HomeMy WebLinkAboutDrainage Report
DRAINAGE REPORT
FOR
NEW CONVENIENCE STORE / FOOD MART
2425 HARLESTON STREET
CARMEL, INDIANA
November, 2021
PREPARED BY:
Total Engineering Solutions Co., LLC
9955 Crosspoint Blvd., Suite 100
Indianapolis, IN 46256
TECHNICAL DRAINAGE REPORT
TABLE OF CONTENTS
ITEM PAGE
Project Narrative & Calculations 1-5
Hydrograph Summary Report and Hydrographs 6-21
Soils Map 22-24
Flood Plain (FIRM) Map 25
DRAINAGE REPORT
FOR
CONVENIENCE STORE / FOOD MART
2425 HARLESTON DRIVE
CARMEL, IN
PROJECT NARRATIVE:
This project consists of the construction of a 4223 sft. convenience store, a dumpster enclosure,
gas pumps, concrete sidewalk and asphalt pavement on a 1.1-acre parcel. Street parking will be
constructed north of the site along Harleston Drive, and two entrances are planned, one from
Harleston Drive and another, one-way (south) entrance/exit from Towne Road.
The site is part of the Village of West Clay PUD and is included in the Master Drainage Report
and stormwater detention system. The project will disturb approximately 0.81 acres of the 1.1-
acre parcel. The project will disturb approximately 0.81 acres of the 1.1-acre parcel.
EXISTING CONDITIONS:
The existing property is a grass field at the southwest corner of Harleston Drive & Towne Road,
which sheet drains primarily to the east, into an existing storm sewer system along Towne Road.
The public storm sewer system discharges to a regional detention basin north of the site which is
located north of the site.
Per the original Village of West Clay master drainage report, the storm sewer system and regional
stormwater detention pond was designed based on an NRCS curve number of 88 on the project
site.
Site Soils
Site soils within the property and project area are classified as Brookston silty clay loam-Urban
land complex (YbvA), which is a Group B soil, and Crosby silt loam, fine-loamy subsoil-Urban
land complex (YclA), which is a Group C soil.
Predicted Storm Runoff
As predicted from the attached Hydrographs (Rational Method), the pre-developed storm water
runoff rates are as follows:
Storm Event Basin 1
Q2 1.28 cfs
Q10 2.65 cfs
Q25 3.82 cfs
Q100 6.25 cfs
1 11/17/21
PROPOSED CONDITIONS:
The proposed site improvements will consist of a new 4223 sft. Convenience Store/Food Mart,
new parking area, concrete sidewalks, and a dumpster enclosure. As shown in the hydrographs
below, this increase in impervious area will also result in an increase in peak stormwater runoff
(0.53 cfs at a 100 year storm event).
Stormwater runoff will sheet drain into a new storm sewer system, which will convey stormwater
into a mechanical pollutant-filtering unit, followed by a second unit to remove any remaining
suspended solids.
Using the rational method, the stormwater runoff from the post-developed site, as predicted by the
Hydrographs attached, is as follows:
Storm Event Basin 1 Post-Developed
Q2 2.05 cfs (vs. 1.28 cfs pre-developed)
Q10 3.67 cfs (vs. 2.65 cfs pre-developed)
Q25 4.95 cfs (vs 3.82 cfs pre-developed)
Q100 7.46 cfs (vs 6.25 cfs pre-developed)
In order to determine whether or not additional on-site stormwater detention is needed to
supplement the regional basin, the NRCS curve number for the developed site needs to be
calculated and compared to the Cn of 88 predicted. As shown in the calculations below, the
developed site as proposed will result in a weighted curve number (Cn) of 84.1 which is less than
the 88 assumed. Therefore, no additional on-site detention is required or proposed for the project.
Storm Water Quality
The project will disturb a total of 0.81 acres and under current ordinances and standards of the City
of Carmel, must include stormwater quality measures for treating runoff.
After evaluating several alternatives to meeting the storm water treatment requirements, we have
proposed the use of a flow through type hydro-dynamic separator type unit, specifically an Aqua-
Swirl model AS-2 installed in conjunction with an Aqua-Filter Model AF-X.2 unit which will
provide additional treatment and filtering including for potential hydrocarbons which may be
found in the stormwater runoff due to the gas station pumps and potential for minor spills. The
two units will be installed to collectively make up a stormwater treatment train that meets the City
of Carmel’s stormwater ordinance requirements.
As shown in flow through BMP calculations below and the BMP Hydrograph included in this
report, the, first flush rain event rate required to be treated by the BMP is 0.932 cfs. The selected
treatment units were sized by the manufacturer to adequately treat this peak flow rat
2 11/17/21
SUMMARY AND CONCLUSIONS:
The proposed project will disturb approximately 0.81 acres of the 1.10 acre site and the new
development will significantly increase the hard surface (impervious) area of the current property.
The developed site will result in a stormwater runoff curve of 84.1 which is below the 88 number
predicted by the original Village of West Clay master drainage report. Therefore, the existing
storm sewer system and off-site regional detention pond located north of the site is adequately
sized to receive and store the peak stormwater runoff from the site.
