HomeMy WebLinkAboutEP102A - 2ND FLOOR POWER PLAN - AREA AJCR
KS
S
S
J
J
F
F
S
F
F F
S
F
F
SS
S
S
S
S
S
S
S S
S S S S
S S S
S S SS
S S SS
F
F F
F F
F S
CR
CR
DR
CR
CR
CAM
CAM
CAMCAMCAM
CAM CAMCR
DH
DH
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
x18x18
x18.1x18.1
x19x19
x20x20
x21x21
x21.1x21.1
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
x21.4x21.4
x21.5x21.5
x21.9x21.9
x22x22
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
20.7 20.7
19.7 19.7
19.4 19.4
F.4
F.4 F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
20.5 20.5
19.5 19.5
F.10
F.10
H.2
H.2
21.2 21.2
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
x18x18
x18.1x18.1
x19x19
x20x20
x21x21
x21.1x21.1
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
x21.4x21.4
x21.5x21.5
x21.9x21.9
x22x22
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
20.7 20.7
19.7 19.7
19.4 19.4
F.4
F.4 F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
20.5 20.5
19.5 19.5
F.10
F.10
H.2
H.2
21.2 21.2
1
2
1
EUH-2
EUH-2
EUH-2
T2 - 5,7
T2 - 2,4
T2 - 1,3
H1- 26
H1- 26
H1- 26
H1- 25
H1- 25
DIRECTORY
ACCESS CONTROL
PANEL
H1- 51
H1- 51
H1- 51
T2
H1- 51
H2-56
H2-56
H2-56
H2-56
3
EWH-1 H2-62
A. SEE SHEET E-001 FOR SYMBOLS AND ABBREVIATIONS.
B. SEE SHEET E-604 FOR KITCHEN EQUIPMENT SCHEDULE.
C. SEE SHEET E-604 FOR MECHANICAL EQUIPMENT POWER SCHEDULE.
D. SEE SHEETS E-601 THROUGH E-603 FOR PANEL SCHEDULES.
E. SEE SHEETS E-501, E-502 AND E-503 FOR ELECTRICAL DETAILS.
F. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED
OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER.
USE STRANDED CONDUCTOR FOR LARGER SIZES.
G. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO
MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR
DESIGNER.
H. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES
AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT.
I. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO
BUILDING LINES.
J. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF
FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE
RESISTANCE OF MATERIALS AND CONSTRUCTION.
K. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND
RAIN TIGHT.
L. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL
INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT
FURNISHED BY OTHERS.
GENERAL SHEET NOTES
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans WayKEYPLAN
B
A
NOT FOR
CONSTRUCTION
EP102A
2ND FLOOR POWER
PLAN - AREA A
11/24/2111/24/21
1/8" = 1'-0"
2ND FLOOR POWER PLAN - AREA A1
N
0 16'8'4'
SHEET PLAN NOTES
1 DOOR SECURED THROUGH ACCESS CONTROL SYSTEM.
2 ACCESS CONTROL FOR ELEVATOR CAB. COORDINATE
INTERFACE WIRING, ROUG-IN AND PROGRAMMING
REQUIREMENTS WITH THE OWNER AND THE ELEVATOR
CONTRACTOR.
3 PROVIDE FIRE ALARM JUNCTION BOX ADJACENT TO TENANT SPACE ENTRY
WITH BUILDING FIRE ALARM SYSTEM INITIATION CIRCUIT AND ANNUNCIATION
CIRCUIT FOR FUTURE INTERCONNECTION OF TENANT FIRE ALARM DEVICES
OR CONTROL PANELS.11/24/2111/24/21 BUILDING SHELL
BID PHASE III