Loading...
HomeMy WebLinkAboutGN010.2 Roof drawingG01 GE02 GE02 T03 T03 T03 G01GE03 GE04GE03T04T04T04T04T04GE03G01 G01 GE02 GE02 GE03GE03T03 T03 GE03T03 T04T04T04T04GE04T04T04V01 V02 V03 V04 V05 V06 V07 V01 V02 V03 V04 V05 V06 V07 V01 V01 V02 V02 V03 V03 V04 V04 V05 V05 V06 V06 V07 V07T03(4)T04(10)T04(5)T03(2)T03(2)T04(2)T04(2)T04(10) 1317 N.Owen Street Rensselaer,IN 47978 1-800-866-7658 Designer:Lanie Gradjan JOB NAME: CUSTOMER NAME: Provenance 3 Story Townhomes Contract Lumber JOB#:REN0-046176 DATE:3/5/2021 JOB NOTES: Preliminary truss plan not for construction Please see the notes on this drawing for more information. Beams are by others. Trusses are 24"on center except as shown on this drawing. General Notes: THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designedas individual building components to be incorporatedinto the building design at the specification of theBuilding Designer whoseresponsibilities include;the designand bracingof the overall structure,any supporting structureincludingthewalls,headers,beams and columns and the permanentbracing of the roof and floor system.The General Contractorand/or theiragents are responsible for;the verification ofall dimensions,assuring thatany conventional framing shall uniformly transfer the loads tothe trusses below, the temporary bracing ofthe truss system as well asthe permanent web bracing shownon the individual trussdrawing sheetsforthe truss designs identified on this placementplan. For general guidance regarding bracing,consult"Bracing of Wood Trusses"available from the Truss Plate Institute583 D'Onofrio Drive,Madison,WI 53179. COMPANY, INC. STARK TRUSS