Loading...
HomeMy WebLinkAboutS101.0DN SB3721 SB3721 SB34214DB1221SB3421SB3721 SB3721 SB3421 4DB1221 SB3421FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR CEILING CEILING CEILING CEILING CEILING 30X22 ATTIC ACCESS FLOORRRRR R R R SD SDSD SD SD GFCI R4 5'-2 3/8" 17'-9 7/8" 12'-7" 7'-9 3/4" 13'-1 1/2" 56'-6 1/2" 12'-8"15'-7 3/4" 10'-11 3/4" 4'-3 1/2" 12'-11 1/2" 56'-6 1/2"6'-11" 14'-8 1/2" 9'-11" 5'-3"42'-1" 13'-4 1/2"17'-7 1/2" 4'-9" 35'-9"6'-4"9'-1"1/8"3'-2 3/8"2'-5 1/8" CL 4'-8 7/8"10 5/8" 5'-7 1/2" CL 1'-5 1/2"CL 3'-10"1'-5"6'-8 1/2"3'-3 3/8"2'-2 1/2"1'-2 5/8" 6'-8 1/2" 111 SQ FT 27 SQ FT 298 SQ FT 192 SQ FT 175 SQ FT 333 SQ FT 180 SQ FT 147 SQ FT 8 SQ FT 18 SQ FT 4 SQ FT 44 SQ FT 19 SQ FT 20 SQ FT 114 SQ FT 53 SQ FT MASTER CLOSET MASTER BATH MASTER BDRM HALL OPEN BELOW BEDROOM 2 CLOSET CLOSET BEDROOM 3 ATTIC BEDROOM 4 LINENBATH CLOSET STORAGE VAULTED CLG CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET 8'0" CH AFF CARPET CHASE 8'0" CH AFF VINYL 8'0" CH AFF CARPET 8'0" CH AFF TILE 8'0" CH AFF CARPET Shelving E2E2 P2P2D2D2 D1D1 D2D2 D4D4 D3D3 P3P3 D4D4 D4D4 D4D4 H2H2 D1D1 D1D1 D1D1 D1D1 D1D1 D1D1 D5D5 EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING DEMO & PREP PLAN NOTES NOTE QTY DESCRIPTION 7 REMOVE ALL FLOORING DOWN TO SUBFLOOR AND PREP FOR NEW CARPET. 2 REMOVE EXISTING CABINETS, PLUMBING FIXTURES, COUNTERTOPS, AND MIRRORS. 1 REMOVE ALL DRYWALL NECESSARY FOR ELECTRICAL REWIRE 4 DEMO DOWN TO STUDS. 1 ATTIC - REMOVE ALL INSULATION & TRUSSWORK AS NECESSARY D1D1 D2D2 D3D3 D4D4 D5D5 D1D1 D2D2 D3D3 D4D4 D5D5 PLUMBING DEMO/DISCONNECT PLAN NOTES NOTE QTY DESCRIPTION 1 SEPARATE PLUMBING PERMIT NOT REQUIRED. 1 DISCONNECT PLUMBING LINES TO SINK, TOILET SHOWER AND TUB PRIOR TO DEMOLITION. STUB LINES IN FLOOR. 1 DISCONNECT PLUMBING LINES TO SINK, TOILET SHOWER AND TUB PRIOR TO DEMOLITION. REMOVE LINES COMPLETELY FROM FIRE DAMAGE. P1P1 P2P2 P3P3 P1P1 P2P2 P3P3 ELECTRICAL DEMO/DISCONNECT NOTES NOTE QTY DESCRIPTION 1 SEPARATE ELECTRICAL PERMIT NOT REQUIRED. 1 EXISTING ELECTRICAL IN WALLS TO BE DELETED PRIOR TO WALL DEMOLITION. E1E1 E2E2 E1E1 E2E2 HVAC DEMO/DISCONNECT NOTES NOTE QTY DESCRIPTION 1 SEPARATE HVAC PERMIT NOT REQUIRED. 1 EXISTING HVAC VENT LOCATIONS TO BE RELOCATED. H1H1 H2H2 H1H1 H2H2 SELVIO RESIDENCEFIRE RESTORATION3208 Maralice Dr.Carmel IN 46033Date:Revision : A5 SHEET OF 18 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 4622010/27/2021 DATE : [PRINTS TO SCALE IF PRINTED ON 24" X 36" ]DESIGNER: JONNI BERKLEYE: jonni@customlivingusa.comC: 317-801-3073SECOND FLOOR DEMO PLAN SCALE: 1/4" = 1' GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions. Homeowner understands that this will help to reduce airborne dust; however, it will not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of demolition denoted on the drawings. Any additional scope added or uncovered during demolition result in filing a Change Order during construction. Homeowners understand that demolition work will generate dust and noise throughout the house. Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. N 11/08/21