HomeMy WebLinkAboutEP101B - 1ST FLOOR POWER PLAN - AREA BCRCRJ
CR
J
J
CR
JCR
J
S
S
SCRCRJJ
CR
JKK
J
J
F
F
S
CR
J
SSS
SSS
SS
SS
FF
FF
F
S
S
S
F
HH
DR
DRDR
CAM
CAMCAMC
A
M CAMx16x16
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
x15x15
x14x14
1.71.7
x13x13
x12x12
13.913.9
F.4
F.4 F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
14.9 14.9
13.1 13.1
12.212.2
11.511.5
MC-RES-BMC-RES-A MC-COMMERCIAL
x16x16
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
x15x15
x14x14
1.71.7
x13x13
x12x12
13.913.9
F.4
F.4 F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
14.9 14.9
13.1 13.1
12.212.2
11.511.5
1
2
3
45
6
7
8
7
7
7
7
6 8
DIRECTORY
ACCESS CONTROL
PANEL
EUH-2
EUH-4
EUH-4
EUH-2
EUH-2
HP-DS-1
HP-CC-3
EUH-1
CC-3
EUH-4
EUH-4
DS-1
H2 - 1,3
T1 - 6,8
T1 - 5,7
T1 - 10,12
H2 - 16
H2 - 18,20
H2 - 13,15
HDP-B - 4
T1 - 9,11
T1 - 1,3
H1- 20
H1- 22
H1- 22
H1- 22
H1- 21
H1- 22
H1- 23
H1- 23
H1- 24
H1- 24
H1- 23
H1- 23
H1- 24
H1- 24
H1- 24
H1- 24
H1- 45
H1- 45
H1- 45
H1- 45
H1- 44
H1- 44
H1- 44
6' - 1"
7
H1- 45
H2-53,55
H2-52,54
9
15' - 0 1/2"6' - 1"
1
E-307
A. SEE SHEET E-001 FOR SYMBOLS AND ABBREVIATIONS.
B. SEE SHEET E-604 FOR KITCHEN EQUIPMENT SCHEDULE.
C. SEE SHEET E-604 FOR MECHANICAL EQUIPMENT POWER SCHEDULE.
D. SEE SHEETS E-601 THROUGH E-603 FOR PANEL SCHEDULES.
E. SEE SHEETS E-501, E-502 AND E-503 FOR ELECTRICAL DETAILS.
F. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED
OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER.
USE STRANDED CONDUCTOR FOR LARGER SIZES.
G. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO
MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR
DESIGNER.
H. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES
AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT.
I. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO
BUILDING LINES.
J. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF
FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE
RESISTANCE OF MATERIALS AND CONSTRUCTION.
K. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND
RAIN TIGHT.
L. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL
INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT
FURNISHED BY OTHERS.
GENERAL SHEET NOTES
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans WayKEYPLAN
B
A
NOT FOR
CONSTRUCTION
EP101B
1ST FLOOR POWER
PLAN - AREA B
11/24/2111/24/21
0 16'8'4'
N
1/8" = 1'-0"
1ST FLOOR POWER PLAN - AREA B1
SHEET PLAN NOTES
1 CONNECT CIRCUIT INDICATED TO BATTERY CHARGER
THROUGH AUXILIARY CONTACTS IN DISCONNECT SWITCHES
FOR EACH ELEVATOR. COORDINATE WORK WITH ELEVATOR
INSTALLED.
2 ELEVATOR 1 FUSIBLE DISCONNECT SWITCH. 100A-3P, NEMA
1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S
REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR
CONTRACTOR PRIOR TO INSTALLING ROUGH-IN.
3 ELEVATOR CAB 1 FUSIBLE DISCONNECT SWITCH. 30A-1P,
NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH
ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN.
4 ELEVATOR 2 FUSIBLE DISCONNECT SWITCH. 100A-3P, NEMA
1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S
REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR
CONTRACTOR PRIOR TO INSTALLING ROUGH-IN.
5 ELEVATOR CAB 2 FUSIBLE DISCONNECT SWITCH. 30A-1P,
NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH
ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN.
6 RECEPTACLE OUTLET MOUNTED IN ELEVATOR PIT.
COORDINATE LOCATION WITH ELEVATOR CONTRACTOR
PRIOR TO INSTALLING ROUGH-IN.
7 DOOR SECURED THROUGH ACCESS CONTROL SYSTEM.
8 ACCESS CONTROL FOR ELEVATOR CAB. COORDINATE
INTERFACE WIRING, ROUG-IN AND PROGRAMMING
REQUIREMENTS WITH THE OWNER AND THE ELEVATOR
CONTRACTOR.
9 PROVIDE FIRE ALARM JUNCTION BOX ADJACENT TO TENANT SPACE ENTRY
WITH BUILDING FIRE ALARM SYSTEM INITIATION CIRCUIT AND ANNUNCIATION
CIRCUIT FOR FUTURE INTERCONNECTION OF TENANT FIRE ALARM DEVICES
OR CONTROL PANELS.11/24/2111/24/21 BUILDING SHELL
BID PHASE III