Loading...
HomeMy WebLinkAbout47AA - Lot Coverage Discussion2   From: Troy.tns@sbcglobal.net <troy.tns@sbcglobal.net>   Sent: Monday, July 26, 2021 4:03 PM  To: Conn, Angelina V <Aconn@carmel.in.gov>  Cc: 'Paul Owen' <powen@wedgewoodbc.com>  Subject: RE: 47AA ‐ permit (931 Auman Dr W)    These are the areas we used for calculations (attached and below):    Window well areas were not included in my calculations.  Did your office use the window well areas and counting them  as porches/patios?    It’s awfully close, I won’t deny that.  I may have rounded in our favor.  I’m working with the client to find ways to reduce  it further, but upon closer scrutiny we’re around 50 to 70 s.f. over (0.4%) (35.4) not 270+ s.f. over at 37%.      Sincerely,      Troy        True North Land Planning - Site Design - Surveying Troy A. Terew, PLS 3 Troy@Truenorthindy.com Ph:(317)-841-8754  Fax:(317)-841-8762    From: Conn, Angelina V <Aconn@carmel.in.gov>   Sent: Monday, July 26, 2021 3:42 PM  To: Troy.tns@sbcglobal.net  Cc: 'Paul Owen' <powen@wedgewoodbc.com>  Subject: RE: 47AA ‐ permit (931 Auman Dr W)    Hi, Troy –   If you can provide the building permit plan reviewer with your AutoCAD calculations and breakdowns of pervious areas  vs. non pervious, that would be helpful to them.   I was just using a measure tool in Adobe. I was asked by Paul to take a look at this and try to figure out why they are  exceeding 35%...    Angie Conn, AICP  |  Planning Administrator  City of Carmel Planning & Zoning Dept.  1 Civic Square, 3rd Flr., Carmel, IN 46032  O: 317‐571‐2417  |  W:  carmeldocs.com     From: Troy.tns@sbcglobal.net <troy.tns@sbcglobal.net>   Sent: Monday, July 26, 2021 3:35 PM  To: Conn, Angelina V <Aconn@carmel.in.gov>  Cc: 'Paul Owen' <powen@wedgewoodbc.com>  Subject: RE: 47AA ‐ permit (931 Auman Dr W)    Angie:    Are you counting window well areas?  They aren’t solid bottoms, they absorb water.  I was within rounding distance of  35% then 36% and certainly not 37% using AutoCAD to calculate.  Now, if you were counting in window wells, that’ll  push me towards 36%.        Sincerely,      Troy    True North Land Planning - Site Design - Surveying Troy A. Terew, PLS Troy@Truenorthindy.com  Ph:(317)-841-8754  Fax:(317)-841-8762    From: Conn, Angelina V <Aconn@carmel.in.gov>   Sent: Monday, July 26, 2021 2:58 PM  To: Paul Owen <powen@wedgewoodbc.com>; Gary McNutt <gmcnutt@wedgewoodbc.com>; Andrew Lund  <alund@wedgewoodbc.com>; Troy.tns@sbcglobal.net  Cc: Brad Love <blove@wedgewoodbc.com>  Subject: RE: 47AA ‐ permit (931 Auman Dr W)    Hi, Paul –  4 I am also coming up with a lover cover that is greater than 35%, closer to 37%.  All impervious surfaces count towards  that calculation.   …what is the patio area made of, and is it covered with a roof or is it open air?    Angie Conn, AICP  |  Planning Administrator  City of Carmel Planning & Zoning Dept.  1 Civic Square, 3rd Flr., Carmel, IN 46032  O: 317‐571‐2417  |  W:  carmeldocs.com     From: Paul Owen <powen@wedgewoodbc.com>   Sent: Monday, July 26, 2021 2:34 PM  To: Gary McNutt <gmcnutt@wedgewoodbc.com>; Andrew Lund <alund@wedgewoodbc.com>; Troy.tns@sbcglobal.net;  Conn, Angelina V <Aconn@carmel.in.gov>  Cc: Brad Love <blove@wedgewoodbc.com>  Subject: RE: 47AA ‐ permit    I do not know how the City is calculating that.      Hi Angie!  Can you help us figure out why the City is saying we are over?     Paul Owen Operations Manager Wedgewood Building Company 317-669-6315         https://www.uschamber.com/recoverynottaxes‐resource‐center    From: Gary McNutt <gmcnutt@wedgewoodbc.com>   Sent: Monday, July 26, 2021 2:17 PM  To: Paul Owen <powen@wedgewoodbc.com>; Andrew Lund <alund@wedgewoodbc.com>  Cc: Brad Love <blove@wedgewoodbc.com>  5 Subject: FW: 47AA ‐ permit  Importance: High    This Plot Plan shows 35% of impervious surface.  Doesn’t that meet the requirements.    From: Paul Owen <powen@wedgewoodbc.com>   Sent: Monday, July 26, 2021 12:43 PM  To: Greg Cradick <gcradick@wedgewoodbc.com>; Andrew Lund <alund@wedgewoodbc.com>; Brad Love  <blove@wedgewoodbc.com>; Gary McNutt <gmcnutt@wedgewoodbc.com>  Subject: FW: 47AA ‐ permit  Importance: High    Lot coverage issue?  Thoughts?      Paul Owen Operations Manager Wedgewood Building Company 317-669-6315         https://www.uschamber.com/recoverynottaxes‐resource‐center    From: Paul Ahrendt <pahrendt@wedgewoodbc.com>   Sent: Monday, July 26, 2021 10:03 AM  To: Andrew Lund <alund@wedgewoodbc.com>; Paul Owen <powen@wedgewoodbc.com>  Subject: RE: 47AA ‐ permit    Andrew – as promised, see specific markups    Paul – another issue on this one per CJ: “Lot coverage totals 36.17% exceeding the 35% maximum. Please review the  square footage reported on the application and on the plot plan to confirm and adjust accordingly.”