5 E6E6 8'0" CH AFF CARPET BEDROOM 2BEDROOM 3 ATTIC CHASEOPEN STORAGE OPEN STORAGE 4" 3000K MODEL NO. JUNO-4RLD G3 09LM 30K 90CRI 1 20 FRPC WWH M6 DUPLEX WHITE LUTRON TOGGLE DIMMER SWITCH WHITE PROPOSED HVAC PLAN NOTES NOTE QTY DESCRIPTION 1 PROVIDE NEW HVAC SUPPLY AND RETURNS AS REQUIRED FROM FIRE DAMAGE. CLEAN AND REPAIR IF NECESSARY.H1H1H1H1 PROPOSED ELECTRICAL PLAN NOTES NOTE QTY DESCRIPTION 1 REMOVE AND REPLACE EXISTING ELECTRICAL AS NECESSARY FROM FIRE DAMAGE. VERIFY GFCI OUTLETS ARE IN PROPER WORKING ORDER. 1 NEW LED RECESSED CANS ON DIMMER SWITCHES IN EXISTING LOCATIONS 3 PROVIDE ROUGH IN AND FINISH FOR CEILING FAN WITH LIGHT KIT. 1 PROVIDE AND INSTALL NEW SMOKE/CARBON MONOXIDE DETECTORS PER CODE. 1 PROVIDE ROUGH IN AND FINISH FOR (1) VANITY LIGHT AND (2) GFCI OUTLETS PER CODE. 1 PROVIDE ROUGH IN AND FINISH FOR (2) VANITY LIGHTS AND (2) GFCI OUTLETS PER CODE. E1E1 E2E2 E3E3 E4E4 E5E5 E6E6 E1E1 E2E2 E3E3 E4E4 E5E5 E6E6 PROPOSED PLUMBING PLAN NOTES NOTE QTY DESCRIPTION 1 PULL AND REPLACE (2) VANITY SINKS/FAUCETS, (1) TOILET, (1) SHOWER HEAD AND VALVE. 1 ROUGH IN AND FINISH FOR (2) NEW VANITY SINKS/ FAUCETS, (1) TOILET, AND (1) TUB/SHOWER COMBO. P1P1 P2P2 P1P1 P2P2 SELVIO RESIDENCEFIRE RESTORATION3208 Maralice Dr.Carmel IN 46033Date:Revision : A13 SHEET OF 18 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 4622010/27/2021 DATE : [PRINTS TO SCALE IF PRINTED ON 24" X 36" ]DESIGNER: JONNI BERKLEYE: jonni@customlivingusa.comC: 317-801-3073PROPOSED 2ND FLOOR M.E.P. PLAN SCALE: 1/4 = 1' RECESSED CAN LIGHTS NEW OUTLET DEVICE STYLE NEW SWITCH DEVICE STYLE GENERAL M.E.P NOTES HVAC Contractor is responsible for engineering calculation necessary for correct sizing of new equipment and ductwork being supplied, fabricated and installed for the project. HVAC ductwork installed in unconditioned areas to be insulated and sealed per Building Code Standards. HVAC contractor to start, test, and balance any new equipment and ductwork to assure proper operation of new systems. Final plumbing materials selected may have an affect on the final Plumbing Material and Installation Budgets. Owners understand that if additional plumbing, electrical or ductwork is found in walls being deleted that is not included on the plans there will be a Change Order during construction to relocate as necessary. Owners understand that during mechanical rough-ins there will be times when the water service will be shut off to areas in the home. Plumbing and Lighting fixtures supplied by Owner will not be warranted by Custom Living Plumbing and Lighting fixtures supplied by Owner must be selected and on-site prior to start of mechanical rough-ins. 11/08/21