The project will include a stormwater quality measure (BMP) train including both a hydro-
dynamic separator and filtration units treat the Stormwater Quality Volume from the site. With the
addition of stormwater treatment, the proposed improvements will have no adverse impacts to the
downstream stormwater infrastructure.
3 11/17/21
DRAINAGE CALCULATIONS
Existing (Pre-Developed) Conditions
The pre-developed project includes the 1.1-acre parcel. A summary of the current land use
designations is as follows:
Description Total Area Grass Grass Gravel
Basin #1 1.10 Acres 0.435 Acres 0.465 Acres 0.20 Acres
(Type B Soil) (Type C Soil)
Existing Basin #1 Runoff (SCS Method)
Q= CiA where C= Weighted Curve No.Cn
Cn = (0.435 x 69)+(0.465 x 79) + (0.20 x 85)/1.10 = 76.1
Time of Concentration (Tc) = 5 minutes
Storm Event Basin 1
Q2 1.28 cfs
Q10 2.65 cfs
Q25 3.82 cfs
Q100 6.25 cfs
Post Developed Conditions
The pre-developed project includes the 1.1-acre parcel. A summary of the current land use
designations is as follows:
Description Total Area Grass Grass Pavement Roof
Basin #1 1.10 Acres 0.290 Acres 0.186 Acres 0.52 Acres 0.096 Acres
(Type B Soil) (Type C Soil)
Post-Developed Basin #1 Runoff (SCS Method)
Q= CiA where C= Weighted Curve No.Cn
Cn = (0.290 x 61)+(0.190 x 74) + (0.520 x 98) + (0.100 x 98)/1.10 = 84.1
Time of Concentration (Tc) = 5 minutes
Storm Event Basin 1
Q2 2.05 cfs
Q10 3.67 cfs
Q25 4.95 cfs
Q100 7.46 cfs
4 11/17/21
FLOW THROUGH BMP SIZING:
Contributing Drainage Area = 1.10 Acres
Percent Impervious Area: 0.616/1.10 = 0.560 (56.0%)
Water Quality Curve Number: CNwq = 95 (From Exhibit 701-1)
Based on a 1” Rain Event, 24 Hour storm, and Type II distribution, the Peak Storm Water Quality
Volume as provided by the BMP Hydrograph = 0.932 cfs.
5 11/17/21
611/17/21
711/17/21
811/17/21
911/17/21
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft)(ft)(cuft)
1 SCS Runoff 1.281 3 720 2,970 ------ ------------ Basin 1 Pre-Developed (Target Q)
2 SCS Runoff 2.054 3 717 4,647 ------------------ Basin 1 Post Developed
21043 Storm Hydrograph.gpw Return Period: 2 Year Wednesday, 11 / 17 / 2021
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
10 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 1
Basin 1 Pre-Developed (Target Q)
Hydrograph type = SCS Runoff Peak discharge = 1.281 cfs
Storm frequency = 2 yrs Time to peak = 12.00 hrs
Time interval = 3 min Hyd. volume = 2,970 cuft
Drainage area = 1.100 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 2.66 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.440 x 69) + (0.470 x 79) + (0.200 x 85)] / 1.100
0 3 6 9 12 15 18 21 24 27
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (hrs)
Basin 1 Pre-Developed (Target Q)
Hyd. No. 1 -- 2 Year
Hyd No. 1
11 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 2
Basin 1 Post Developed
Hydrograph type = SCS Runoff Peak discharge = 2.054 cfs
Storm frequency = 2 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 4,647 cuft
Drainage area = 1.100 ac Curve number = 84*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 7.00 min
Total precip. = 2.66 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.520 x 98) + (0.100 x 98) + (0.290 x 61) + (0.190 x 74)] / 1.100
0 3 6 9 12 15 18 21 24 27
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (hrs)
Basin 1 Post Developed
Hyd. No. 2 -- 2 Year
Hyd No. 2
12 11/17/21
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft)(ft)(cuft)
1 SCS Runoff 2.646 3 717 6,025 ------ ------------ Basin 1 Pre-Developed (Target Q)
2 SCS Runoff 3.673 3 717 8,318 ------------------ Basin 1 Post Developed
21043 Storm Hydrograph.gpw Return Period: 10 Year Wednesday, 11 / 17 / 2021
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
13 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 1
Basin 1 Pre-Developed (Target Q)
Hydrograph type = SCS Runoff Peak discharge = 2.646 cfs
Storm frequency = 10 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 6,025 cuft
Drainage area = 1.100 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.83 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.440 x 69) + (0.470 x 79) + (0.200 x 85)] / 1.100
0 3 6 9 12 15 18 21 24 27
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (hrs)
Basin 1 Pre-Developed (Target Q)
Hyd. No. 1 -- 10 Year
Hyd No. 1
14 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 2
Basin 1 Post Developed
Hydrograph type = SCS Runoff Peak discharge = 3.673 cfs
Storm frequency = 10 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 8,318 cuft
Drainage area = 1.100 ac Curve number = 84*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 7.00 min
Total precip. = 3.83 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.520 x 98) + (0.100 x 98) + (0.290 x 61) + (0.190 x 74)] / 1.100
0 3 6 9 12 15 18 21 24 27
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (hrs)
