Loading...
HomeMy WebLinkAboutGN013.4Grounding Diagram * Grounding Lugs and Wire are not required in systems using Enphase microinverters. UFO Clamp Fault Current Ground Path Min 10 AWG Copper Wire * Grounding Lug * Bonded Splice (Rail Connection) Last updated by Joel Walsman on 10/29/21 01:50 PM Page 5 of 6 Bob Gill (#842708) pitched roof 28357 INDUSTRIAL BLVD., HAYWARD, CA 94545 12/01/21