HomeMy WebLinkAboutS101.1DN
SB2421 SB24213DB1021
SB3721 SB3721
SB2421 SB2421 3DB1021
SB3721 SB3721
1623
D04
D02 D02 D03 D03
D04
D04
D01D01
D02
D02
FLOOR FLOOR
CEILING
CEILING
CEILING
FLOOR
cL cL
cL
cL
cL
cL cL
cL cL
GFCI
R
R
CO/SD
SD SD SD
R
GFCI
R
GFCI
R
56'-8 1/8"2'-8"8'-4 1/2"13'-8 1/2"6'-11" 3'-7 3/4"11' 5' 11'-0 3/4" 15'-0 1/4" 12'-4 1/4"10'9'-5 1/2"5'
7'-1" 10' 6'-8 1/2" 10' 8'
1'-7"
1'-7 1/4" 10'-4"1'-6"8'-10" 1'-8 1/2"1'-8 1/2"
5' 17'-3"
OPEN BELOW
J/J BATH
8'0" CH AFF
CARPET
8'0" CH
AFF
CARPET
8'0" CH
AFF
CARPET
CLOSET
BEDROOM 1
8'0" CH
AFF
CARPET
BATH
CLOSET
CLOSET
BATH
MASTER BATH
8'0" CH AFF
TILE
Shelving
CLOSET
HALL
8'0" CH AFF
CARPET
I1I1
I2I2
D2D2
D3D3
D4D4
D1D1
D5D5
ATTIC STORAGE
8'0" CH
AFF
CARPET
BEDROOM 2
BEDROOM 3
ATTIC
CHASEOPEN STORAGE OPEN STORAGE
FRAMING PLAN NOTES
NOTE QTY DESCRIPTION
1 RE-FRAME AS REQUIRED FROM FIRE DAMAGE
1 FRAME NEW SCISSOR TRUSS ROOF DECKING
1 FRAME NEW NON-LOAD BEARING INTERIOR WALLS
AS SHOWN ON PLAN.
F1F1
F2F2
F3F3
F1F1
F2F2
F3F3
INSULATION PLAN NOTES
NOTE QTY DESCRIPTION
1
FOAM AND FIRE CAULK ALL NEW WALLS TO MEET
MUNICIPAL FIRE CODE REQUIREMENTS. FINAL INSULATION
SCOPE TO BE DETERMINED ON A FIELD WALK FOLLOWING
MECHANICAL ROUGH-INS.
1 PROVIDE AND INSTALL EXTERIOR WALL AND ATTIC
INSULATION PER CODE.
I1I1
I2I2
I1I1
I2I2
DRYWALL PLAN NOTES
NOTE QTY DESCRIPTION
1 ALL NEW DRYWALL ON WALLS AND CEILING AS REQUIRED
FOR NEW ADDITION.
1 INSTALL DRYWALL ON NEW FRAMED WALLS. MATCH
EXISTING FINISH LEVEL.
1 PATCH AND REPAIR CEILING DRYWALL AS NEEDED
BY DEMO
1 PATCH AND REPAIR DRYWALL AS NEEDED FROM
CABINET REMOVAL.
1 REFRAME AND PATCH WALL AS NEEDED FROM
DEMO
D1D1
D2D2
D3D3
D4D4
D5D5
D1D1
D2D2
D3D3
D4D4
D5D5
DOOR SCHEDULE
NUMBER FLOOR QTY R/O TOP WIDTH HEIGHT DESCRIPTION SUPPLIER
D01 2 2 62"X82 1/2" 80" 60 " 80 " DOUBLE HINGED-PANEL
D02 2 4 32"X82 1/2" 80" 30 " 80 " HINGED-PANEL
D03 2 2 34 1/2"X82 1/2" 80" 32 1/2 " 80 " HINGED-PANEL
D04 2 3 26"X82 1/2" 80" 24 " 80 " HINGED-PANEL
EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
SELVIO RESIDENCEFIRE RESTORATION3208 Maralice Dr.Carmel IN 46033Date:Revision
:
A8
SHEET OF 18
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts, and ideas
forming a part of the plans and the selection and arrangement
thereof are Copyright 2018 of Custom Living, Inc., Indianapolis,
IN. ALL RIGHTS RESERVED. The plans shall remain the
property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc.
is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 4622010/27/2021
DATE
:
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: JONNI BERKLEYE: jonni@customlivingusa.comC: 317-801-3073PROPOSED 2ND FLOOR PLAN
SCALE: 1/4" = 1'
GENERAL PROPOSED PLAN NOTES
Framing contractors are responsible for all labor,
for the scope of work specified on the drawings
provided by Custom Living.
Owner understands that Custom Living has only
provided a labor and material allowance for the
scope of Rough Carpentry work specified on the
drawings. Any additional work added or
uncovered during this scope will be filed as a
Change Orde r during construction
Owner understands that the drywall allowance is
based on an estimated board count and square
footage take-off. A final walk through with a
drywall contractor after framing and mechanical
rough-ins will be necessary to finalize drywall
installation and finish budgets.
Final drywall touch-ups will follow countertop
installation.