Loading...
HomeMy WebLinkAboutGN010.2 Roof drawingG01 GE02 GE02 T03 T03 T03 G01GE03 GE04GE03T04T04T04T04T04GE03G01 G01 GE02 GE02 GE03GE03T03 T03 GE03T03 T04T04T04T04GE04T04T04V01 V02 V03 V04 V05 V06 V07 V01 V02 V03 V04 V05 V06 V07 V01 V01 V02 V02 V03 V03 V04 V04 V05 V05 V06 V06 V07 V07T03(4)T04(10) T04(5)T03(2) T03(2) T04(2) T04(2)T04(10) 1317N. OwenStreet Rensselaer, IN 47978 1-800-866-7658 Designer: Lanie Gradjan JOBNAME: CUSTOMER NAME: Provenance 3Story Townhomes Contract Lumber JOB#: REN0-046176 DATE: 3/5/2021 JOBNOTES: Preliminarytruss plan not for construction Please see the notes on this drawing for more information. Beams are byothers. Trusses are 24" on center except as shown on this drawing. General Notes: THISISATRUSSPLACEMENTDIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification ofthe Building Designerwhose responsibilities include; the designand bracing of the overall structure, anysupporting structureincluding thewalls, headers, beams and columns and the permanent bracing ofthe roofand floor system. The General Contractorand/ortheiragents are responsible for; the verification of all dimensions, assuring that anyconventional framing shall uniformlytransfer the loads to the trusses below, the temporarybracing of the truss system as well as the permanentweb bracing shown on the individual truss drawing sheets forthe truss designs identified on this placement plan. For general guidance regarding bracing, consult"Bracing of Wood Trusses" available from the Truss Plate Institute583 D'Onofrio Drive, Madison, WI 53179. COMPANY, INC. STARK TRUSS 11/14/21