Loading...
HomeMy WebLinkAboutGN010.3 1st fl TrussBBO1 BBO3 FE01 FG01 F02 F02 F04 F05 FG02 FG02 FG03 FE01 F01 F01 F07 F07 F07 F01 F01 F01 FG04F09 FG05 FG06F10 FG07F11F12 FE01 FG01 F02 F02 F03 F04 F05 FG02 FG02 FG03 FE01 F01 F01 F07 F07 F07 F01 F01 F01 FG04F09 FG05 FG06F10 FG07F11F12F01(7)F08(4)F03(4)F01(4)F08(4)F01(4)F03(3)F01(7)F06(4)F06(4)1317 N.Owen Street Rensselaer,IN 47978 1-800-866-7658 Designer:Lanie Gradjan JOB NAME: CUSTOMER NAME: Provenance 3 Story Townhomes Contract Lumber JOB#:REN0-046176 DATE:3/5/2021 JOB NOTES: Preliminary truss plan not for construction Please see the notes on this drawing for more information. Beams are by others. Trusses are 24"on center except as shown on this drawing. General Notes: THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designedas individual building components to be incorporatedinto the building design at the specification of theBuilding Designer whoseresponsibilities include;the designand bracingof the overall structure,any supporting structureincludingthewalls,headers,beams and columns and the permanentbracing of the roof and floor system.The General Contractorand/or theiragents are responsible for;the verification ofall dimensions,assuring thatany conventional framing shall uniformly transfer the loads tothe trusses below, the temporary bracing ofthe truss system as well asthe permanent web bracing shownon the individual trussdrawing sheetsforthe truss designs identified on this placementplan. For general guidance regarding bracing,consult"Bracing of Wood Trusses"available from the Truss Plate Institute583 D'Onofrio Drive,Madison,WI 53179. COMPANY, INC. STARK TRUSS