HomeMy WebLinkAboutP-101B - 1ST FLOOR PLUMBING PLAN - AREA Bx16x16
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
x15x15
x14x14
1.71.7
x13x13
x12x12
13.913.9
F.4
F.4 F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
14.9 14.9
13.1 13.1
12.212.2
11.511.5
FCO
FCO 5
6
1
6" ST
3
ST9
ST STSTSTCO
6" ST
6" ST
8" ST
10" ST
6" ST
1
2
6" ST
1
10" ST
5
64" V
3
11
11
9
10
7
WH-1
WH-1
9
HB-2
8
3"HD-2 4"FD-2
4"FD-2
4
4
12
12
3/4" CW
3" CW
3" CW
3/4" CW
3" CW
3/4" CW
STSTST4" ST
4" ST6" ST
4" ST
4" ST
4" ST
CO13
14
14
14
15
FCO
FCO
4" V
3" V
4" V
4" V
16 16 16
16
16
16
16
16 17
FCO
GENERAL PLUMBING NOTES:
A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS,
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
NOTE:
ALL ABOVE CEILING OR EXPOSED STORM, SANITARY WASTE, VENT AND CW
PIPING OFF THE FIRST AND SECOND FLOOR AREA TO BE PROVIDED WITH ZESTON
2000 SERIES INSULATION WITH PVC JACKET AND FITTING COVERS, COLOR GRAY.
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFES
S ION A L E N G INEERLICENSE EXPIRES 07/31/22
DATE SIGNED 11/24/21
R E G I S TER
E
D
I
ND I A N A
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID
PHASE III
P-101B
1ST FLOOR PLUMBING
PLAN - AREA B
09/17/1909/17/19
GRJK
0 16'8'4'
N
1/8" = 1'-0"
1ST FLOOR PLUMBING PLAN - AREA B1
SHEET PLAN NOTES
1 6"ST UP.
2 10"ST DOWN.
3 6"W UP AND DOWN.
4 4"W CAPPED FOR FUTURE USE.
5 4"V CAPPED FOR FUTURE USE.
6 4"V UP.
7 3"V FROM BELOW FLOOR.
8 3/4"CW DROP.
9 3"CW VALVE AND CAP FOR FUTURE USE.
10 3"CW FROM ABOVE.
11 3/4"CW DROP.
12 4"W DOWN, 4"V RISE.
13 6"ST DOWN.
14 4"ST UP, CONNECT TO EXPANSION GUTTER.
15 CONNECT 4" STORM DRAIN LINE TO EXPANSION GUTTER, DROP AND
TERMINATE 12" ABOVE FINISH GRADE OR SURFACE.
16 4"W UP AND DOWN.
17 3"W UP AND DOWN.
11/24/21 BUILDING SHELL
BID PHASE III