Loading...
HomeMy WebLinkAboutA106A 6th Floor Roof Plan - Area AProject: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032750 Veteran's WayPEDCOR DESIGN GROUP LLC 6th Floor Roof Plan - Area A THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2021 JAMES R. STUTZMAN, AIA, Carmel, Indiana. CONSTRUCTION DOCUMENTS 11-26-201911/26/2019 A 10 6 A Revision ID Transmittal Set Date Transmittal Set Name Change Name Change ID 01 02 11/26/19 5/10/21 Foundation Release Steel Release #2 BID PHASE II ADD OPENING IN STAIR #3, STEEL RELEASE - BID PHASE II 18, 20 Tuesday, October 5, 2021, BIMcloud: pedcordesign - BIMcloud as a Service/Wren - Building J/Building J Wren1 2 3 4 5 6 7 8 9 DOWN 12345678123456789DOWN1234567891011DOWN 32 # PLAN NORTH A1 A412 B2 A109C B1 A411 D1 A109C E1 A415 D1 A303 D1 A301 D1 A301 A1 A302 B1 A302 D1 A304 D2 A305 D2 A304 D1 A307 D2 A309 C2 A327 D1 A320 D1 A321 D1 A323 D2 A323 D1 A324 D1 A308 D1 A309 A4 A307 D2 A320 D1 A305 D2 A321 D3 A304 C3 A327 C3 A327 C3 A327 C3 A327 C1 A326 #DrgID #LayID 1 A201 2 A210 1 A209 1 A202 1 A203 2 A208 2 A203 1 A210 M8 M8 D3 A304 D3 A304 D3 A304 D3 A304 D3 A304 47'-9 3/4"3/4"9'-11 3/8"3/4"10'-0 7/8"20'-1 3/4"27'-8" 3/4"20'-0 1/4"3/4"27'-7 1/4" 3/4"9'-7 1/8"3/4"9'-7 7/8"3/4"26'-3 1/8"21'-5 1/8" 3/4"28'-0 5/8"5'-4 7/8" 1'-0 1/2"4'-8 7/8"2'-7"5'-5 1/4"2'-6 1/4"5'-5 3/4"2'-6 1/2"4'-9 1/8"5'-4 7/8" 1'-2 7/8" 2'-4" 3'-1 3/4" 1'-2 7/8"2'-8 1/2"5'-11 5/8"6'-3 7/8"2'-8 1/2"7'-0"2'-6 1/2"4'-1 3/8"2'-6 1/2"5'-8 3/4"20'-0 1/4"8'-6 1/8"3'-4 1/8"3'-4 1/8"4'-5 1/8"C2 A307 2 A211 22 2 2 2 2 2 4 88 88 8 8 17 12 12 12 17 17 7 12 12 13 15 15 15 16 99 7 77 8 8 8 8 13 17 77 13 13 4 9 9 99 18 77 13 13 13 99 99 99 99 99 99 99 9916 13 13 20 5 20 18 1818 2222 22 22 22 22 8 1717 S6J EIFS EIFS S8Di FLOOR PLANAREA AFLOOR PLANAREA BMATCH LINEFLOOR PLANAREA AFLOOR PLANAREA BMATCH LINE BUILDINGSECTIONBUILDINGSECTIONBUILDING SECTION BUILDING SECTION PLATFORM FOR GFRP URN. T/BOX = 58'-9 7/8" D1 A306 A3 A328 D2 A324 D1 A326 12'-4 3/4"17'-1 5/8"9'-2 7/8"7'-11 3/8"13'-4 3/8" 6'-7 3/4"12345678UP123456789UPUP9TREADS(11") UP CL 1 2 3 4 5 6 7 8 9 DOWN UP9TREADS(11")12345678123456789DOWN1234567891011DOWN UP8TREADS(11")12345678910111213141516171819DOWN UP 19 TREADS (11")A2 A103e1 A1 A503 A503 A2 A103e1 C1 A322 B4 A417 1 A209 1'-10 1/8"6'-5 7/8"14'-6 1/2"14'-2 3/8"10'-9 7/8"3'-4 3/4"7'-3 1/2"11'-7 5/8"8'-11 3/4" 28'-0 1/4" 17 77 10 ROOF ACCESS BALCONY ABV. BALCONY ABV. BALCONY ABV. RAILING 6'-6 5/8"15'-11 1/8"15'-11 1/2" 46'-6 3/4" B1 A503 9 9 77 2304A D3 A304 D1 A306 12345678UP123456789UPUP9TREADS(11") UP CL ROOF PLAN GENERAL NOTES: 1 Roof Plan A106A, B, A107A and B references and details the wood stud composition of all parapet walls and gables, with a cutting plane of +3' above roof deck. Or shown otherwise in elevations and sections. Details A109A through D reference and detail general roof assembly with a cutting plane above all roof. 2 PVC roofing goes up the back side of all parapets and gables U.N.O. or shown otherwise in elevation and sections. 3 Reference Sheets A109A, B and C for all gabled parapets and associated assemblies, including metal roofing, copings caps, vents and transom panels. ROOF PLAN NOTES: 1 Vent stacks, reference P series drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations. 