HomeMy WebLinkAboutGN010.3 1st fl TrussBBO1 BBO3
FE01
FG01
F02
F02
F04
F05
FG02
FG02
FG03
FE01
F01
F01
F07
F07
F07
F01
F01
F01
FG04F09
FG05 FG06F10
FG07F11F12
FE01
FG01
F02
F02
F03
F04
F05
FG02
FG02
FG03
FE01
F01
F01
F07
F07
F07
F01
F01
F01
FG04F09
FG05 FG06F10
FG07F11F12F01(7)F08(4)F03(4)F01(4)F08(4)F01(4)F03(3)F01(7)F06(4)F06(4)1317 N.Owen Street
Rensselaer,IN 47978
1-800-866-7658
Designer:Lanie Gradjan
JOB NAME:
CUSTOMER NAME:
Provenance 3 Story
Townhomes
Contract Lumber
JOB#:REN0-046176
DATE:3/5/2021
JOB NOTES:
Preliminary truss plan not
for construction
Please see the notes on
this drawing for more
information.
Beams are by others.
Trusses are 24"on center
except as shown on this
drawing.
General Notes:
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.
These trusses are designedas individual building components
to be incorporatedinto the building design at the specification
of theBuilding Designer whoseresponsibilities include;the
designand bracingof the overall structure,any supporting
structureincludingthewalls,headers,beams and columns and
the permanentbracing of the roof and floor system.The
General Contractorand/or theiragents are responsible for;the
verification ofall dimensions,assuring thatany conventional
framing shall uniformly transfer the loads tothe trusses below,
the temporary bracing ofthe truss system as well asthe
permanent web bracing shownon the individual trussdrawing
sheetsforthe truss designs identified on this placementplan.
For general guidance regarding bracing,consult"Bracing of
Wood Trusses"available from the Truss Plate Institute583
D'Onofrio Drive,Madison,WI 53179.
COMPANY, INC.
STARK
TRUSS