HomeMy WebLinkAboutGN010.2 Roof drawingG01
GE02
GE02
T03
T03
T03
G01GE03
GE04GE03T04T04T04T04T04GE03G01
G01
GE02
GE02 GE03GE03T03
T03 GE03T03 T04T04T04T04GE04T04T04V01
V02
V03
V04
V05
V06
V07
V01
V02
V03
V04
V05
V06
V07
V01
V01
V02
V02
V03
V03
V04
V04
V05
V05
V06
V06
V07
V07T03(4)T04(10)T04(5)T03(2)T03(2)T04(2)T04(2)T04(10)
1317 N.Owen Street
Rensselaer,IN 47978
1-800-866-7658
Designer:Lanie Gradjan
JOB NAME:
CUSTOMER NAME:
Provenance 3 Story
Townhomes
Contract Lumber
JOB#:REN0-046176
DATE:3/5/2021
JOB NOTES:
Preliminary truss plan not
for construction
Please see the notes on
this drawing for more
information.
Beams are by others.
Trusses are 24"on center
except as shown on this
drawing.
General Notes:
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.
These trusses are designedas individual building components
to be incorporatedinto the building design at the specification
of theBuilding Designer whoseresponsibilities include;the
designand bracingof the overall structure,any supporting
structureincludingthewalls,headers,beams and columns and
the permanentbracing of the roof and floor system.The
General Contractorand/or theiragents are responsible for;the
verification ofall dimensions,assuring thatany conventional
framing shall uniformly transfer the loads tothe trusses below,
the temporary bracing ofthe truss system as well asthe
permanent web bracing shownon the individual trussdrawing
sheetsforthe truss designs identified on this placementplan.
For general guidance regarding bracing,consult"Bracing of
Wood Trusses"available from the Truss Plate Institute583
D'Onofrio Drive,Madison,WI 53179.
COMPANY, INC.
STARK
TRUSS