HomeMy WebLinkAboutES101 - ELECTRICAL SITE PLANWINDSOR
BUILDING
(FUTURE)
HOTEL
CARMICHAEL
E.T.
E.T.
E.T.
MH
EX
EX
EX
EX
EX
1
2
3
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans WayKEYPLAN
B
A
NOT FOR
CONSTRUCTION
ES101
ELECTRICAL SITE
PLAN
11/24/2111/24/21
SHEET PLAN NOTES
1 (3) 600 KCMIL, #3/0, IN (3)4" C
2 (2) 500 KCMIL, #1/0, IN (2)3" C
3 500 KCMIL, #3, IN 3" C
11/24/2111/24/21 BUILDING SHELL
BID PHASE III