Loading...
HomeMy WebLinkAboutA109D Roof Plan - Roof AccessProject: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032750 Veteran's WayPEDCOR DESIGN GROUP LLC Roof Plan - Roof Access THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2020 JAMES R. STUTZMAN, AIA, Carmel, Indiana. CONSTRUCTION DOCUMENTS 11/26/2019 A 10 9 D Revision ID Transmittal Set Date Transmittal Set Name Change Name Change ID 01 10/5/21 ADLS ISSUE #2 ARCH ONLY 1 1 2 2 3 3 4 4 5 5 A B C D A B C D BIMcloud: pedcordesign - BIMcloud as a Service/Wren - Building J/Building J Wren - Tuesday, October 5, 2021 EIFS PVC EIFS M8 PVC PVC LOW M8 M8 M8 M8B4 A109D A5 A109D A4 A109D S8Di RUBBER ROOF WALKWAY PAD EXISTING HOTEL D4 A412 A1 A502 B3 A502 A1 A502 B3 A109D A3 A109D 5'-6 1/2"5'-10 1/2"10'-10 1/4"5'-10 3/4"4'-9 1/4"16'-2 1/2"3'-8 3/4"19'-11 1/4"B4 A109D A5 A109D A4 A109D ELEVATOR SHAFT ROOF STAIR SHAFT FLAT ROOF STAIR SHAFT SLOPED ROOF EXISTING HOTEL PARAPET ABV. PVC MEMBRANE TAPERED INSULATION D4 A412 A1 A502 B3 A502 A1 A502 10'-7 3/4" B3 A109D A3 A109D B1 A303 B3 A502 A1 A502 D4 A412 PVC MEMBRANE B1 A303 B3 A502 A1 A502 PVC ROOFING TO RUN UP WALL UNDER EIFS VENEER, VENEER TO BE MIN. 8" ABOVE ROOF PLANE 1 1/2" EIFS VENEER EXISTING HOTEL EIFS CORNICE BEYOND PVC MEMBRANE A4 A323 A1 A502 B4 A109D PVC ROOFING TO RUN UP WALL UNDER EIFS VENEER, VENEER TO BE MIN. 8" ABOVE ROOF PLANE 1 1/2 EIFS VENEER EXISTING HOTEL 2" BLDG. EXPANSION JOINT W/ FLASHING, TYP. RUBBER ROOF WALKWAY PAD ELEVATOR SHAFT 7. SEE A418 B1 A303 B3 A502 C3 A502 +50'-0" 6th Floor / Roof D4 A412 1 1/2" EIFS VENEER PVC MEMBRANE 8" CMU PVC ROOF WALKWAY PAD 8" CMU BEYOND 8" CFS FRAMING BEYOND COORDINATE FRAMING TO BRIDGE DOOR x21.1 21.2 x21.4 x21.5x21 C3 A502 C3 A502 B3 A502 +50'-0" 5 6th Floor / Roof A1 A502 B4 A109D PVC ROOFING TO RUN UP WALL UNDER EIFS VENEER, VENEER TO BE MIN. 8" ABOVE ROOF PLANE 1 1/2 EIFS VENEER EXISTING HOTEL 2" BLDG. EXPANSION JOINT W/ FLASHING, TYP. SIM. CMU PVC ROOFING MEMBRANE SIM. W/ FLAT RAKE A4 A323 SCALE: 1/4" = 1'-0" B1 6th Floor Parapet Framing Plan A109D 0 2'4'8'SCALE: 1/4" = 1'-0" B2 6th Floor Access Roof Plan A109D 0 2'4'8' SCALE: 1/4" = 1'-0" A3 NW Roof Access Elevation A109D 0 2'4'8'SCALE: 1/4" = 1'-0" A5 NW Roof Access Elevation A109D 0 2'4'8'SCALE: 1/4" = 1'-0" A4 NW Roof Access Elevation A109D 0 2'4'8' SCALE: 1/4" = 1'-0" B4 NW Roof Access Section A109D 0 2'4'8' SCALE: 1/4" = 1'-0" D3 NW Roof Access 3D Perspectives A109D 0 2'4'8' SCALE: 1/4" = 1'-0" B3 Stair #3 Section Detail A109D 0 2'4'8'