2 Roof drains, reference P series drawings. 3 Standing seam metal roof, self-adhering underlayment throughout. 4 Elevator vent. Follow roofing manufacturer's required flashing details for curbs and penetrations. 5 Roof hydrant. Ref. P-Series drawings. 6 Mechanical equipment. Ref. mechanical drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations. 7 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 6" rigid insulation, and 6 mil. polyethylene vapor barrier. 8 Tapered roofing @ 1/2":1' 9 Pre-finished metal roof edge. 10 Pre-finished aluminum gutter. 11 Pre-finished metal coping. 12 Shaft opening below with roof curb/cap above. Ref. M-Series sheets for roof curb/cap design. 13 Break in structural roof decking. Ref. S-Series drawings. 14 Roof vents, ref. M-Series sheets. 15 PVC roofing membrane to wrap up sides of elevator shaft as well as on top of shaft. 16 Stair shaft to have PVC roofing membrane on the top of the shaft. Check elevations and wall tags for EIFS. 17 Provide crickets at any mechanical curb, typ. 18 Rubber roof walkway pad, typ. 19. Decorative urn. (Fiberglass-reinforced polymer fabrication) Ref. #### 20. Roof expansion and counter flashing detail joining the main roof to the side of the hotel wall. Hotel wall is an exterior gypsum board wall assembly with EIFS panels attached. See section details. 21. Wood framed boxes sheathed with preservative treated plywood, roofed with PVC membrane. Ref. #### 22. Splash blocks at downspout, typ. ROOF PLAN NOTES:1 Vent stacks, reference P series drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations.2 Roof drains, reference P series drawings.3 Standing seam metal roof, self-adhering underlayment throughout.4 Elevator vent. Follow roofing manufacturer's required flashing details for curbs and penetrations.5 Roof hydrant. Ref. P-Series drawings.6 Mechanical equipment. Ref. mechanical drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations. 7 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 6" rigid insulation, and 6 mil. polyethylene vapor barrier. 8 Tapered roofing @ 1/2":1' 9 Pre-finished metal roof edge. 10 Pre-finished aluminum gutter. 11 Pre-finished metal coping. 12 Shaft opening below with roof curb/cap above. Ref. M-Series sheets for roof curb/cap design. 13 Break in structural roof decking. Ref. S-Series drawings. 14 Roof vents, ref. M-Series sheets. 15 PVC roofing membrane to wrap up sides of elevator shaft as well as on top of shaft. 16 Stair shaft to have PVC roofing membrane on the top of the shaft. Check elevations and wall tags for EIFS. 17 Provide crickets at any mechanical curb, typ. 18 Rubber roof walkway pad, typ. 19. Decorative urn. (Fiberglass-reinforced polymer fabrication) Ref. #### 20. Roof expansion and counter flashing detail joining the main roof to the side of the hotel wall. Hotel wall is an exterior gypsum board wall assembly with EIFS panels attached. See section details. 21. Wood framed boxes sheathed with preservative treated plywood, roofed with PVC membrane. Ref. #### 22. Splash blocks at downspout, typ. SCALE: 1/8" = 1'-0" 1 6th Floor / Roof Plan A106A 0 4'8'16'SCALE: 1/8" = 1'-0" 2 3rd Floor / Courtyard Roof Plan A106A 0 4'8'16' SCALE: 1/8" = 1'-0" 3 Existing Stair #4 Roof Plan A106A 0 4'8'16'