Loading...
HomeMy WebLinkAboutD-193 1979 Budget/SewerAN ORDINANCE BUDGETING EXPENDI','u~ES FROM THE CITY SEWAGE OPERATING AND DEPRECIATION FUND WI~EREAS, the Common Council of the City of Carmel is desireous of exercising it's statutory authority pursuant to IC 8-1-2-100 to request the Board of Public Works of the City of Carmel to "submit a budget of its financis~ needs for the ensui~ year to be set out in such detail as the m~uicipal council may direct" ~ and WHEREAS, the Con,non Council of the City of Carmel hereby proclaims that the submission of a comprehensive budget by the Board of Works to the Common Co~ucil for review and adoption greatly facilitates the Council's annual budgetary review and appropriation process; aud NOW, T~REFOEE, BE IT ORDAINED by the Common Coancil of the City of Carmel that; for the expenses of the City Sewage Operating and Depreciation Funds for the fiscal yea~ ending December 31, 1979, the following suns of money are hereby appropriated and ordered set apart out of the funds herein named and for the p~_rposes herein specified. Such suns herein appropriated shall be held to include all expenditures authorized to be n~de duri~ the year, unless otherwise expressly stipulated. Transfers m~y be made, by ordinance, from one classification to another at any regular public meeting. Projected fund balance ~nd revenue year 1979 - Operating account $625,551.00 Budget by accounts Collection System 701 Operation supervision & engineering 702 Operation labor 703 Operation supplies & expenses 703.1 Transportation 705 M~intenance sewer lines WastewaterPumpin~ 721 Operation supervision & engineeriD~ 722 Operation labor 723 Fuel for punpiD~ 724 Power for pumpiD~ 725 Supplies & expenses 727 M~intenance structures & improvements 728 M~intenance equipment 742 743.1 743.il 743.12 743.i3 743.14 Wastewater Treatment 741 Operation supervision & engineering Wastewater treatment labor Treatment supplies & expenses Chemicals Transportation Power Fuel 745 M~intenance of structures & improvements 746 M~intenance of plant equipment Total Total $ 22,040 32,35o 1,500 525* 1~00 57, 15 3,820 21,280 2OO 28,993 1,200 50o 4~000 59,993 20,345 120,505 10,000 30,162 2,500 72,242 25O 2,500 Page 2 Ordinance ~D-193 User's Accounting& Collection 780 Operation suporvision 781 Meter readi~& collecting 782 User's billi~& accounting 782.1 Computer expense 783 Miscellaneous expense 784 Uncollectable accounts Total 791 792 793 795 796 798 8OO 801 801.1 8o2 $ 1,240 5,665 16,720 7,500 500 A~m~strative and General 790 Salaries of general officers 13,409 Other general office salaries 9,080 Expenses of general officers 200 Office supplies & expenses 8,000 Outside services 16,000 Legal services 4,000 Insurance ll,500 Employee welfare expenses & pension 29,440 Miscellaneous general expense 1,750 Transportation 400 Maintenance of general property 500 Total 109,779 ~o7 ~o't-ke~ ~,,,I,b~ Co~qy ge%~0,-~t i T~xes. 507.1 Employer's FICA 16,579 507.2 Unemployment Total 16,205 Total Operation, repair &maintenance projected Fund B~lance 12-31-79 $555,675 75,000 Projected fund balance and revenue year 1979 - Depreciation~und Plus Interceptor Expansion Funds Budget by 100.1-311 311 311 312 313 323 323 323 324 324 $ 99,206 186,500 aocounts Sewer system rehabilitation $ 238,000 Less - 85% grant eligible ~) 42,500 Flow equalization basin 460,000 Less - 85% grant eligible (391,000) 69,000 Construction of 4" waste line to be extended to the new aerobic digester at south plant (excavation and air tools must be used) 8,000 3 generators at pumps of sewage works 1,100 Repair and re-tar control buildi~roof (north) 4,500 New return pumps for north plant & control valves(2) 4,500 Modification of south plant generator power in blower building - engineering & installation 10,000 Replace deseltzer pump (new pump with cutting chamber) 12,000 Office equipment (½ of total) 1,800 Communication equipment (½ of total) 1,400 Page 3 Ordinance #I~ DEPRECIATION FDIVD con't. 324.4 Sewer Cleaning Truck (½ of total) $ 10,000 324.3 100 ft. high pressure hose for sewer cleaner 500 324.3 G~s detector 1,800 Total Depreciation Fund'~ $ 252,977 This Ordinance shall be in full force and effect immediately after its passage by the Common Council and approval by the M~yor. I~ted this /~ day of December, 1978. Pres~din~ Officer Approved: Peggy Lou 8mit Albert B. Pick , M4yor ~ Clerk-Treasurer OFFICE OF THE CITY ENGINEER CITY OF CARMEL ALBERT B. PICKETT. MayOr' 130 1st AVENUE $.W. CARMEL, INDIANA 46032 December 18, '1978 MemO to: City Cou~cji and Mayor Pickett From: Fred Hohl, City Engineer Subject: Additions to sewe~ and water budgets The following items should be included in.the proposed budgets and were previously overlooked, or not yet available. Sewer Budget . 1. Carmel share of expenses Sewer Board. Acct No. # 807 $4,072.00 2. ~ of cost of vehicle mechanics ($3,750.00) .to be split between sewer 705.6 (60%)= $2250.00 703,1 (40%) = $1500-00 for Southern Hamilton County Regional included in 1979 salary budget accounts.- ~ 'of cost of. vehicle mechanic included in 1979 salary budget ($3,750.00} To be charged tO ACCT # 933 = $3,750.00 ~ Fred Hohl .City Engineer