Re: 2020 Road Bond Projects
Right of Way Services
Fee Proposal
Dear Jeremy:
EXHIBIT "A"
As we discussed, we have prepared this proposal to provide miscellaneous Right of Way Services for
various 2020 Road Bond Projects as directed by your department. CrossRoad Engineers will provide
these services in accordance with the previously approved contract #20-ENG-08 called Carmel 2020
Bond Program Management. All units cost items will be in accordance with said previous contract
and are attached hereto for reference.
Per your direction, we are requesting a contract ceiling of $100,000 against which we would invoice
for the various above referenced projects.
We would like to thank you for this opportunity to continue our involvement in enhancing the City of
Carmel and we appreciate the City's trust in our ability to provide these services. We look forward to
working closely with you to make these 2020 Road Bond projects a success!
If you should have any questions or need any further information, please do not hesitate to call me
at (317) 780-1555 ext. 114.
Sincerely,
CrossRoad Engineers, PC
1.Z.e?Z
President
115N.17THAVENUE,BEE CHGROVE,IN4610 7 // 317.780.1555 II CROSSROADENGINEERS.COM
DocuSign Envelope ID: CB560541-FC79-43AA-9C48-019F6EC74DE1
DocuSign Envelope ID: 521 DC1 0B-8B03-42A0-BE36-A82B7O63A91A
EXHIBIT "A"
Page 2 of 5
2020 Road Bond
R/W ENGINEERING & ACQUISITION SERVICES
PROPOSED SERVICES
CrossRoad Engineers, PC will provide R/W Engineering and Acquisition services for any right of
way and/or easement parcels necessary for the construction of the projects included in the 2020
Road Bond Program. We will utilize subconsultants to provide some of these services. For
example, title research and appraisal services will be subcontracted. Depending upon workloads,
we will perform some of the buying functions in-house while some will be performed by
subconsultants. The specific services included, as well as the proposed fees for those services,
are listed below.
PROPOSED FEES
ABSTRACTING Ill
Title & Encumbrance Report (20 year Residential)
Title & Encumbrance Report (20 year Commercial)
Title & Encumbrance Report (20 year Municipal)
Temporary Report
Title Update
RIGHT OF WAY ENGINEERING
R/W Engineering (Platted Area)
R/W En gineering (Non-Platted Area)
Preparation of Land Plat
Prep aration of Legal Description
APPRAISAL PROBLEM ANALYSIS <1 1
Appraisal Problem Analysis
APPRAISING (ll
Appraisals
REVIEW APPRAISING (l)
Review Appraisals
BUYING (l)
Buying
375 Per Report
450 Per Report
500 Per Report
150 Per Report
150 Per Report
880 Per Parcel
1,430 Per Parcel
550 Per Parcel
550 Per Description
See Attached Fee Schedule
See Attached Fee Schedule
See Attached Fee Schedule
See Attached Fee Schedule
Note: An OWNER-directed second or subsequent offer shall be considered a new parcel.
DocuSign Envelope ID: CB560541-FC79-43AA-9C48-019F6EC74DE1
DocuSign Envelope ID: 521DC1 OB-8803-42AO-BE36-A8287063A91A
TITLE INSURANCE Ul
EXHIBIT "A"
Page 3 of 5
Title Insurance Policy (parcels over $25k)
DEED RECORDATION
Deed Recordation (Includes Title and Document Review)
PARTIAL MORTGAGE RELEASE & RECORDATION l2l
Partial Mortgage Release & Recordation
RIGHT OF WAY MANAGEMENT
R/W Management
Actual Cost + 10%
350 Per Parcel
Actual Cost + 10%
1,200 Per Parcel
These fees shall be paid in accordance with the following partial payment schedule for locally funded projects:
R/W Management for Appraisal 60% of total fee per parcel
R/W Management for Buying 40% of total fee per parcel
These fees shall be paid in accordance with the following partial payment schedule for federally funded projects:
R/W Management for APA 5% of total fee per parcel
R/W Management for Appraisal 50% of total fee per parcel
R/W Management for Review Appraisal 20% of total fee per parcel
R/W Management for Buying 25% of total fee per parcel
R/W Staking 13 >
Right of Way Staking
Utility Staking 141
Right of Way Staking for Utilities
600 Per Parcel
Hourly Basis
1)This is a subcontracted item and the fee shown here is estimated. The final cost will consist of the actual
invoiced amounts from the subcontractor plus a 10% mark-up for task coordination and administrative efforts.