Basin 1 Post Developed
Hyd. No. 2 -- 10 Year
Hyd No. 2
15 11/17/21
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft)(ft)(cuft)
1 SCS Runoff 3.822 3 717 8,635 ------ ------------ Basin 1 Pre-Developed (Target Q)
2 SCS Runoff 4.946 3 717 11,288 ------------------ Basin 1 Post Developed
21043 Storm Hydrograph.gpw Return Period: 25 Year Wednesday, 11 / 17 / 2021
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
16 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 1
Basin 1 Pre-Developed (Target Q)
Hydrograph type = SCS Runoff Peak discharge = 3.822 cfs
Storm frequency = 25 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 8,635 cuft
Drainage area = 1.100 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.72 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.440 x 69) + (0.470 x 79) + (0.200 x 85)] / 1.100
0 3 6 9 12 15 18 21 24 27
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (hrs)
Basin 1 Pre-Developed (Target Q)
Hyd. No. 1 -- 25 Year
Hyd No. 1
17 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 2
Basin 1 Post Developed
Hydrograph type = SCS Runoff Peak discharge = 4.946 cfs
Storm frequency = 25 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 11,288 cuft
Drainage area = 1.100 ac Curve number = 84*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 7.00 min
Total precip. = 4.72 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.520 x 98) + (0.100 x 98) + (0.290 x 61) + (0.190 x 74)] / 1.100
0 3 6 9 12 15 18 21 24
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (hrs)
Basin 1 Post Developed
Hyd. No. 2 -- 25 Year
Hyd No. 2
18 11/17/21
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft)(ft)(cuft)
1 SCS Runoff 6.245 3 717 14,151 ------ ------------ Basin 1 Pre-Developed (Target Q)
2 SCS Runoff 7.462 3 717 17,327 ------------------ Basin 1 Post Developed
21043 Storm Hydrograph.gpw Return Period: 100 Year Wednesday, 11 / 17 / 2021
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
19 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 1
Basin 1 Pre-Developed (Target Q)
Hydrograph type = SCS Runoff Peak discharge = 6.245 cfs
Storm frequency = 100 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 14,151 cuft
Drainage area = 1.100 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.46 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.440 x 69) + (0.470 x 79) + (0.200 x 85)] / 1.100
0 3 6 9 12 15 18 21 24 27
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (hrs)
Basin 1 Pre-Developed (Target Q)
Hyd. No. 1 -- 100 Year
Hyd No. 1
20 11/17/21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 11 / 17 / 2021
Hyd. No. 2
Basin 1 Post Developed
Hydrograph type = SCS Runoff Peak discharge = 7.462 cfs
Storm frequency = 100 yrs Time to peak = 11.95 hrs
Time interval = 3 min Hyd. volume = 17,327 cuft
Drainage area = 1.100 ac Curve number = 84*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 7.00 min
Total precip. = 6.46 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.520 x 98) + (0.100 x 98) + (0.290 x 61) + (0.190 x 74)] / 1.100
0 3 6 9 12 15 18 21 24
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (hrs)
Basin 1 Post Developed
Hyd. No. 2 -- 100 Year
Hyd No. 2
21 11/17/21
Soil Map—Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/14/2021
Page 1 of 344253104425320442533044253404425350442536044253704425380442539044254004425310442532044253304425340442535044253604425370442538044253904425400567930567940567950567960567970567980567990568000568010568020568030568040568050568060568070568080
567930 567940 567950 567960 567970 567980 567990 568000 568010 568020 568030 568040 568050 568060 568070 568080
39° 58' 33'' N 86° 12' 16'' W39° 58' 33'' N86° 12' 9'' W39° 58' 30'' N
86° 12' 16'' W39° 58' 30'' N
86° 12' 9'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 35 70 140 210
Feet
0 10 20 40 60
Meters
Map Scale: 1:727 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.2211/17/21
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Hamilton County, Indiana
Survey Area Data: Version 22, Sep 9, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 1, 2018—Sep
30, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/14/2021
Page 2 of 32311/17/21
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
YbvA Brookston silty clay loam-
Urban land complex, 0 to 2
percent slopes
1.2 50.9%
YclA Crosby silt loam, fine-loamy
subsoil-Urban land complex,
0 to 2 percent slopes
1.1 49.1%
Totals for Area of Interest 2.3 100.0%
Soil Map—Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/14/2021
Page 3 of 3
24 11/17/21
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 10/12/2021 at 1:38 PM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
86°12'31"W 39°58'48"N
86°11'54"W 39°58'21"N
Basemap: USGS National Map: Orthoimagery: Data refreshed October, 20202511/17/21