HomeMy WebLinkAboutGN010.4 2nd fl TrussBBO2 BBO4
FE02
F13
F13
F13
F15
F15
F13
F13
F01
F01
FG08
FG08
F01
FG09
F18
F18
F02
F02
F02
F03
F03
F02
F02
FG10FG11F17
FG15
FG14 FG13FG12FG18
FG16
FG19FG17RB2RB3
FE02
F13
F13
F13
F15
F15
F13
F13
F01
F01
FG08
FG08
F01
FG09
F18
F18
F02
F02
F02
F03
F03
F02
F02
FG10FG11F17
FG15
FG14 FG13FG12FG18
FG16
FG19FG17RB7RB8GE01GE01GE01GE01
F06(4)F14(4)F18(10)F14(4)F18(10)F06(4)T01(5)T01(6)
T02(10)
T01(6)T01(5)
T02(6)T02(4)
1317 N.Owen Street
Rensselaer,IN 47978
1-800-866-7658
Designer:Lanie Gradjan
JOB NAME:
CUSTOMER NAME:
Provenance 3 Story
Townhomes
Contract Lumber
JOB#:REN0-046176
DATE:3/5/2021
JOB NOTES:
Preliminary truss plan not
for construction
Please see the notes on
this drawing for more
information.
Beams are by others.
Trusses are 24"on center
except as shown on this
drawing.
General Notes:
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.
These trusses are designedas individual building components
to be incorporatedinto the building design at the specification
of theBuilding Designer whoseresponsibilities include;the
designand bracingof the overall structure,any supporting
structureincludingthewalls,headers,beams and columns and
the permanentbracing of the roof and floor system.The
General Contractorand/or theiragents are responsible for;the
verification ofall dimensions,assuring thatany conventional
framing shall uniformly transfer the loads tothe trusses below,
the temporary bracing ofthe truss system as well asthe
permanent web bracing shownon the individual trussdrawing
sheetsforthe truss designs identified on this placementplan.
For general guidance regarding bracing,consult"Bracing of
Wood Trusses"available from the Truss Plate Institute583
D'Onofrio Drive,Madison,WI 53179.
COMPANY, INC.
STARK
TRUSS