Loading...
HomeMy WebLinkAboutEP101A - 1ST FLOOR POWER PLAN - AREA AJ CR CR JCRJ J J CRCRJ CR S S SS S S CRCRJJ K J FFACPJ CRF H H F T CR S SSCR J CR J S S S S F F F J J K K S S S S SHSSS S S S S S S S S S S S S FF F F F F F CRCR CR CRDR DR CAM CAM CAM CAMCAMCAMCRH.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 x18x18 x18.1x18.1 x19x19 x20x20 x21x21 x21.1x21.1 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 x21.4x21.4 x21.5x21.5 x21.9x21.9 x22x22 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 20.7 20.7 19.7 19.7 19.4 19.4 F.4 F.4 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 20.5 20.5 19.5 19.5 F.10 F.10 H.2 H.2 21.2 21.2 HDP-B H1 H2 ATS EM H.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 x18x18 x18.1x18.1 x19x19 x20x20 x21x21 x21.1x21.1 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 x21.4x21.4 x21.5x21.5 x21.9x21.9 x22x22 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 20.7 20.7 19.7 19.7 19.4 19.4 F.4 F.4 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 20.5 20.5 19.5 19.5 F.10 F.10 H.2 H.2 21.2 21.2 DIRECTORY ACCESS CONTROL PANEL TELEPHONE TERMINAL BOARD (3) 4" UNDERGROUND CONDUITS FOR INCOMING TELECOMMUNICATIONS SERVICE CABLES. SEE CIVIL PLAN CC-1 1 2 3 4 5 1 6 7 8 8 8 9 9 9 99 9 9 10 10 10 ACCES CONTROL PANELS EWH-1 ? HP-CC-1 EUH-2 HP-CC-2 ? EUH-4 H1 - 1 H2 - 4,6 T1 - 2,4 DWBP-1 H1 - 5 H1 - 6 H2 - 5,7 H2 - 8,10 H2 - 9,11 H1- 13 H1- 14 H1- 62,64,66 H1- 18 H1- 18 H1- 3 H1- 16 H1- 17 H1- 18 H1- 3 H1- 18 H1- 18 H1- 15 H1- 14 H1- 15 HP-CC-4 H2 - 12,14 H1- 18 H1- 42 H1- 42 H1- 42 H1- 43 H1- 43 T1 H1- 14 EUH-2 H2 - 29,31 H2 - 30,32 EL-A CC-2 ? SE-1 9 H1-18 H1-18 ? H1- 43 11 12 13 14 8 8 H2-44 H2-45 8 8 H1-19 H2-49,51 H2-48,50 ROUTE 2"C W/ PULL STRING FOR TENANT TELECOM, ROUTE TO TELECOM SERVICE ENTRANCE. COORDINATE EXACT LOCATION WITH ARCHITECT/OWNER PRIOR TO ROUGH IN. 15 11 EWH-1 H1-2 H1- 65,67,69 EL-B X1 X2 HDP-A A. SEE SHEET E-001 FOR SYMBOLS AND ABBREVIATIONS. B. SEE SHEET E-604 FOR KITCHEN EQUIPMENT SCHEDULE. C. SEE SHEET E-604 FOR MECHANICAL EQUIPMENT POWER SCHEDULE. D. SEE SHEETS E-601 THROUGH E-603 FOR PANEL SCHEDULES. E. SEE SHEETS E-501, E-502 AND E-503 FOR ELECTRICAL DETAILS. F. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. G. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER. H. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT. I. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO BUILDING LINES. J. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. K. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND RAIN TIGHT. L. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT FURNISHED BY OTHERS. GENERAL SHEET NOTES 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans WayKEYPLAN B A NOT FOR CONSTRUCTION EP101A 1ST FLOOR POWER PLAN - AREA A 11/24/2111/24/21 N 0 16'8'4'1/8" = 1'-0" 1ST FLOOR POWER PLAN - AREA A1 SHEET PLAN NOTES 1 CONNECT CIRCUIT INDICATED TO BATTERY CHARGER THROUGH AUXILIARY CONTACTS IN DISCONNECT SWITCHES FOR EACH ELEVATOR. COORDINATE WORK WITH ELEVATOR INSTALLED. 2 ELEVATOR 3 FUSIBLE DISCONNECT SWITCH. 100A-3P, NEMA 1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 3 ELEVATOR CAB 3 FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 4 ELEVATOR 4 FUSIBLE DISCONNECT SWITCH. 100A-3P, NEMA 1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 5 ELEVATOR CAB 4 FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 6 ELEVATOR 5 FUSIBLE DISCONNECT SWITCH. 100A-3P, NEMA 1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 7 ELEVATOR CAB 5 FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 8 RECEPTACLE OUTLET MOUNTED IN ELEVATOR PIT. COORDINATE LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 9 DOOR SECURED THROUGH ACCESS CONTROL SYSTEM. 10 ACCESS CONTROL FOR ELEVATOR CAB. COORDINATE INTERFACE WIRING, ROUG-IN AND PROGRAMMING REQUIREMENTS WITH THE OWNER AND THE ELEVATOR CONTRACTOR. 11 12 ELEVATOR CAB 6 FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 13 ELEVATOR 7 FUSIBLE DISCONNECT SWITCH. 100A-3P, NEMA 1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 14 ELEVATOR CAB 7 FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 15 CONNECT FIRE ALARM SYSTEM TO EXISTING FIRE COMMAND CENTER IN CARMEL CITY CENTER. PROVIDE ALL CONDIT AND WIRE REQUIRED.11/24/2111/24/21 BUILDING SHELL BID PHASE III