Loading...
HomeMy WebLinkAboutP-101B - 1ST FLOOR PLUMBING PLAN - AREA Bx16x16 H.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 x15x15 x14x14 1.71.7 x13x13 x12x12 13.913.9 F.4 F.4 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 14.9 14.9 13.1 13.1 12.212.2 11.511.5 FCO FCO 5 6 1 6" ST 3 ST9 ST STSTSTCO 6" ST 6" ST 8" ST 10" ST 6" ST 1 2 6" ST 1 10" ST 5 64" V 3 11 11 9 10 7 WH-1 WH-1 9 HB-2 8 3"HD-2 4"FD-2 4"FD-2 4 4 12 12 3/4" CW 3" CW 3" CW 3/4" CW 3" CW 3/4" CW STSTST4" ST 4" ST6" ST 4" ST 4" ST 4" ST CO13 14 14 14 15 FCO FCO 4" V 3" V 4" V 4" V 16 16 16 16 16 16 16 16 17 FCO GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. NOTE: ALL ABOVE CEILING OR EXPOSED STORM, SANITARY WASTE, VENT AND CW PIPING OFF THE FIRST AND SECOND FLOOR AREA TO BE PROVIDED WITH ZESTON 2000 SERIES INSULATION WITH PVC JACKET AND FITTING COVERS, COLOR GRAY. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S ION A L E N G INEERLICENSE EXPIRES 07/31/22 DATE SIGNED 11/24/21 R E G I S TER E D I ND I A N A 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID PHASE III P-101B 1ST FLOOR PLUMBING PLAN - AREA B 09/17/1909/17/19 GRJK 0 16'8'4' N 1/8" = 1'-0" 1ST FLOOR PLUMBING PLAN - AREA B1 SHEET PLAN NOTES 1 6"ST UP. 2 10"ST DOWN. 3 6"W UP AND DOWN. 4 4"W CAPPED FOR FUTURE USE. 5 4"V CAPPED FOR FUTURE USE. 6 4"V UP. 7 3"V FROM BELOW FLOOR. 8 3/4"CW DROP. 9 3"CW VALVE AND CAP FOR FUTURE USE. 10 3"CW FROM ABOVE. 11 3/4"CW DROP. 12 4"W DOWN, 4"V RISE. 13 6"ST DOWN. 14 4"ST UP, CONNECT TO EXPANSION GUTTER. 15 CONNECT 4" STORM DRAIN LINE TO EXPANSION GUTTER, DROP AND TERMINATE 12" ABOVE FINISH GRADE OR SURFACE. 16 4"W UP AND DOWN. 17 3"W UP AND DOWN. 11/24/21 BUILDING SHELL BID PHASE III