ii These are fees that will be incurred for partial mortgage releases, recordings, etc., and the fee is u n kn own. The
final cost will consist of the actual fees charged plus a 10% mark-up for task coordination and administrative
efforts.
3) CrossRoad Engineers will provide field staking for the proposed right-of-way and/or easement parcelsifrequestedbytheCityorifrequestedbyeithertheappraisingorbuyingsubconsultantsprovidingservicesonanyofthebondprojects. This work will include adequate field staking to identify the proposed right-of-way and/oreasements. Only those parcels actually staked will be invoiced.
4) At the request of the City, we will provide any additional right of way staking that may be required by the various
utility companies in order to expedite utility relocation efforts prior to construction within the bond areas. This field
work for utility relocations will be provided on an hourly basis in accordance with our schedule of HourlyBillingRates. Our current schedule is attached.
DocuSign Envelope ID: CB560541-FC79-43AA-9C48-019F6EC74DE1
DocuSign Envelope ID: 521DC108-8803-42A0-BE36-A8287D63A91A
Re
A raisal Problem
EXHIBIT"A"
Page 4 of 5
Appraisal Services
Short Form: Commercial / Industrial/ Multi-Family/ Special/ Billboard ( with affected
im rovements or a total take
Excess land A raisal
Review Appraisal Services
roved
Short Form: Commercial/ Industrial/ Multi-Family/ Special/ Billboard ( with affected
i ovements or
Lo Form: Commercial/ Industrial/ Multi-Famil / S ecial Im roved
Buying Services
Report Type
Total/ Partial Acquisition
Temporary/ Ac cess Rights
Per Parcel Fee
255
680
1,930
2,835
3,175
4,530
3 405
4,530
11,340
650
Per Parcel Fee
410
970
1,360
1,535
2,1 60
1,620
2,160
5,220
Per Parcel Fee
2,030
1,695
DocuSign Envelope ID: CB560541-FC79-43AA-9C48-019F6EC74DE1
DocuSign Envelope ID: 521DC10B-8B03-42A0-BE36-A82B7D63A91A
EXHIBIT"A"
Page 5 of 5
HOURLY BILLING RATES
PERSONNEL CLASSIFICATION
DESIGN
Director
Senior Project Manager
Project Manager
Project Engineer
Assistant Project Engineer
CAOD Manager
CAOD Technician
Assistant CADD Technici an
R/W Manager
R/W Appraiser
R/W Buyer
INSPECTION
Director
Resident Project Representative
Asst Resident Project Representative
Project Inspector
Assistant Project Inspector
SURVEY
Survey Manager
Assistant Survey Manager
Survey Crew - 1 Man
Crew Chief
Field Man
Researcher
Survey Technician
MISCELLANEOUS
Mileage (per mile)
Other Direct Costs
HOURLY RATE
160.00
140.00
125.00
110.00
95.00
110.00
95.00
80.00
155.00
155.00
155.00
160.00
125.00
115.00
110.00
85.00
130.00
100.00
115.00
95.00
75.00
85.00
95.00
Current IRS Rate
at cost +15%
Rates Effective through December 2021
CROSSROAD EN&INEERS, PC
3417 SHERMAN DR, BEECH GROVE, IN 46107 II 317.780.1555 II CROSSROADENGINEERS.COM
DocuSign Envelope ID: CB560541-FC79-43AA-9C48-019F6EC74DE1
DocuSign Envelope ID: CB560541-FC79-43AA-9C48-019F6EC74DE1